Iron_Duke
Member
Yes it is - it came down the Camp Hill from New Street.Is that Kings Norton but not actually the Camp Hill line?
Yes it is - it came down the Camp Hill from New Street.Is that Kings Norton but not actually the Camp Hill line?
The Chiltern ones (007 - 012) don't get used on ordinary WMR services, but last time I passed 007 and 012 were on Tysley depot (along with plenty more 196s, 170s, 172s, and a Pacer for some reason) so it won't have been too much work.Is it doing the testing because those trains have no other work, or are they used on ordinary WM train services despite their Chiltern branding?
Yes I think you're right. My normal services haven't seen a 196 so far this year, when I've been travelling on it with 172 substituted. The normal platitudes about 'more trains needing maintenance than normal' has stopped.Its quite surprising that WM Trains have ben allowed to use another operators units tbh. Also it does suggest that class 196 availability is somewhat sketchy
The right-hand platform could do with a real tidy-up!196009 (in Chiltern livery) looks like it's out testing the route and station stops today.
== Doublepost prevention - post automatically merged: ==
View attachment 197531
196010 was used to Hereford a few weeks ago.The Chiltern ones (007 - 012) don't get used on ordinary WMR services, but last time I passed 007 and 012 were on Tysley depot (along with plenty more 196s, 170s, 172s, and a Pacer for some reason) so it won't have been too much work.
Maybe this is a good sign for the future of collaboration.
Scheduled for rebuilding as part of the Midlands Hub work.The right-hand platform could do with a real tidy-up!
Interesting. I believe the Chiltern 196 subfleet are being converted back to DOO operation, so I guess they can't be worked by WMR conductors.196010 was used to Hereford a few weeks ago.
Converted back is a bit dramatic. I immagine it's a laptop / remote or login on the unit to the TMS to tell it to display the camera feeds.Interesting. I believe the Chiltern 196 subfleet are being converted back to DOO operation, so I guess they can't be worked by WMR conductors.
Wonder if 196010 has not yet been modified.
I would guess 26th of March, given the order (26, 03) and the fact that the file name contains the word 'Mar', potentially being a shortened form of March.Does the 2603 in the filename indicate that is when services will start? Multiple choice with two options: 26(day) 03(month) which is a Thursday or 26(year) 03(month) so just an unspecified day in March.
Full file ref: WMR 10 Web Mar 2603 V2
2603 could be a reference to many things, not just a date. It could be a job number for instance (i.e. ticket 2603 on the Publications team's work tracker). It would be a bit odd to have 'Mar 2603' as a date format.
Image shows a screenshot of the National Rail website for Pineapple road with a opening date of the 19th March shown
RTT only has short-term amendments in as far as Sunday 8th March so far on the Camp Hill Line. Knocking out the Q is a relatively simple job for the timetable team to bid when the start date is known though.I also searched for a start date. It would have been simple for a note to be shown saying something to the effect "Start Date to be announced" or "Please look out for announcements of start date"
The ghost timetable, including training runs, has been on Realtimetrains for some time with a "Q", runs as required. I use MOV for Moseley Village when I search RTT.
The Full Business Case is available on request from the WMCA, but they have published a summary in their board minutes that approved WMCA's funding for the stations, in January 2021, link: https://governance.wmca.org.uk/documents/s5125/Report.pdf with the following key elements:With opening now imminent, are there any published forecasts for passenger numbers and station entrance/exit statistics for the Camp Hill line?
Value for Money – BCR The original modelling produced a Benefit Cost Ratio of 2.4, representing high value for money; Since then there have been changes around the timetable assumptions and the impact of Covid-19 on passenger demand; We are currently modelling a range of scenarios for the scheme based on latest input data. The strategic case for the scheme remains strong
The new stations will open in November 2023.
Fiscal Impact – the scheme will generate an estimated 440k journeys per annum from Moseley, 314k from Kings Heath and 358k from Hazelwell per annum with net additional rail demand of 1 million journeys per annum.
Environmental impact – during operation it is estimated that 27% of new rail users will transfer from car use for their journeys,
And a neat graphic of how these stations mostly fill in the gap in rail catchment:Service patronage will be in the order of 1.1m to 1.5m by 2027. The time saving and value of savings to public transport times will be 241,000 hours per annum and £2.3m per annum.
Notable caveat that those passenger numbers would presumably have needed to be reviewed once the impact of Covid was better known.
Kings Norton already has rail services, why would those fares change?Its £5.80 for a peak day return from Kings Norton, £4.10 off peak and a day saver is £5.20 according to the West Mids bus website. So clearly the journeys are going to have to be subsidised to get them cheap enough for people to swap from the bus. Guessing that they will be in zone 2 and 3 for West Mids season ticket purposes.
I'm using it as a comparison to what the Camp Hill prices would need to end up as.King's Norton already has rail services, why would those fares change?
The train takes 15 minutes, all day every day. The bus is timetabled to take between 20 and 35 (and can turn out to be longer) depending on the time of day. Think that's worth 60 pence of anyone's money...Its £5.80 for a peak day return from Kings Norton, £4.10 off peak and a day saver is £5.20 according to the West Mids bus website. So clearly the journeys are going to have to be subsidised to get them cheap enough for people to swap from the bus. Guessing that they will be in zone 2 and 3 for West Mids season ticket purposes.
Presumably the intermediates on the University line serve as good comparisons (though of course their service is more attractive as double the frequency)I'm using it as a comparison to what the Camp Hill prices would need to end up as.
All 3 stations are in fare zone 3, so the same as Kings Norton and Bournville.Presumably the intermediates on the University line serve as good comparisons (though of course their service is more attractive as double the frequency)
This was a nice graphic. Would there be any scope for adding a station in the gap between Moseley and Bordesley? Especially given the latter hardly has any trains and is going to be demolished anyway.The Full Business Case is available on request from the WMCA, but they have published a summary in their board minutes that approved WMCA's funding for the stations, in January 2021, link: https://governance.wmca.org.uk/documents/s5125/Report.pdf with the following key elements:
And a neat graphic of how these stations mostly fill in the gap in rail catchment:
You will note that the Camp Hill Station is not being reopened which was not far from Bordesley. The reasoning behind this if I remember correctly is that reopening Camp Hill would not be commercially viable in terms of journey times as it is too close to the city centre and buses would be faster. Historically this line was the Birmingham and Gloucester line which came under the orbit of the Midland Railway in the early days and the original intention was for trains to run into Curzon Street so the line bypassed to the south of the city centre to enter Curzon Street from the east.This was a nice graphic. Would there be any scope for adding a station in the gap between Moseley and Bordesley? Especially given the latter hardly has any trains and is going to be demolished anyway.