Xenophon PCDGS
Veteran Member
I notice that you made no reply to the comment that I made about the poor siting of Denton railway station.
I agree that it's not a brilliant site for a station. As the station will be completely rebuilt in any scheme it doesn't have to be sited at its current location. A stop at Dane Bank might make sense for example or it may be possible to redevelop some of the industrial premises into houses, car park, and a bus facility.I notice that you made no reply to the comment that I made about the poor siting of Denton railway station.
It was not so very long ago that Middleton, a town with a larger population than Denton, featured in many of Mayor Andy Burnham's statements of Metrolink line expansion and in those days, no mention was ever made of Denton.
Why is there a need for Ashton-under- Lyne to have two different tram routes?
The existing route is from Eccles-Manchester- Ashton-under-Lyne, so are you proposing an Eccles-Manchester-Ashton-under-Lyne-Denton- Stockport tram route from what I understand you say above?Or to put it into a completely different perspective, who says it's a different tram route, and not simply an extension of the existing one?
Yes both proposals have been around for years, as you correctly say. I worked on a study in 2018 (I think) that looked at tram options around Stockport which included the Denton line.Manchester Evening News article from 2024. Scroll through it and you'll see a draft network map showing an option of a tram line to Middleton as an option of tram-train through Reddish and Denton. It's not brand new. It's been part of the thinking for a while.
I assume TfGM have some idea of how they'll sequence new tram lines but it's unlikely to be developed before 2035 because Stockport to Didsbury will be developed first and it will likely require tram trains which won't be available until after the initial Heywood to Oldham pathfinder project.Has anyone been given any idea of the year(s) when both Middleton and Denton will be in receipt of full operational tram services.
I feel like I've answered this repeatedly but I'll summarise:Why is there a need for Ashton-under- Lyne to have two different tram routes?
The current route is that. Will it remain thus forever? There is nothing to stop a big recast and reorg of routes.The existing route is from Eccles-Manchester- Ashton-under-Lyne, so are you proposing an Eccles-Manchester-Ashton-under-Lyne-Denton- Stockport tram route from what I understand you say above?
Surely TfGM will not wish to alter the part of the existing Metrolink route that serves the areas of Ashton-under-Lyne-Audenshaw-Droylsden-Clayton-Northern Quarter-Manchester.The current route is that. Will it remain thus forever? There is nothing to stop a big recast and reorg of routes.
In 2035, if I am still on this website, I will have celebrated my 90th birthday.I assume TfGM have some idea of how they'll sequence new tram lines but it's unlikely to be developed before 2035 because Stockport to Didsbury will be developed first.

In the very first posting of this thread, the Roger Farnworth commentary clearly states that under The Outline Strategy (4), the matter of the onward extension to Denton is not part of the core proposals.The obvious plan to me would be to build a Stockport-(street running)- Heaton Norris junction-Audenshaw tram line, where it would join the existing Ashton line. The line from Stockport could then be extended from Ashton to Oldham. This would contain a lot of the easier parts of an orbital metrolink line. At the same time, the Ashton line from the city center could be extended to Stalybridge.
In 2035, if I am still on this website, I will have celebrated my 90th birthday.
Is the mention of 2035 a "cunning plan" to ensure that this thread runs for many years to come...![]()
One interesting aspect of a completed East Didsbury to Stockport line extension is that it will give a fast connection between Chorlton and Stockport town centres.
That being the same Manchester Evening News who, at the time of the Strangeways prison riot, carried a totally fallacious front page banner headline.....""20 Dead"....Manchester Evening News article from 2024. Scroll through it and you'll see a draft network map showing an option of a tram line to Middleton as an option of tram-train through Reddish and Denton.
Orbital passenger flows in Greater Manchester are unlikely to generate traffic demand exceeding a double-deck bus service running 5 tph, so the case for building Metrolink lines on such routes is dubious. There are still heavy rail routes into central Manchester ripe for Metrolink conversion, in particular those via Reddish to Marple Rose Hill (part of the original plan in the mid 1980s) and the Atherton line.Yes it would be the first Metrolink extension based primarily on orbital passenger flows. The Airport line had a significant emphasis on serving the airport but providing a link to the city centre for intermediate stops was also crucial. I can't see the extension from East Disbury justifying more than 5tph of single units though. It has a marginal business case without the external funding of Eccles and Trafford Park (both served by single trams 5tph). The Eccles line had a huge contribution from the EU (it was built 5 years before the eastern expansion of the EU in 2004). The Trafford Park line was nearly half paid for by private sector.
I have often travelled from Heald Green to Preston on the Northern service to Blackpool, which geographically meets the "South to North West" requirement stated above.The real enabler of much Manchester transport change would be an "Manchester Crossrail" joining south to North West rail lines which would enable a "recast" of the train services.
I am aware of Burnham's plans for fare reform in GM. They are welcome and will improve the utility of multi-modal travel as an option all over GM.Are you also having in mind that there may be a master-plan yet to be launched where train and bus fares would be equalised and the train service frequency would be increased to the same as the bus services.
The direct 330 bus service is well used by passengers in Woodley, Hyde (a town with a modern bus station) and Dukinfield, with no need to change. How would current 330 bus passengers in those areas benefit from your aspirational train service?
You use the word "orbital", but surely that is exactly what the M60 does, with its links to the M56, M62 and M67.
I agree that is possible for residents of some of the Stockport suburban area (e.g. Heaviley/Edgeley/Adswood) who want to travel towards Didsbury/Old Trafford/Chorlton etc., but TfGM/Stockport Met have a long-term aspiration for a tram through to Offerton, I think mostly for regeneration purposes and they have the right to pursue such a course of action.Having built the new bus station with provision for a terminal Metrolink section, surely having reached that point, there are many bus stances there from which onward travel can be reached. Rochdale Interchange is a very good example of that.
Rochdale Interchange not only has local area bus services, but services that serve Manchester via Middleton, Bolton via Bury, Ashton-under-Lyne via Oldham plus two routes into West Yorkshire, one via Littleborough, Todmorden and Hebden Bridge, the other through Ripponden and Sowerby Bridge.The Rochdale model you give as an example mostly provides connecting buses to low density suburbs within a few miles of Rochdale.
The 464 to Bacup/Whitworth/Waterfoot/Rawtenstall (and on to Accrington, but that already has a faster direct rail connection to Rochdale) is the exception, but Rossendale is another good example of a largish conurbation with poor transport links hindering regeneration, and a planned link from Rawtenstall into GM that would also serve Bacup/Whitworth/Waterfoot with a reasonably short shuttle time is being actively developed by Rossendale Borough Council and their partners.
People are unlikely to be feeding into the tram network from most of those locations though, it makes any onward journey significantly slower if you're already over a few miles away from Rochdale from most destinations that you mention - Rochdale already has direct services to Manchester/Littleborough/Todmorden/Hebden Bridge/Sowerby Bridge along the Calder Valley Line, and most people from Middleton would be aiming to join the Metrolink network at Bowker Vale.Rochdale Interchange not only has local area bus services, but services that serve Manchester via Middleton, Bolton via Bury, Ashton-under-Lyne via Oldham plus two routes into West Yorkshire, one via Littleborough, Todmorden and Hebden Bridge, the other through Ripponden and Sowerby Bridge.
At this moment in time, allowing for the fact that bus fares in The Land of the Bee are capped at £2.00, which would be the price of a direct Rochdale to Ashton-under-Lyne bus journey on the 409 service, what would the same journey cost using the tram and bus option that you mention above?You wouldn't transfer onto an Ashton bus in Rochdale as it is significantly faster to take the tram into Oldham and change there (the buses to Ashton stop adjacent to Oldham King St tram stop).
Put that option to a non car owing resident in either Ripponden or Rishworth who is reliant upon public transport and what would be the alternative railhead to those two settlements and what would be the service frequency of the bus route they would need to take to the said railhead from their towns.Even Ripponden will be feeding into its nearest railhead, instead of using Rochdale as a railhead.
Currently it would cost you £4.40, but that is due to change soon with multimodal journeys being integrated into the Bee Network fare system.At this moment in time, allowing for the fact that bus fares in The Land of the Bee are capped at £2.00, which would be the price of a direct Rochdale to Ashton-under-Lyne bus journey on the 409 service, what would the same journey cost using the tram and bus option that you mention above?
For Ripponden, the same bus route that leads to Rochdale passes Littleborough railway station approximately 15 mins earlier, where interchange can be made onto direct railway services to Manchester, Burnley, Accrington, Blackburn and many other destinations.Put that option to a non car owing resident in either Ripponden or Rishworth who is reliant upon public transport and what would be the alternative railhead to those two settlements and what would be the service frequency of the bus route they would need to take to the said railhead from their towns.
Thanks for that information. How soon will these multimodal journey fare prices be introduced by the Bee Network and will journey makers from outside the Bee Network boundary into the central core benefit accordingly?Currently it would cost you £4.40, but that is due to change soon with multimodal journeys being integrated into the Bee Network fare system.
1). According to this article (https://news.tfgm.com/press-release...o-bring-trains-into-the-bee-network-from-2026), December 2026.Thanks for that information. How soon will these multimodal journey fare prices be introduced by the Bee Network and will journey makers from outside the Bee Network boundary into the central core benefit accordingly?
I understand from an old friend in the Leyland area that Lancashire County Council is now governed by a different party since the last Local County Council/ Authority elections and do wonder if their views on transportation matters are somewhat different to that of the previous party in power.Lancashire is going through the process of reforming local government, where a new local government structure including an overarching combined authority with mayor I believe, so a negotiated deal might become much easier.
With the other surrounding authorities, I'm not sure if anything is planned yet.
Without going too far off topic, Lancashire County Council is due to be abolished soon.I understand from an old friend in the Leyland area that Lancashire County Council is now governed by a different party since the last Local County Council/ Authority elections and do wonder if their views on transportation matters are somewhat different to that of the previous party in power.
We were discussing buses and trams (not trains) on journeys between Ashton and Rochdale and it would appear that a split bus and tram single journey as suggested would cost £2.40 more than a direct 409 bus service on each journey travelled, which is something to bear in mind and many people would set off earlier to make such a saving with the benefit of not having to change and not knowing how long to wait for the tram arrival until the tram stop is reached.According to this article (https://news.tfgm.com/press-release...o-bring-trains-into-the-bee-network-from-2026), December 2026.
Only until the integrated prices kick in, and then a bus + tram journey may well be the same price as a direct bus journey.We were discussing buses and trams (not trains) on journeys between Ashton and Rochdale and it would appear that a split bus and tram single journey as suggested would cost £2.40 more than a direct 409 bus service on each journey travelled, which is something to bear in mind and many people would set off earlier to make such a saving with the benefit of not having to change and not knowing how long to wait for the tram arrival until the tram stop is reached.
In relation to such a stated scenario, surely such a fare structure would have seriously detrimental implications for the annual revenue generated by the tram services, growing steadily worse when moving from tram zones 2, 3 and 4 in particular or will such a new style fare system see the end of the zoning system of the MetrolinkOnly until the integrated prices kick in, and then a bus + tram journey may well be the same price as a direct bus journey.
I think the zoning system will change with Metrolink, and any financial losses will probably be offset by increased patronage as more people view the bus+tram/train connections as a viable option, instead of defaulting to car-based travel.In relation to such a stated scenario, surely such a fare structure would have seriously detrimental implications for the annual revenue generated by the tram services, growing steadily worse when moving from tram zones 2, 3 and 4 in particular or will such a new style fare system see the end of the zoning system of the Metrolink