Camp Hill line - progress updates

Status
Not open for further replies.

Northerngirl

Member
Joined
16 Aug 2023
Messages
481
Location
Wirral
By some miracle I am there on the 19th thanks to the rale sale, stupidly only got a plusbus thinking the tram was the only thing that might be open by then, im assuming the line is covered in all the existing west mids train day tickets
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Liam L

Established Member
Joined
19 Jun 2020
Messages
1,414
Location
Birmingham
I think should probably wait official confirmation from WMR / WMCA for a opening day. That notice on national rail might be a error?

A Thursday opening does seem strange to me. Id of thought it be a Sunday personally with a official launch with MPs etc and press on the Monday?
 

Baxenden Bank

Established Member
Joined
23 Oct 2013
Messages
4,743
I think should probably wait official confirmation from WMR / WMCA for a opening day. That notice on national rail might be a error?

A Thursday opening does seem strange to me. Id of thought it be a Sunday personally with a official launch with MPs etc and press on the Monday?
National Rail: The official source for trains in Great Britain. That's what they say in their web address!

Only Pineapple Road has the 19th March date. Kings Heath and Moseley Village just say during 2026.
 
Last edited:

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
I think should probably wait official confirmation from WMR / WMCA for a opening day. That notice on national rail might be a error?
If it is an error, it'd be from information supplied by either WMR or NR. (Well pedantically itd be information supplied by rhe project team, who will be in conversation with NR, WMR, WMCA, and several other stakeholders)
 

SCDR_WMR

Established Member
Joined
17 Dec 2017
Messages
2,610
Location
Crewe
I think there was something internally suggesting both Darlaston/Willenhall and Camp Hill stations were in final commissioning and testing with a view to launch 'in a few weeks' time'.

This would suggest end of March is possible. Staff have been training on Camp Hill.
Willenhall/Darlaston seems to be just a paper brief at this point so may be waiting of union sign off.
 

DavidGrain

Established Member
Joined
29 Dec 2017
Messages
1,488
Willenhall and Darlaston are new stations on an existing passenger line. I am just interested to know how much training is needed for these stations. I can think only stopping distances and stopping positions. The Camp Hill line, as I recall it, saw only two WMR trains on Saturday mornings.
 

SCDR_WMR

Established Member
Joined
17 Dec 2017
Messages
2,610
Location
Crewe
Willenhall and Darlaston are new stations on an existing passenger line. I am just interested to know how much training is needed for these stations. I can think only stopping distances and stopping positions. The Camp Hill line, as I recall it, saw only two WMR trains on Saturday mornings.
Stopping positions and stopping distances should be physically learnt, not guessed after reading a sheet of paper.

Even as a guard, I wouldn't be totally happy stopping there having not physically checked out the platform, it's platform furniture and visibility.

Not a huge difference in training, drivers will also need to know line speeds, signals etc. There have been training runs across the camp hill for a while for route learning.
 

Liam L

Established Member
Joined
19 Jun 2020
Messages
1,414
Location
Birmingham
7th of April for the camp hill stations:
Revealed... the opening dates for FIVE new stations in the West Midlands

Darlaston and Willenhall: Thursday 19 March
Camp Hill Line - Kings Heath, Moseley Village and Pineapple Road: Monday 7 April

We're so excited to show you what we've been working so hard to build and to bring easier journeys for everyone.

Who’s ready to be the first through the doors?
 
Last edited by a moderator:

Gagravarr

Member
Joined
3 Mar 2016
Messages
88
The date is announced, Tuesday 7th April!

Camp Hill Line, Birmingham: On Tuesday, April 7 the brand-new stations of Moseley Village, Kings Heath, and Pineapple Road open – giving locals easy access to rail services for the first time since the Second World War.

 

45Fox

Member
Joined
17 May 2022
Messages
140
Location
Leicester
Opening date announced as Tuesday 7 April
(they have put Monday 7 April on Facebook, doh!)

The date is announced, Tuesday 7th April!




First day after the Easter weekend then. It's good that a date has now been committed to.
 

kevin_roche

Member
Joined
26 Feb 2019
Messages
997
It about time. I lost count of the number of times I sat in traffic jams on the number 50 bus from Kings Heath to the city centre, wishing I could have caught a train to school. I am now 72!

I used to live about halfway between Cartland Road and the number 50 bus stop, so a walk to Pineapple Road would have been great.
 

Liam L

Established Member
Joined
19 Jun 2020
Messages
1,414
Location
Birmingham
It about time. I lost count of the number of times I sat in traffic jams on the number 50 bus from Kings Heath to the city centre, wishing I could have caught a train to school. I am now 72!

I used to live about halfway between Cartland Road and the number 50 bus stop, so a walk to Pineapple Road would have been great.
I still think kings heath will be a bottleneck because bad parking etc but it gives a nice alternative than sitting on the bus through there for ages.
 