Car parks have a large rain collecting surface area with no where for the water to go unless you manage it. Decades ago no one cared but nowadays council planners expect the water to be kept out of the local drainage system. It even applies to peoples own driveways - if you wanted to build a driveway for a house now then you would have to demonstrate you have adequate rain water collection and a soak-away. You are not allowed to use the existing drainage network. Multiply that by, say, 300 for a car park and you need big man made pond areas. The reason standards have got more onerous is not just from hindsight but because we now get heaver bursts of rain than we used to - global warming.Maybe there are some cost saving ideas for Thanet to have taken on? But a car park should be pretty cheap to construct as well - that isn't going to make a meaningful difference.
Climate change affects all infrastructure projects not just rail. Bad example but we are seeing more and more Victorian rail infrastructure not coping with the extremes of heat and rain.
Whether we are over compensating in the UK for global-warming / climate-change I do not know. Whether the UK is more at risk I do not know.
NEW THREAD ANYBODY ?.
But as a gardener I am really noticing the difference. I remember about fifteen years ago talking to a climate expert about global warming. He said do not expect warmer drier summers. He said in the UK we will get milder winters and wetter more tropical weather all year. As a gardener I can now see its coming true. We have had our dry spells BUT I can say I suffer more from damp than I used to - I have to manage rain water run off undermining part of my amateur civil engineering. Plants growing faster and all through winter. No longer just a cutting back once in Spring and once in Autumn. I remember when you could judge Spring was warm enough too plant out when the grass needed mowing. Now I see people struggling to mow their grass on damp winter days.
I think Haute Picarde was built new on the LGV ?. It was not already there on a classic line whereas Lockerbia is so not expense and I am not sure how many passing HS2 trains will serve it.Lockerbie is the equivalent of Haute Picardie in terms of population density. Even Oxenholme/Penrith where it is also similar have tourism. The population density south of Manchester is much higher.
My fear is the Jubilee line will not cope for much longer. I can see the Elizabeth line is already getting quite full and already extra trains being ordered.OK so here is the complete list of stations that are at least sometimes overcrowded - or have been upgraded to give them more space.
On the Victoria Line:
Off the Victoria Line:
- Kings Cross St Pancras
- Oxford Circus
- Green Park
- Victoria
So yes the stations on the Victoria line in zone 1 were clearly built too small, and the ones built with narrow island platforms around 1900 have proven dangerous. However the size was increased for the Jubilee Line Extension which has proved completely adequate, before being increased again for the Elizabeth Line and perhaps would be even larger for Crossrail 2 which has significantly higher costs per km than Crossrail 1.
- Bank
- Camden Town
- Covent Garden
- All the stations built with narrow island platforms
I think our more and more expensive designs are only just keeping ahead !.
Actually perhaps the problem in the UK is we should not try to cater for the demand we expect but just build same as we did 20, 40 or 60 years ago. It would be easier to get justification. Then when the new route quickly filled up we could say there you are look how successful that was and ask for the money to build yet another line. Overall it might cost more but we will have done it in manageable chunks. Parallels with road building apply.
Instead we think as far ahead as the infrastructure life would be, come up with a good estimate but then have an uphill struggle getting a go ahead. So we perhaps build something expensive but start so late it is guaranteed to fill up so soon.
In Hiogh Speed rail terms everyone else got going 40 years before us.
Not in my experience. In many places the station exit(s) cope at a slower pace than the people walking along the platform. Gets really alarming when the queue to leave is still there as the next train disgorges its passengers !. I have noticed the Elizabeth line filling up but it is reassuring to see it is still coping - currently. With the extra trains already ordered I can see platform exits getting really busy. My rough feeling is that the Elizabeth line has revealed how much pent up demand there really was when it was conceived - more than expected.For a given number of people using a station they are more spread out along the train so there will be fewer reaching the exit at the same time, so if anything you could get away with smaller exits.
== Doublepost prevention - post automatically merged: ==
BUT for how long would the cheaper solutions last ?.OK so what's the total ridership predicted to be? 300m like the Victoria line got in 2019? And with a larger number of suburban stops?
So basically that would point to what we could call the bronze solution for the suburban stations where there is a single Victoria Line suburban entrance plus a lift for the disabled plus a staircase at the other end for emergencies. Even something that basic would almost certainly prove perfectly adequate.
Silver would be two Victoria line style entrances - one at each end - plus lifts for the disabled. Gold would be Jubilee line extension style stations, and platinum would be anything more elaborate than that.
I think we are well into the platinum for the suburban stops, it's ridiculous.
Presenting a "silver" and a "gold" solution from the above to the politicians would be giving them a reasonable choice that makes good use of taxpayers money.
(short term-ism).
But, on the other hand, then can we justify thinking that far ahead to the politicians ?.
(too much forward thinking for many).