HS2 TBM Progress

PLY2AYS

Member
Joined
26 Mar 2024
Messages
518
Location
Montserrat
The tunnels are about 7200m

Once startup has got upto speed, should be able to dig about 100-130m average per week. So would take about 60-70 weeks, which is consistent with June 2027 breakthrough.
I agree, however I’m just going by the timings and distances of the Northolt Tunnels.
Of course it’s a slower start before it speeds up, but I was merely comparing past tunnelling (perhaps naively I admit)
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

hwl

Established Member
Joined
5 Feb 2012
Messages
8,235
I agree, however I’m just going by the timings and distances of the Northolt Tunnels.
Of course it’s a slower start before it speeds up, but I was merely comparing past tunnelling (perhaps naively I admit)
If you look back at post #706 https://www.railforums.co.uk/threads/hs2-tbm-progress.240683/post-7642534 I did a quick back of the envelope based on the HS2 expected progress map:

"I just did some further back of the envelope based on the map in the pdf based on expected dates for the 2 intermediate locations:
Based on the map initial pace for the TBMs is slowish at 95m/week or 13.6m/day for the 1st ~2km, then 220m/week (31.4m/day matching the highest pace for short period to the west of OOC) over this summer for 1.75km of straight tunnel - this is is dead straight and the tunnels are widely horizontally spaced, then 76m/week (10.5m/day) for the last 45% with lots of curves, tunnels moving to above and below each other for the last ~1km and plenty of complexity (and presumably a long break at Christmas and New Year).

The average pace hides lots of variation..."

Mark W has since said the tunnelling window is 15-18 months and June 2027 completion was based on suitably pessimistic assumptions for 17 months. So if all goes well it could be April 2027 or not so well July 2027. They are also planning a long Christmas/New Year break which will also allow the segment deliveries to catch up.

Pace in the first 2 weeks is about a quarter of the average pace they reckon till the first marker on the map.
 

PLY2AYS

Member
Joined
26 Mar 2024
Messages
518
Location
Montserrat
If you look back at post #706 https://www.railforums.co.uk/threads/hs2-tbm-progress.240683/post-7642534 I did a quick back of the envelope based on the HS2 expected progress map:

"I just did some further back of the envelope based on the map in the pdf based on expected dates for the 2 intermediate locations:
Based on the map initial pace for the TBMs is slowish at 95m/week or 13.6m/day for the 1st ~2km, then 220m/week (31.4m/day matching the highest pace for short period to the west of OOC) over this summer for 1.75km of straight tunnel - this is is dead straight and the tunnels are widely horizontally spaced, then 76m/week (10.5m/day) for the last 45% with lots of curves, tunnels moving to above and below each other for the last ~1km and plenty of complexity (and presumably a long break at Christmas and New Year).

The average pace hides lots of variation..."

Mark W has since said the tunnelling window is 15-18 months and June 2027 completion was based on suitably pessimistic assumptions for 17 months. So if all goes well it could be April 2027 or not so well July 2027. They are also planning a long Christmas/New Year break which will also allow the segment deliveries to catch up.

Pace in the first 2 weeks is about a quarter of the average pace they reckon till the first marker on the map.
Legendary. Thanks for that! Makes me feel a touch more optimistic! :D
 

Geogregor

Member
Joined
16 Sep 2016
Messages
455
Location
London
Legendary. Thanks for that! Makes me feel a touch more optimistic! :D

To be honest no need to worry about the speed of tunneling. The tunnels will stay empty for years anyway. So whether they finish in July of 2027 or some time later it doesn't really matter. ;)

What matter is that the tunnels are being build.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,235
To be honest no need to worry about the speed of tunneling. The tunnels will stay empty for years anyway. So whether they finish in July of 2027 or some time later it doesn't really matter. ;)

What matter is that the tunnels are being build.
1. Investor confidence in the Euston station (including NR rebuild)
2. A potential spoil removal route via conveyors for digging out the Euston station HS2 site, it will need digging out to 20m+ below existing track level (which makes spoil removal by rail tricky in the later stages)
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,015
Location
West Wiltshire
I heard a rumour that the second TBM will launch w/c 2 March. Anyone know more?
Might be, they did indicate second TBM would start about month later.

They are normally staggered as TBMs create a certain amount of ground vibrations, so to avoid loose lumps of dirt falling by other cutterhead, they are not run side by side
 

Geogregor

Member
Joined
16 Sep 2016
Messages
455
Location
London
Webinar from British Tunneling Society about the HS2 Main Works Lots S1 & S2- Skanska Costain STRABAG Joint Venture:

 

76020

Member
Joined
1 Nov 2012
Messages
198
I note that the distance for Madeline is in miles but the finished tunnels are quoted in kilometres!
The distance for Madeleline is shown in Metres and the finished tunnels is shown in Kilometres, it is easy to confuse M for Miles when it is actually Metres. Another update from 20 Feb is 63 Meters is now dug
 
Last edited:

themiller

Established Member
Joined
4 Dec 2011
Messages
1,380
Location
Cumbria, UK
The distance for Madeleline is shown in Metres and the finished tunnels are shown in Kilometres, it is easy to confuse M for Miles when it is actually Metres. Another update from 20 Feb is 63 Meters is now dug
That just shows why I must pay attention! I’m going to claim that I was over-tired.
 

alf

On Moderation
Joined
1 Mar 2021
Messages
422
Location
Bournemouth
A relative has windows looking out onto the WCML opposite the old Primrose Hill station.

He tells me at around Noon today a class 66 came noisily past on the down fast.
It hauled 12 dark blue wagons loaded up with chunks of London Clay. A dead clas 66 was at the back end.

The first fruits of the boring machine from OOCommon & not at night as was predicted.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,897
Location
Mold, Clwyd
Would it have been this one? (Just a guess from RTT).
6B65 Euston to Forders Sidings

Although I can't decode MBR at Euston from the sectional appendix.
And why would a loaded spoil train, which presumably starts from Willesden Euroterminal, need to visit Euston station?
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,235
Would it have been this one? (Just a guess from RTT).
6B65 Euston to Forders Sidings

Although I can't decode MBR at Euston from the sectional appendix.
And why would a loaded spoil train, which presumably starts from Willesden Euroterminal, need to visit Euston station?
Would it have been the HS2 siding between the old platform 17/18?
It is the former P17.

Empty from Willesden to Euston then loaded with spoil as there is lots of digging to do in and arround Euston
 

E6007

Member
Joined
3 Jan 2018
Messages
135
Location
WCML South
Although I can't decode MBR at Euston from the sectional appendix.

MBR is Material by Rail, a hang over from earlier in the project when we at TfL were putting pressure on HS2 to move material by rail (in and out) instead of putting it all of Euston's on the local roads
 

Geogregor

Member
Joined
16 Sep 2016
Messages
455
Location
London
It is the former P17.

Empty from Willesden to Euston then loaded with spoil as there is lots of digging to do in and arround Euston

But is any digging ongoing at Euston? I thought they are still thinking what to build ;)

Anyway, nothing to do with the TBMs...
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,015
Location
West Wiltshire
But is any digging ongoing at Euston? I thought they are still thinking what to build ;)

Anyway, nothing to do with the TBMs...
Yes recently restarted, near the Granby Terrace overbridge area.
This area is all being dug out as a big trench ahead of TBMs arriving.
 
Last edited:

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,897
Location
Mold, Clwyd
Looking on RTT at the departures from Willesden Euroterminal yesterday, there were two of HS2 interest.
6R93 (cancelled) was booked to run to New Bilton, Rugby, which is one of the sites where HS2 spoil is tipped. This runs direct down the WCML (via Northampton).

There is also a 4E52 (also cancelled yesterday) to Hartlepool, presumably being the return empties of the HS2 Euston Tunnel segments flow.
This works via Gospel Oak and Harringay and down the ECML (via Spalding).
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,015
Location
West Wiltshire
The in your area map, had update for TBM Madeline on 6th March

7059metres remaining

 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,897
Location
Mold, Clwyd
It's still only about 3m/day.
I wonder why they don't post distance from the start of the drive (141m), as they did for previous TBMs.
 

stuu

Established Member
Joined
2 Sep 2011
Messages
3,762
Presumably going very carefully given they are boring under the tracks to the XR depot, the Grand Union Canal and the WLL
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,015
Location
West Wiltshire
Presumably going very carefully given they are boring under the tracks to the XR depot, the Grand Union Canal and the WLL
And the first part of the drive is a relatively shallow depth below the surface, the tunnels initially slope down from the sub surface station.
 

Geogregor

Member
Joined
16 Sep 2016
Messages
455
Location
London
The second Euston TBM has started digging:


Article in New Civil Engineer:

And blog post from site visit:

Including ride through the logistics tunnel:
old-oak-common-march-2026-01-768x427.jpg
 
Last edited:

WWTownEnth

Member
Joined
21 Mar 2014
Messages
697
The second Euston TBM has started digging:


Article in New Civil Engineer:

And blog post from site visit:

Including ride through the logistics tunnel:
Good news…….

 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,015
Location
West Wiltshire
The In your area map has been updated

Madeline 20 Mar 7059m remaining (unchanged since 10 Mar update)
Karen 20 Mar 7180m remaining (first update since starting)

 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,015
Location
West Wiltshire
In your area map has been updated 27 March

Madeline 7050m remaining. (just 9m in a week)
Karen 7163m remaining (17m in a week)

seems to be very slow progress, just few rings

 

Roger B

Established Member
Joined
16 Jun 2018
Messages
1,259
Location
Gatley
In your area map has been updated 27 March

Madeline 7050m remaining. (just 9m in a week)
Karen 7163m remaining (17m in a week)

seems to be very slow progress, just few rings


At that rate, it'll take Madeline over 15 years to complete her tunnel - they might even have finished Euston by then!
 

Geogregor

Member
Joined
16 Sep 2016
Messages
455
Location
London
In your area map has been updated 27 March

Madeline 7050m remaining. (just 9m in a week)
Karen 7163m remaining (17m in a week)

seems to be very slow progress, just few rings


All the public activities (visits by dignitaries and media crews) due to start of the second TBM must have disrupted progress somehow. Also, they are still just starting, so threading carefully.
 