Where is this 'newly electrified line' ?
All what seems to be proposed is a through station and the line up to it being electrified!
Apologies, the Leeds to Bradford bit would be electrified.
Where is this 'newly electrified line' ?
All what seems to be proposed is a through station and the line up to it being electrified!
There was a schematic map on the TV news, showing exactly this - a direct route from Bradford to Huddersfield (albeit this is apparently under 'ideas being explored')Reasonable best case journey times for Manchester - Leeds and Manchester - Bradford will be extremely similar. Essentially, Huddersfield - Leeds via TRU and Huddersfield - Bradford via some sort of Pickle Bridge route are about the same.
Also hourly direct to Hull, York and Preston/Blackpool'on the mainline' ? it's got direct London services (three routes), it's linked to Leeds and Manchester directly, along with direct to Airedale/Wharfdale and Huddersfield, and even Pontefract.. What mainline would you like it to be on?
I'd previously been unsupportive of the Wortley Curve reopening (I'm sure it was heartbrokenAs previously mentioned, I think it would be a good idea to run the WY tram scheme alongside the existing Leeds / Bradford railway where it used to be four tracked. This could possibly facilitate transferring, Bramley and possibly New Pudsey over to light rail operation with many new stops added. The existing railway would then be free for a regular electrified 'non-stop' heavy rail service to run between the two cities, possibly reduce the journey time to just over ten minutes. I'd scrap the St. James thru' station idea. As for the Interchange, I would support the fifth platform idea (which incidentally could give the city another Platform '0'). Another idea would be to reopen the Wortley Curve and transfer some LNER services back to the Interchange giving a faster service to the capital. I was recently in LDS and only counted only 21 people on the LNER train as it left Leeds towards BDQ, and that's not even factoring in how many may have got off at Shipley. Surely more people would use a direct & well timed Intercity service to BDI today, than in the in 80's.
In usual times there's a Northern 150 shuttles Bradford to Huddersfield. Similarly there's a Northern 150 shuttles between Bradford and Sheffield. Perhaps if they'd cross-linked these they could have saved some money providing a new bay at Huddersfield.6. Access to nearby places like Sheffield is very limited. Could this be easily rectified?
Poor idea. What happens if there’s engineering work at Brighouse. Where do you spin the Sheffield service if Huddersfield has no capacity. A reminder that with NPR, Huddersfield will gain another bay platform due to passive provision.In usual times there's a Northern 150 shuttles Bradford to Huddersfield. Similarly there's a Northern 150 shuttles between Bradford and Sheffield. Perhaps if they'd cross-linked these they could have saved some money providing a new bay at Huddersfield.
There aren’t any direct trains from Bradford to Sheffield.In usual times there's a Northern 150 shuttles Bradford to Huddersfield. Similarly there's a Northern 150 shuttles between Bradford and Sheffield.
There’s not that much in it now. The Fastest train does Bradford to Manchester in 53 minutes, compared to about 47 minutes from Leeds to Manchester.IIRC Tracy Brabin also stated in an interview, that they want a commute to Manchester to be as quick from Bradford as it is from Leeds.
I don’t see why a train from London to Interchange would have any more people on it as through passengers than a train from London to Forster Square.Surely more people would use a direct & well timed Intercity service to BDI today
I think that's a typo for Huddersfield to Sheffield, given the context and f the rest are f the post.There aren’t any direct trains from Bradford to Sheffield.
I'd previously been unsupportive of the Wortley Curve reopening (I'm sure it was heartbroken) but I'm warming to the idea. My objection was that because Leeds is such a big market it makes more sense to reverse Bradford trains there if you're getting that close- that way you're adding Leeds to Bradford capacity and not depriving Leeds of a regular pattern service by using the path for a Bradford train instead. However running the service from Kings Cross as a 2x5 Azuma that splits at Wakefield could work- that's assuming the signalling there permits splitting and joining of course.
Certainly makes more sense than the Gateway station idea anyway!
The key problem with (1) is that passengers heading the other way across the Pennines don't want 2 of their 4 fast trains per hour to dump them in Bradford where they'll have to change to reach Leeds or York.
As for (2) you'd need to spend a fair bit optimising Leeds station to accommodate this metro service, ideally with some grade separation and even dedicated platforms in a "low level" Metro station... which would have to be quite deep thanks to the River Aire. If you're spending all that money you wouldn't then have Thorpe Park as your eastern terminus, when running through to York makes far more sense. Unfortunately you then run up against the issues of boundaries.
TetcytykeThere aren’t any direct trains from Bradford to Sheffield.
You may be thinking of the Halifax to Hull train. But that is the fourth train per hour from Bradford Interchange to Leeds and they’re probably isn’t room for a fifth.
There is a reason why the ‘grand tour’, which used to run Selby-Leeds-Bradford-Huddersfield-Wakefield, was broken up.
ETA: you may also be thinking of Huddersfield to Sheffield via Penistone. That might work, although the long single track sections would require quite a lot of timetable re-jigging, but it is a slow train from Huddersfield to Sheffield and so it would have very limited utility from Bradford.
The vast majority of cross-Pennine passengers to Leeds and York don't come anywhere near Bradford. They go via Huddersfield. The Calder Valley / Copy Pit market to Leeds and York is small.
It's silly having two main lines both operating as mixed railways. Concentrate all the non-stop services into a new (substantially) tunnelled route and release the existing Dewsbury and Pudsey routes to serve as all-stations metros. You run the Copy Pit and Halifax expresses in the new tunnel alongside the Manchester - Leeds NPR services. Then there are no through flows that need to be routed via Bradford.
It'll take some investment, but it doesn't need to be that complicated. What's needed is service simplification. Stop all those nonsense LNER extensions beyond Leeds. Have all Harrogate, Airedale, Wharfedale and Bradford Interchange services terminate in the low numbered terminating platforms with segregated flows as much as possible. Expand western approaches and build two more platforms on the existing car park - should be relatively cheap as no demolitions of expensive properties. Organise the western approaches into the following independent systems:
- Harrogate, Airedale and Wharfedale share a two-track approach and 4 terminating platforms for 16-24 tph
- Bradford interchange come in as a self-contained two-track railway into 2 terminating platforms for 12tph
- West Riding line come in as a self-contained two-track railway into 3 terminating platforms
- Huddersfield and Hunslet come in as a two-track railway (long-term potentially four) going into the existing through platforms with most services running through towards York and Hull (Hunslet services probably terminate in platforms 13 and 17).
It's one thing splitting a 10-car service to serve Leeds and Bradford, as that still gives a 5-car service into Leeds which is the far bigger destination- with there also being another service each hour to Leeds anyway.Perhaps also with Northern running four-car trains Wakefield to Sheffield with one starting at Bradford and the other Leeds giving Bradford a much-needed link to Sheffield.
Both routes have a mixture of short and longer-distance flows, so you can't entirely separate them out without either closing the local stations (good luck with that!) or building a new route (where's that magic money tree?).The vast majority of cross-Pennine passengers to Leeds and York don't come anywhere near Bradford. They go via Huddersfield. The Calder Valley / Copy Pit market to Leeds and York is small.
It's silly having two main lines both operating as mixed railways. Concentrate all the non-stop services into a new (substantially) tunnelled route and release the existing Dewsbury and Pudsey routes to serve as all-stations metros. You run the Copy Pit and Halifax expresses in the new tunnel alongside the Manchester - Leeds NPR services. Then there are no through flows that need to be routed via Bradford.
It'll take some investment, but it doesn't need to be that complicated. What's needed is service simplification. Stop all those nonsense LNER extensions beyond Leeds. Have all Harrogate, Airedale, Wharfedale and Bradford Interchange services terminate in the low numbered terminating platforms with segregated flows as much as possible. Expand western approaches and build two more platforms on the existing car park - should be relatively cheap as no demolitions of expensive properties. Organise the western approaches into the following independent systems:
- Harrogate, Airedale and Wharfedale share a two-track approach and 4 terminating platforms for 16-24 tph
- Bradford interchange come in as a self-contained two-track railway into 2 terminating platforms for 12tph
- West Riding line come in as a self-contained two-track railway into 3 terminating platforms
- Huddersfield and Hunslet come in as a two-track railway (long-term potentially four) going into the existing through platforms with most services running through towards York and Hull (Hunslet services probably terminate in platforms 13 and 17).

The vast majority of cross-Pennine passengers to Leeds and York don't come anywhere near Bradford. They go via Huddersfield. The Calder Valley / Copy Pit market to Leeds and York is small.
It's silly having two main lines both operating as mixed railways. Concentrate all the non-stop services into a new (substantially) tunnelled route and release the existing Dewsbury and Pudsey routes to serve as all-stations metros. You run the Copy Pit and Halifax expresses in the new tunnel alongside the Manchester - Leeds NPR services. Then there are no through flows that need to be routed via Bradford.
I think I'd go one step further. If the new line stops at Huddersfield (which I feel it should if you want to get close to filling it) then the line west of Marsden is probably surplus to requirements - indeed the section between Marsden and Huddersfield becomes a sleepy backwater.
The railway could rid itself of the whole lot all the way back to Guide Bridge or even further in on the other route, and release any bits that TfGM want for conversion to Metrolink. Metrolink up to Diggle or whatnot. Marsden traffic to Manchester would in most cases be quicker with a double back via Huddersfield
The line via Halifax and Bradford can be dedicated solely for intermediate traffic and residual freight, which would give Bradford way more capacity to play with.
What wasn't said (directly) is that the best Leeds-Manchester time will be improved by TPU, I recall 40 mins was quoted (annoyingly I can't find the clip now!)There’s not that much in it now. The Fastest train does Bradford to Manchester in 53 minutes, compared to about 47 minutes from Leeds to Manchester.
That'll go down like a lead balloon with the hundreds - if not thousands - of people who commute to Leeds from the Calder Valley every day.Calder Valley services terminating at Bradford's new station. Thus
That'll go down like a lead balloon with the hundreds - if not thousands - of people who commute to Leeds from the Calder Valley every day.
....if the new team network is ever built!Yeah, I don’t think terminating anymore trains at Bradford anymore is the answer.
Interestingly, I bumped into Alex Ross Shaw earlier, and he said they were considering four to six platforms for the new Bradford station, with adjacent room for tram access similar to Manchester Victoria.
I know there are a lot of comments regarding the location of the new station but if linked by the new tram network then maybe it could work.
The train side of the interchange isn't shutting. Only the bus station is as far as we know.Increasing the distance and hence minimum connection time between the two Bradford stations will make cross Bradford connections even less attractive and funnel even more passengers through Leeds.
Yes, there is that uncertainty that needs a guarantee.....if the new team network is ever built!![]()
The proposed tram route goes between Foster Square and Leeds, with a direct connection at Foster Square. Passengers wishing to go south (e.g. Huddersfield) use the tram between Foster Sq and St James.Increasing the distance and hence minimum connection time between the two Bradford stations will make cross Bradford connections even less attractive and funnel even more passengers through Leeds.
They can change at St James; terminating Calder Valley trains here will relieve bays at Leeds. And since the turn-back & tight curve at Interchange are eliminated, it's not likely to be significantly slower.That'll go down like a lead balloon with the hundreds - if not thousands - of people who commute to Leeds from the Calder Valley every day.
It would be the most Bradford thing to build the new station with no tram link to the Interchange and town centre.
This is still a very silly idea with lots of downsides and very few tenuous upsides. We've gone from "it'll cut Calder Valley journey times" to "Calder Valley to Leeds passengers will have to change, but it'll be okay because at least there's no slow approach to Interchange".The proposed tram route goes between Foster Square and Leeds, with a direct connection at Foster Square. Passengers wishing to go south (e.g. Huddersfield) use the tram between Foster Sq and St James.
They can change at St James; terminating Calder Valley trains here will relieve bays at Leeds. And since the turn-back & tight curve at Interchange are eliminated, it's not likely to be significantly slower.
For many passengers, the Tram route(s) will go closer to their final destination than Leeds station, so a change (to tram) at St James is not necessarily an inconvenience.
Which is perhaps the whole point of choosing this order of work. It will become much harder to cancel the tram, once St James station is built, because a multitude of through connections will depend on the tram being there.
That's what I thought, but other posters have corrected me.The train side of the interchange isn't shutting. Only the bus station is as far as we know.