Yes, just watching online it seems that there’s a lot of waiting for a platform.I believe there was also a signalling issue somewhere around Stockport on Saturday morning (the first day) which caused some delays. To compound this, some of the northbound Avanti and XC were running late due to delays elsewhere and this complicated the situation. Some trains were taking 20 minutes for the short distance from Cheadle Hulme to Stockport (usually 4-5 minutes), presumably awaiting a platform.
Some of the Avanti & TPE services can run away to Longsight, and the Crewe local services hide in platform 3A, but the reverse has to be done generally on the down fast over the viaduct so is a bit of a bottleneck.
Just a current snapshot:
- 5K18 on the viaduct (goes to 2 for 2K18)
- 5K39 in 3A (Crewe EMU)
- 5T82 in 3 (from Cleethorpes)
- 5A48 in 4 (Pendolino) (became 5A54 for a while)
- 2B34 in 0 (Buxton DMU) (ECS had to reverse at Heaton Norris Junction to reach platform 0, and can only be done by diesels because it requires reversing after taking the junction to Reddish & Denton)
- 1H21 (another Pendolino) waiting for 3 or 4 to become free
Last edited:
