Yes, back on track!
(Should I get my coat?)
It was in danger of getting derailed.
But I think trying to pick political fights that could be avoided with a bit more spent on tunnels and the like is a big problem.
Tunneled construction has probably got cheaper relative to surface construction in a big way in recent decades, and perhaps our infrastructure planning is simply not keeping up with the times?
There are quite a few people who feel they weren't treated well by HS2. I do speak to someone affected and can see their point. They also said that many people who were directly affected did not demand anything off their MPs and upset people have this nimby demanded tunnels narrative. One person HS2 upset was the man who owned the company that owned the land at Euston. He successfully settled out of court, but having been excited about involvement in Euston redevelopment now runs a campaign to cancel hs2 in its entirety. The campaign is pure misinformation mostly, but he's invited onto talk tv to spout nonsense, and that doesn't do the PR much good. Perhaps they could have worked alongside the then current owners. There are other Camden nimbys who funded some of the initial work from Byng. Personally, I think the chiltern locals got a little too much blame - there were changes alll along the line and some of the most expensive happened in London.
Re the 4 mins and 15%; I’ve not seen that officially (that’s not to say it wasn’t said somewhere official), and it doesn’t sound right I agree.
However a 4 minute change on a 40 minute journey (London to Birmingham) has a much higher drag on demand proportionally than 4 mins on a 4 hour journey (London to Scotland).
4 mins may not seem a lot, but could mean another set required for a particular journey pair and additional staff costs, which may have affected the modelling. William Barter has made the point about phase 2a's speeds meant that there were savings in other ways as a result, else the timetable wouldnt work.
Or they followed the standard modern model of wildly overspeccing it and no thinking outside the box.
The thing for the Elizabeth line is it has encouraged a lot of building. If you see some of the places just outside central London, they are expanding very quickly and therefore you need to prepare for later growth. The stations in the centre have passive provision for an additional 2 carriages, which is likely to be needed considering the rate growth and therefore will be cost effective in the future. HS2 itself has built in passive provision where its built bridges over it that are wider than necessary if there is a future possibility that the other route might expand too, or as in the extra wide spans for the Aylesbury link etc.
Nimbyism also isn’t an issue unique to Britain and other countries haven’t had the same cost blowouts.
As I pointed to earlier with the link from DW, Germany has many cost blowouts.
https://www.dw.com/en/why-german-building-projects-run-over-time-and-budget/a-75206468 similar issues to what we are faced with. Changes to the route during the hybrid bill are a large factor in the pre goahead cost increase, but not the only one and not all Nimby driven (see above)
I'd design the next stages of HS2 for a maximum of 186 mph/300 kph.
The thing is the alignments are there for Manchester and for the Golborne link (which I beleive is still safe guarded). A lot of land has been purchased so changing phase2a would be daft, would cost more so might as well use the alignment. To Manchester, the most expensive bit, where a lot of the cost was, was for the tunnel and station - tunnel was to be 225kph, so no change required there either.
Speed isnt the big factor that is made out to be. I go back to my EWR bedford Cambridge comparison, a similar distance and not a huge difference in cost compared to phase 2a, despite being 100mph and not electrified. The alignment speed of hs2 isnt that much different from the LGV lines.
It's unfortunate much of the powers for acquiring land for Birmingham-Crewe-Manchester have lapsed.
Birmingham - Crewe has, but Crewe - Manchester is still going through parliament.
And HS2 phase 2 to Crewe/the East Midlands is much more expensive than projects in developed Asia/continental Europe and doesn't involve big cities.
See my EWR point. But a factor in their costs is the population density and therefore utilities, crossing routes that need moving even in the rural areas that are passed. In any case, this comes back to the question in the title of this thread, its not HS2 specific.
Its a good idea, but to be politically viable the project has to directly benefit the people affected by the construction.
The people affected should also understand when the project benefits them - many places affected do have benefits and these are either ignored or not understood. Ultimately, few people are happy with a construction site near them for 15 years whether it eventually benefits them or not.
The only requirement change is disabled access which is supposed to be a reasonable adjustment and ticket barriers I guess. That doesn't justify the difference between the £1.1m in today's money spent on
Winnersh Triangle railway station and the £38.8m spent on e.g.
Thanet Parkway. Nor does the need for a bridge/tunnel across the line which presumably Winnersh triangle avoided.
Winnersh Triangle is pretty much made of wood, its almost a DIY job, has no lift just steps up. Its exceptionally basic and not much to compare to Thanet Parkway.
And the person who built HS1 complained they never even spoke to him.
He was trying to sell another idea at the time and if you read his interview, he gets quite a few things wrong about HS2. That wouldn't have filled me with hope.
My bold - Really. Every weekday morning peak for decades (since before 1988 iirc) the Victoria line platforms at Victoria get closed due to dangerous overcrowding. I have seen many unpleasantly full platforms (particularly for me when changing at Oxford Circus. Bank Central Line recently got rebuilt. There were platforms on the Northern line that were horrendously narrow and had two faces. Elizabeth line is getting pretty busy, its levels of use have risen quicker than hoped for.
And with it encouraging development, and with that large economic return, that's only going to get busier. Whilst I'm a big fan of what Britain Remade stand for, their analysis can be messy and often miss the value of things they point out as costs. Their Elizabeth line comparison is against a cut and cover metro in Madrid that isn't going to carry nearly as many people as the Elizabeth line, and which required bespoke stations due to constricted space under London and needs to connect to other lines.