Diverting the ECML around Welwyn's bottleneck

Status
Not open for further replies.

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,373
Just doing a count of current,
6 Long Distance,
4 Thameslink,
4 Great Northern (that stop at Welwyn North)
4 Great Notherrn (that don’t Kings Lynn and Peterborough)

So realistically I would expect 2x Long Distances to go, but on the current loadings would we actually replace them with other services. Hitchin - Cambridge seems to also be full with 6 trains. Perhaps staying at 16 (maximum length) trains would be enough if it runs reliably. The Kings Lynn service might be able to run fast to Cambridge in the peak but as other threads highlight the Letchworth stopping service takes up capacity that prevents that happening.
I'd imagine that a lot of people would like Horsham to Peterborough to terminate at Letchworth, and to have a separate Kings Cross to Peterborough service. This is presumably something that could happen if there were paths freed up at Welwyn (and space freed up at Kings Cross).
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,805
Location
Central Belt
Very true, I almost forget that the reduced use of the platforms at Kings Cross also helps other things. I also suspect that extending more platforms to 12 cars will be much cheaper then bypassing the section. Even with the current timetable. Couple that of course with selective door operation. There are still short trains on that route, LNER and GC are still not running maximum length in the peak.
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,972
Location
Airedale
I'd imagine that a lot of people would like Horsham to Peterborough to terminate at Letchworth, and to have a separate Kings Cross to Peterborough service. This is presumably something that could happen if there were paths freed up at Welwyn (and space freed up at Kings Cross).
As there is a half-hourly KGX-PBO in the peaks there's no reason why an off-peak service shouldn't run.
You might actually run KGX-PBO (fast FPK-SVG) plus TL to Cambridge (ditto) and TL to Letchworth (stopping). That would make rather more sense than the present KGX-CBG stopper, which was never intended to be permanent.
When's the next TL timetable recast? :)

However, it leaves Welwyn exactly as is, so we're OT and almost in the real world :)
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,403
Location
The Fens
As there is a half-hourly KGX-PBO in the peaks there's no reason why an off-peak service shouldn't run.
No platforms at Kings Cross, off peak this is taken by the open access operators.

the present KGX-CBG stopper, which was never intended to be permanent.
Cambridge-Belle Isle is permanent, the only change is the trains run to/from Kings Cross not Maidstone.
 

Helvellyn

Established Member
Joined
28 Aug 2009
Messages
2,581
Just doing a count of current,
6 Long Distance,
4 Thameslink,
4 Great Northern (that stop at Welwyn North)
4 Great Notherrn (that don’t Kings Lynn and Peterborough)
I think it's more than six long-distance:
  • 2 x LNER to Edinburgh
  • 1 x LNER to Newcastle
  • 1 x LNER to Lincoln / York
  • 2 x LNER to Leeds
  • 1 x LNER to fast Edinburgh (every two hours)
Then you have Hull Trains, Lumo and Grand Central slotting in as well.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,898
I think it's more than six long-distance:
  • 2 x LNER to Edinburgh
  • 1 x LNER to Newcastle
  • 1 x LNER to Lincoln / York
  • 2 x LNER to Leeds
  • 1 x LNER to fast Edinburgh (every two hours)
Then you have Hull Trains, Lumo and Grand Central slotting in as well.

It’s 6 LNER plus the open access. The fast Edinburgh is hourly, and part of the 2tph in your first bullet.
 

A S Leib

Established Member
Joined
9 Sep 2018
Messages
3,370
That is the thing as you say, if we get rid of really long distance traffic you could probably have this kind of pattern in the high peak across the viaduct.

1. LNER (non stop Peterborough)
2. Great Northern - Kings Lynn
3 &4 Great Northern Welwyn Garden City and Welwyn North
5. Thameslink - Peterborough
6. LNER (non stop Peterborough)
7. Great Northern Peterborough
8 & 9 Great Northern Welwyn Garden City and Welwyn North
10 Thameslink - Cambridge.
Stevenage to Leeds is a slightly larger flow than Peterborough to Leeds (PBO substantially ahead for York, Edinburgh and Newcastle, which might change a bit with more direct services), with 49,000 journeys per year, so I don't think cutting Stevenage's LNER service completely would be popular.
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,805
Location
Central Belt
I think it's more than six long-distance:
  • 2 x LNER to Edinburgh
  • 1 x LNER to Newcastle
  • 1 x LNER to Lincoln / York
  • 2 x LNER to Leeds
  • 1 x LNER to fast Edinburgh (every two hours)
Then you have Hull Trains, Lumo and Grand Central slotting in as well.
Very true in the off-peak. However in
the peak there are less long distance. GN 4th for Welwyn North not helping. I wasn’t clear on my post. To me the cheapest option to increase capacity would be reduce Welwyn North to 2 trains per hour.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,403
Location
The Fens
Very true in the off-peak. However in
the peak there are less long distance. GN 4th for Welwyn North not helping. I wasn’t clear on my post. To me the cheapest option to increase capacity would be reduce Welwyn North to 2 trains per hour.
Reducing Welwyn North peak time calls from 4tph to 2tph does not increase capacity in the 2 track section, which would still be 18tph. The trains would still be running, just not stopping at Welwyn North. There would be a marginal gain in resilience but no gain in capacity.
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,805
Location
Central Belt
Reducing Welwyn North peak time calls from 4tph to 2tph does not increase capacity in the 2 track section, which would still be 18tph. The trains would still be running, just not stopping at Welwyn North. There would be a marginal gain in resilience but no gain in capacity.
It was my understanding the stop takes up 2 paths.

If this is true or not people with better knowledge can say. But it makes sense as the train is stopped for about 2 mins. In that time I am sure a non-stop train could clear the whole section.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,403
Location
The Fens
It was my understanding the stop takes up 2 paths.

If this is true or not people with better knowledge can say. But it makes sense as the train is stopped for about 2 mins. In that time I am sure a non-stop train could clear the whole section.
The stopping service that calls Welwyn GC-Welwyn North-Knebworth (or vice versa) does take nearly twice as long to get through the 2 track section, compared to a non-stop train. It isn't just about the stopping time, it is also about how fast the trains are going as they enter and leave the 2 track section. particularly at the Welwyn GC end.

The peak hour calls at Welwyn North are not calling at Welwyn GC. In the morning the peak hour calls at Welwyn North do not stop at Knebworth either, Welwyn North is the only stop between Hitchin and Kings Cross. In the evening peak the Welwyn North calls are the first stop from Kings Cross and they are still doing 90-100 mph as they pass through Welwyn GC. This means that the peak hour Welwyn North calls have much less impact than the all day stopping service calls, and taking them out is not enough to create an extra path. Network Rail would just bank it as extra resilience.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,403
Location
The Fens
I commuted on the GN for 25 years and that's not my experience. In particular, trains merging in from the slow lines stop the job on the fast lines unless the nearest train is a long way away, and this is exaggerated when trains are running late. it isn't just about how the service is supposed to behave when everything runs on time.
 

William3000

Member
Joined
24 May 2011
Messages
600
Location
Cambridgeshire
I commuted on the GN for 25 years and that's not my experience. In particular, trains merging in from the slow lines stop the job on the fast lines unless the nearest train is a long way away, and this is exaggerated when trains are running late. it isn't just about how the service is supposed to behave when everything runs on time.
I’ve noticed the same.

Couple of things I’ve always wondered when travelling along this stretch is - could the point speeds between slow and fast in both directions be increased? Not sure what it is currently and maybe it’s the maximum.

The other is, I notice that there appears to be 4 tracking bed that runs about 800 metres or so south of the existing point at which 4 tracks merge into two (see green arrow), which shows the stretch where the four tracking bed appears to be there before the viaduct over Robbery Bottom Lane. While the northern most bridge appears to have its portals bricked up the rest of the route looks clear aside from electrification masts. Could four-tracking an additional 800 metres lead to marginally quicker clearances and greater resilience. Obviously such a move would still cost quite a lot for probably little benefit but if it let to an additional path per hour or at least greater resilience could it be worth it? While still not cheap it would cost a fraction of an additional tunnel bore and second Digswell Viaduct. Overall it would reduce the two track section from about 4.8km to 4km.
 

Attachments

  • IMG_2789.jpeg
    IMG_2789.jpeg
    487.6 KB · Views: 35
  • IMG_2788.jpeg
    IMG_2788.jpeg
    264.3 KB · Views: 32
  • IMG_2787.jpeg
    IMG_2787.jpeg
    411.9 KB · Views: 34
  • IMG_2786.jpeg
    IMG_2786.jpeg
    363.9 KB · Views: 33

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,403
Location
The Fens
The other is, I notice that there appears to be 4 tracking bed that runs about 800 metres or so south of the existing point at which 4 tracks merge into two (see green arrow), which shows the stretch where the four tracking bed appears to be there before the viaduct over Robbery Bottom Lane. While the northern most bridge appears to have its portals bricked up the rest of the route looks clear aside from electrification masts. Could four-tracking an additional 800 metres lead to marginally quicker clearances and greater resilience. Obviously such a move would still cost quite a lot for probably little benefit but if it let to an additional path per hour or at least greater resilience could it be worth it? While still not cheap it would cost a fraction of an additional tunnel bore and second Digswell Viaduct. Overall it would reduce the two track section from about 4.8km to 4km.
This was all done deliberately when the track and signalling were upgraded in the early 1970s, in preparation for electrification and HSTs.

Couple of things I’ve always wondered when travelling along this stretch is - could the point speeds between slow and fast in both directions be increased? Not sure what it is currently and maybe it’s the maximum.
The turnouts at both Digswell and Woolmer Green have been 70mph since the early 1970s changes, and the locations are different compared to what existed before. As your pictures show, the main reason that the Woolmer Green crossovers were moved was that there wasn't enough space for 70mph turnouts at the old location. The 70mph turnouts are far more important for capacity than having a slightly shorter 2 track section.

What also mattered then was signal locations and spacing. With lights on sticks the signal berths are fixed, and care has to be taken where to place the signals in relation to the turnouts and stations. At the Woolmer Green end what mattered was having a full signal berth between the Woolmer Green turnouts and Knebworth, somewhere to hold a train that is on the four track section but not blocking either the Knebworth platforms or the two track section.

Moving the junction slightly makes little difference while the signals have to move too. The trains still have to clear the associated track circuits for the next train to follow.

What I don't know is whether ECTS will make any difference.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,898
What I don't know is whether ECTS will make any difference.

It will, when the signals go. A stopping train off the slows following a fast will get a movement authority a little earlier than it would with signals. To go all Paul Daniels, not a lot, but every second counts.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,588
Location
Torbay
It will, when the signals go. A stopping train off the slows following a fast will get a movement authority a little earlier than it would with signals. To go all Paul Daniels, not a lot, but every second counts.
You've said previously the additional ETCS block markers are there already, waiting to be exploited by suitably equipped trains, so even before the signals go entirely a fitted train should be able to follow another fitted or unfitted train more closely, while an unfitted one would still be limited by the longer signal blocks.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,898
You've said previously the additional ETCS block markers are there already, waiting to be exploited by suitably equipped trains, so even before the signals go entirely a fitted train should be able to follow another fitted or unfitted train more closely, while an unfitted one would still be limited by the longer signal blocks.

apparently not, because it needs signals away fortrains to be driven to the block markers.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,621
Location
Northampton
apparently not, because it needs signals away fortrains to be driven to the block markers.
Interesting, IIRC you (or possibly some other similarly knowledgeable person) mentioned that Thameslink changed the conventional signalling slightly to show Yellow if there was an MA issued to a Block Marker while the section to the next conventional signalling was still occupied. There was a concern about drivers being conditioned to routinely pass signals at Red I think?
Presumably as this project is going to full signals-away the interlocking changes required to achieve this have been judged to be not worth it, hence the limit to conventional blocks even when overlay is introduced?

Overlay will still help though, as things like MAs being extended before the next signal is in sight would still apply.
Will the Overlay allow approach controls to be released when an ETCS MA is issued to allow the braking curve to take precedence, as I believe happens on the GWML? This would be quite handy for trains turning onto the slows at Woolmer Green, Digswell and Welwyn to clear the fast lines that little bit quicker.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,588
Location
Torbay
apparently not, because it needs signals away fortrains to be driven to the block markers.
Ok thanks.
Interesting, IIRC you (or possibly some other similarly knowledgeable person) mentioned that Thameslink changed the conventional signalling slightly to show Yellow if there was an MA issued to a Block Marker while the section to the next conventional signalling was still occupied. There was a concern about drivers being conditioned to routinely pass signals at Red I think?
Presumably as this project is going to full signals-away the interlocking changes required to achieve this have been judged to be not worth it, hence the limit to conventional blocks even when overlay is introduced?

Overlay will still help though, as things like MAs being extended before the next signal is in sight would still apply.
Earlier notification of better aspect step-up in old money.
Will the Overlay allow approach controls to be released when an ETCS MA is issued to allow the braking curve to take precedence, as I believe happens on the GWML? This would be quite handy for trains turning onto the slows at Woolmer Green, Digswell and Welwyn to clear the fast lines that little bit quicker.
Handy, but if they're trying to limit the scope of interlocking data alterations until the main changeover, then I'd suggest they may not implement this feature. On GWML, the signals will remain for the foreseeable future, so incorporating the functionality in the overlay data build is a permanent benefit.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,898
Presumably as this project is going to full signals-away the interlocking changes required to achieve this have been judged to be not worth it, hence the limit to conventional blocks even when overlay is introduced?

I assume so. Signals away isnt to far away in any event.

Will the Overlay allow approach controls to be released when an ETCS MA is issued to allow the braking curve to take precedence, as I believe happens on the GWML?

I don’t know, but in my experience the flashing yellows off the 2 track today mean that there will be little difference in practice.
 