North London improvement ideas?

Status
Not open for further replies.

MarkyT

Established Member
Joined
20 May 2012
Messages
7,568
Location
Torbay
Reversing trains at FPK would be a challenge (though you could use Ferme Pk). If there is an off-peak demand for that section it would make more sense to go as far as Bowes Park (at least!).
Yes, that would work. Over the flyover back to the up side after reversing. Bowes Park turnback siding is fairly busy with depot movements through the day. Gordon Hill has to be the favourite, at the edge of the built-up area.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,262
Not sure there is much of a capacity need south of Finsbury Park (to be more precise south of Highbury) in isolation - any capacity need is really from the suburban 'home' locations. There will be 12tph if Hertford Loop and Welwyn need 12tph worth of capacity. In the off-peak, provided the long-standing 8tph aspiration gets delivered then that'll be good enough for south of Ally Pally.
But it definitely feels like a wasted asset. A "tube line" running through inner London, but with the frequency of an outer London branch line. How many people pile on to the the crowded Piccadilly and Victoria lines at Finsbury Park or Highbury & Islington who could use the Northern City instead, especially as it now connects to the Elizabeth Line at Moorgate?

Essex Road is creepily quiet, when it actually is very convenient for much of Islington.
 

PGAT

Established Member
Joined
13 Apr 2022
Messages
2,128
Location
Selhurst
But it definitely feels like a wasted asset. A "tube line" running through inner London, but with the frequency of an outer London branch line. How many people pile on to the the crowded Piccadilly and Victoria lines at Finsbury Park or Highbury & Islington who could use the Northern City instead, especially as it now connects to the Elizabeth Line at Moorgate?

Essex Road is creepily quiet, when it actually is very convenient for much of Islington.
At 4tph today yes it does feel like a waste but 12tph sounds perfectly reasonable and there isn’t a need to expand Moorgate to increase the frequency anything beyond that.
 

NCT

Established Member
Joined
18 Apr 2025
Messages
2,264
Location
London
But it definitely feels like a wasted asset. A "tube line" running through inner London, but with the frequency of an outer London branch line. How many people pile on to the the crowded Piccadilly and Victoria lines at Finsbury Park or Highbury & Islington who could use the Northern City instead, especially as it now connects to the Elizabeth Line at Moorgate?

Essex Road is creepily quiet, when it actually is very convenient for much of Islington.

I think an off-peak 8tph will do the job, which will be the same as the Mildmay and Windrush upstairs and H&I.
 

LLivery

Established Member
Joined
13 Jul 2014
Messages
1,716
Location
Southeastern land
Thameslink:
  • Either St Albans or Gordon/Crews Hill to Orpington 2tph all day
  • Send Kentish Town terminators to St Albans. End the random skip stop on the slows
  • A new station 'Colindale East' at Aerodrome Road
  • Im starting to think a second Thameslink Programme collating a load of projects might be worth doing...
LO:
  • Lengthen NLL/WLL platforms & trains to 8 cars.
  • Post HS2, get at least 2tph St Albans Abbey - Watford - Clapham (would like Croydon to remain)
  • West London Orbital (with electrification)
  • Make use of Queen's Park slow platforms post HS2
  • Old Oak WLL platforms
  • Controversially, I'd cut back the Bakerloo to Queen's Park and run 6tph, 8 car on the DC line (which I would convert to AC and integrate with WCML for diversions). Bakerloo Line then gets extended to Old Oak, with a new depot in Park Royal - I just some got new crayons
Other:
  • Get Chiltern to OOC.
  • Consider Neasden platforms for Chiltern if WLO is built
  • Rebuild Stratford (and take the land that was earmarked for the light dome arena thing)
  • After rebuild, and somehow getting freights away, divert Stansted Express & Cambridges via Stratford and speed up Stratford - Tottenham Hale
  • 4 track West Anglia at least as far as Cheshunt, new station at Picketts Lock, maybe another at Turnford/Wormley
  • Rebuild Barking
  • Remodel Finsbury Park
  • Rebuild Highbury & Islington
  • XR 2 - I'd much rather they concentrate on the proposed Eastern branch than Southgate. So from Dalston I'd head to Hackney, Stratford (could be International or linking both, under Westfield), Barking, then connect on Tilbury Loop towards Grays and Barking Riverside. Extend the Barking Riverside route across the river to Thamesmead, Abbey Wood, Bexleyheath. Dare I say, I'd extend further to the land bounded by the M25, A2 and Swanley, building a new suburb there.
  • Resurrect DLR Barking Riverside and Dagenham Dock
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,638
But it definitely feels like a wasted asset. A "tube line" running through inner London, but with the frequency of an outer London branch line. How many people pile on to the the crowded Piccadilly and Victoria lines at Finsbury Park or Highbury & Islington who could use the Northern City instead, especially as it now connects to the Elizabeth Line at Moorgate?

Essex Road is creepily quiet, when it actually is very convenient for much of Islington.
I couldn't agree more.

Moorgate is now a Crossrail station (and merged therefore with Liverpool St) - so it is extremely visible.
Old Street has a ton of employment (as well as leisure/off peak /weekend demand) - compared to 10, 20 years ago. Horrible station though.
And Highbury is much more of a hub and interchange now too...

so it's a very different route to NSE days (still love the rogue signage) with some big places on it. If we have a nice tunneled route into Central London, we should maximize its potential.

10-14tph for core service would be a good service for most tube lines (every 5-6 mins is reasonable) - and it beats some of the outer tube branches.

  • XR 2 - I'd much rather they concentrate on the proposed Eastern branch than Southgate. So from Dalston I'd head to Hackney, Stratford (could be International or linking both, under Westfield), Barking, then connect on Tilbury Loop towards Grays and Barking Riverside. Extend the Barking Riverside route across the river to Thamesmead, Abbey Wood, Bexleyheath. Dare I say, I'd extend further to the land bounded by the M25, A2 and Swanley, building a new suburb there.
I think this would be a very roundabout way to the West End, and would duplicate HS1 a bit too much. Isn't this perfectly placed to point at Tottenham Hale and north - per most discussions. CR2 would comfortably take up the WAML service pattern - possibly including Chingford with the spare tph - which might render some of the Stratford works moot.
  • Rebuild Stratford (and take the land that was earmarked for the light dome arena thing)
  • After rebuild, and somehow getting freights away, divert Stansted Express & Cambridges via Stratford and speed up Stratford - Tottenham Hale
Per above... if no CR2, the western side of Stratford would be great to rebuild re more WAML platforms, or options to link Overground with Chingford or Meridian Water potentially...
 

LLivery

Established Member
Joined
13 Jul 2014
Messages
1,716
Location
Southeastern land
I think this would be a very roundabout way to the West End, and would duplicate HS1 a bit too much. Isn't this perfectly placed to point at Tottenham Hale and north - per most discussions. CR2 would comfortably take up the WAML service pattern - possibly including Chingford with the spare tph - which might render some of the Stratford works moot.

Per above... if no CR2, the western side of Stratford would be great to rebuild re more WAML platforms, or options to link Overground with Chingford or Meridian Water potentially...

I would keep the West Anglia branch, I'm talking about the other 'future phase' proposed branch which appears on maps but with no route shown beyond Hackney. Even if not crossing the river, the Thameside area is due for a hell of a lot of homes. Unless they still want it to go towards Epping, I can't think what else makes sense.
 

A S Leib

Established Member
Joined
9 Sep 2018
Messages
3,329
I think we need more through intercity services using the North London Line
Where to? Ignoring Channel Tunnel services for loading gauge and the lack of passport controls anywhere else, I don't think there are a lot of places east of London you'd particularly run intercity services to from west of it, especially given that cases like Southend already have a frequent, reliable service which should probably stay that way.

Reviving the ideas of four-tracking the Chiltern Main Line to at least West Ruislip and having a single station for Jubilee, Overground, Thameslink (Metropolitan, Chiltern, EMR) services at West Hampstead is something I'd like to see, but would be unfeasibly expensive.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,262
I couldn't agree more.

Moorgate is now a Crossrail station (and merged therefore with Liverpool St) - so it is extremely visible.
Old Street has a ton of employment (as well as leisure/off peak /weekend demand) - compared to 10, 20 years ago. Horrible station though.
And Highbury is much more of a hub and interchange now too...

so it's a very different route to NSE days (still love the rogue signage) with some big places on it. If we have a nice tunneled route into Central London, we should maximize its potential.

10-14tph for core service would be a good service for most tube lines (every 5-6 mins is reasonable) - and it beats some of the outer tube branches.
And was expensively rebuilt when the Victoria Line opened to give cross platform interchange with the Northern City. An easy interchange which is wasted due to the poor GN frequency.
 

DJS76

Member
Joined
15 Aug 2020
Messages
61
Location
London
I would keep the West Anglia branch, I'm talking about the other 'future phase' proposed branch which appears on maps but with no route shown beyond Hackney. Even if not crossing the river, the Thameside area is due for a hell of a lot of homes. Unless they still want it to go towards Epping, I can't think what else makes sense.
Keep the West Anglia branch and have another branch from Hackney to Chingford replacing the current Overground service. A new station underground could replace the existing Clapton station and the 4 paths currently used by Chingford services from Liverpool Street to Copermill Junction could be replaced by another 4 trains for the West Anglia mainline.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,387
Location
The Fens
As a simpler improvement, is there scope for additional shuttle trains between Finsbury Park and Moorgate, to give the Northern City Line a proper metro service?

Not sure there is much of a capacity need south of Finsbury Park (to be more precise south of Highbury) in isolation - any capacity need is really from the suburban 'home' locations. There will be 12tph if Hertford Loop and Welwyn need 12tph worth of capacity. In the off-peak, provided the long-standing 8tph aspiration gets delivered then that'll be good enough for south of Ally Pally.
Two developments have hit the Finsbury Park-Moorgate line, the post Covid drop in commuting and the introduction of Thameslink. It won't get back to pre covid service any time soon.

Yes, that would work. Over the flyover back to the up side after reversing. Bowes Park turnback siding is fairly busy with depot movements through the day. Gordon Hill has to be the favourite, at the edge of the built-up area.
Not any more. Since the New Towns Taskforce report the obvious place on the Hertford Loop for a proper reversing facility will be Crews Hill.
Thameslink:
  • Either St Albans or Gordon/Crews Hill to Orpington 2tph all day
And the trains will need to go into the Thameslink core, not Moorgate.
 

NCT

Established Member
Joined
18 Apr 2025
Messages
2,264
Location
London
Two developments have hit the Finsbury Park-Moorgate line, the post Covid drop in commuting and the introduction of Thameslink. It won't get back to pre covid service any time soon.

Yes. I have noticed (albeit with no scientific sampling whatsoever) that the Moorgates now 'lose' quite a lot of people to Thameslink at Finsbury Park (morning peak southbound) whereas pre 2018 if was mainly hordes from King's Cross terminators trying to pile on.
 

Mr. SW

Member
Joined
13 Sep 2023
Messages
534
Location
Armchair
Controversially, I'd cut back the Bakerloo to Queen's Park and run 6tph, 8 car on the DC line (which I would convert to AC and integrate with WCML for diversions). Bakerloo Line then gets extended to Old Oak, with a new depot in Park Royal - I just some got new crayons
I've had this idea too!
Some time ago I had a severe attack of Crayonic Extendenitis, for which there is no cure, and proposed a similar scheme but with fun add-ons.

Cut back the Bakerloo to Queens Park and re-extend through to to Old Oak as above, but extend beyond, demolishing the west shed--

1: To North Acton and rise up just east of Hanger Lane and take over the Central Line to West Ruislip with a shared depot therein. (Yes, I know about the conductor rails)
2: Io Ealing Broadway, taking over the Central Line with a steep rise to join the original just to the north of West Acton.
3: To Uxbridge along an entirely new route with stops at places like Pitshanger Lane, Castle Bar Park, Hayes End, Brunel University and Uxbridge itself.

1 and 2 are pretty rubbish, actually; but 3 has legs. There would need to be some depot at the outer end but there would be knock-on effects.

> Piccadilly Line service withdrawn beyond Rayners Lane with affected passenger levels
> Passenger levels affected on the Central Line
> Passenger levels affected on the Elizabeth Line, probably a slight cut but that possibly may not be a bad thing.
> No tube stock beyond Queens Park so the platform height issue disappears as well as the interworking issues. A positive!

But more seriously, the Watford DC line may become under-trafficked due to the de facto cut in service, so there has to be compensation. An increased service this would almost certainly create problems in Euston with congestion and conflicting moves.

So, do this >>>

> Turn the reversing siding at Harrow over to the Overground.
> Reinstate Primrose Hill station (Complete rebuild) with some contrived passage or access way to Chalk Farm Station on the Northern Line. (I'm aware there maybe stuff in the way)
> Install some train reversing facility to the east: crossover, pocket track or similar. Or not, if extending the line to Camden Road. You choose.
> Rename the station "Chalk Farm"
> And/or upgrade the junction at Camden Road (requires land acquisition, bridge repairs, rehabilitation of erstwhile platforms 3 and 4 etc., etc., etc.) if continuing beyond Chalk Farm
> Run services Harrow/Willesden Junc to Chalk Farm/Camden Road between the normal Euston to Watford, thus controlling passenger numbers passing through Euston and also not over-trafficking Harrow - Watford.

My pencil case has just exploded.
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,638
And was expensively rebuilt when the Victoria Line opened to give cross platform interchange with the Northern City. An easy interchange which is wasted due to the poor GN frequency.
It’s such a good interchange. I wonder if those routes really feel like they basically live on the Victoria line!

The issue is that Finsbury Park and Kings Cross offer the same links, so people will do a bit of both, plus of course Thameslink now too.
 

Dave W

Member
Joined
27 Sep 2019
Messages
885
Location
North London
Crews Hill - Enfield are of course delighted but I can only see years of legal wrangling ahead - there's a huge groundswell of opposition here (in the face of council support). The various garden centres do a roaring trade and are probably bring in some decent revenue considering all the things they'll need licensing etc for.

I would think the station would need a serious upgrade but not sure where a turnback platform would go in the local topography - and there is of course one (previously two) at GH. I suppose you'd say if you're digging out entire areas for housing then an embankment to put a new line on isn't much additional effort.

Yes. I have noticed (albeit with no scientific sampling whatsoever) that the Moorgates now 'lose' quite a lot of people to Thameslink at Finsbury Park (morning peak southbound) whereas pre 2018 if was mainly hordes from King's Cross terminators trying to pile on.

Absolutely - and that had the additional of reducing quite significantly the numbers getting on the Vic at H&I. Fascinating how passenger flows change when you disrupt them so significantly - I suspect stations felt a similar impact when the Lizzie started.

Grateful I'm not the only crayonista here (I guess it's allowed!) - since we're here any chance of a station at Bury St Junction south of the split to Enfield and Cheshunt? Just so I'd have an excuse to go to the adjacent boozer on the way home...
 

NCT

Established Member
Joined
18 Apr 2025
Messages
2,264
Location
London
I wonder how many people are now changing twice instead of once. I can see that GN - TL - EL to Bond street is an attractive alterative to GN - Vic at H&I for Oxford Circus. While it is one extra change, you are now on less cramped air conditioned 'big trains' for your entire journey.
 

321362

Member
Joined
31 Oct 2023
Messages
323
Location
London
A new station underground could replace the existing Clapton station
Do you need it? Send the WAML services all via Stratford - may be slightly slower, but significantly better for connectivity. Then XR2 can be the only operator through Clapton, replacing the Overground line. Possibility to also double Stonebridge Curve and send some peak time GA services via Markfield Curve and South Tottenham.
 

DJS76

Member
Joined
15 Aug 2020
Messages
61
Location
London
Do you need it? Send the WAML services all via Stratford - may be slightly slower, but significantly better for connectivity. Then XR2 can be the only operator through Clapton, replacing the Overground line. Possibility to also double Stonebridge Curve and send some peak time GA services via Markfield Curve and South Tottenham.
I don't think there is the capacity through Stratford due to the depot at Temple Mills and all the movements to and from. I assume a station at Hackney on CR2 would be underground, the line could then split with one line surfacing just south of Tottenham Hale then heading north towards Broxbourne and the other line could serve the underground station at Clapton and then surface somewhere west of St James Street and taking the line out to Chingford. The existing tracks could remain in place as a diversionary route.
 

321362

Member
Joined
31 Oct 2023
Messages
323
Location
London
I don't think there is the capacity through Stratford due to the depot at Temple Mills and all the movements to and from. I assume a station at Hackney on CR2 would be underground, the line could then split with one line surfacing just south of Tottenham Hale then heading north towards Broxbourne and the other line could serve the underground station at Clapton and then surface somewhere west of St James Street and taking the line out to Chingford. The existing tracks could remain in place as a diversionary route.
You're probably right about Stratford, especially if there are more HS1 operators coming to Temple Mills.

Why would the Broxbourne line not call at Clapton? It would go right past/under it.

Surfacing west of SJS would be tough as the line is elevated and there's a nature reserve in the way.
 

Class15

Established Member
Joined
30 Dec 2021
Messages
4,134
Location
North London or Mildmay line
Crowding on the MML slows will need to be compared with crowding the Hertford Loop to see which lines deserves the 2tph to London in that case.
ETCS allows 24tph in each direction through the Thameslink Core so there are still paths available, it just depends on how many trains are available to run any extra services. Can 717s run through the Thameslink core? If so, you could run the Crews Hill Thameslink service with 717s as IIRC there are some spares available.
Surely the simple solution is to run services from the Hertford Loop to Moorgate, and services from the MML, which have no alternative, into the Thameslink core.

I seriously doubt they are going to do a full-blown ‘MML vs Hertford Loop’ capacity analysis to be honest. Any additional services from the Loop will run to Moorgate if there is no additional capacity in the core (which, if there is, should be run as something like Crews Hill - Caterham).

Sevenoaks to Welwyn (all stations except Harringay and Hornsey) should become an all-day service, agreed, and Luton to Orpington (all stations except Cricklewood and Hendon, there’s no reason to keep skipping Kentish Town) as well.
 

waverley47

Member
Joined
17 Apr 2015
Messages
844
As a real life update to this threat, which may indeed warrant a new threat entirely, I can confirm that the business case to transfer operation of the Northern City Line (including ownership of the tunnel section south from Drayton Park) into TfL was submitted at the end of September this year.

The first reading of the proposal was yesterday, and the DfT have offered words of support. However, no decision will be made until after the decision on the Crews Hill New Town, expected in January next year.

It is expected that if it goes ahead, this proposal will be formally accepted before the end of 2026, with TfL running the Northern City Line from the December 2027 timetable change. Conveniently, this would be the last timetable change before the next London Assembly elections in May 2028, and although you may shout politics, I couldn't possibly comment...
 

Farigiraf

Member
Joined
23 Jul 2023
Messages
1,181
Location
Bridge on the River Cam
As a real life update to this threat, which may indeed warrant a new threat entirely, I can confirm that the business case to transfer operation of the Northern City Line (including ownership of the tunnel section south from Drayton Park) into TfL was submitted at the end of September this year.

The first reading of the proposal was yesterday, and the DfT have offered words of support. However, no decision will be made until after the decision on the Crews Hill New Town, expected in January next year.

It is expected that if it goes ahead, this proposal will be formally accepted before the end of 2026, with TfL running the Northern City Line from the December 2027 timetable change. Conveniently, this would be the last timetable change before the next London Assembly elections in May 2028, and although you may shout politics, I couldn't possibly comment...
Overgroundisation would kill off prospects of running Thameslink on the Hertford Loop, but the improved frequency that it would give on the line would partially negate that. Finsbury Park has 4tph into the core, plus there's the easy change to the Victoria at H&I, so we'll likely see mostly the same transfer patterns and passenger flows post-TfL takover except with higher numbers due to improved frequency. May not be the worst thing as the 12-car 700s usually have plenty of capacity, though this may change after Stevenage commuters move from LNER to TL.

The Welwyn route is another case - the quieter stops (Brookmans Park, Welham Green, Hadley Wood) are probably fine with 2tph (4tph wouldn't necessarily be bad either just may carry fresh air) while the TL to Sevenoaks could continue alongside the Overground skipping the quieter stops. There might be a case for dropping New Barnet, Ally Pally, Potters Bar and Hatfield from the Letchworth/Cambridge semifast services if this is achieved.

It's not been approved yet but I don't see why it shouldn't be, so thoughts on what the line name for the Overground Moorgate routes could be? Perhaps just 'Northern City Line'?
 

Mr. SW

Member
Joined
13 Sep 2023
Messages
534
Location
Armchair
"Northern City Line" seems a little mundane to me. I'm hoping for "Park and Palace Line" but something cringingly embarrassing or inappropriate will almost certainly be chosen by someone under the age of thirty looking up buzzwords and hip, trendy things on the internet that they will have little knowledge of.
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,638
"Northern City Line" seems a little mundane to me. I'm hoping for "Park and Palace Line" but something cringingly embarrassing or inappropriate will almost certainly be chosen by someone under the age of thirty looking up buzzwords and hip, trendy things on the internet that they will have little knowledge of.
Like a sycophantic Royal name would be, by over 60s who don't use PT? Or pay for it.

I think Northern City is a bit mundane too, and of course overlaps with Northern line (by design) and Waterloo & City line too.

If it was to get a Tube like singular name, I might suggest the Islington Line, given that it runs through a majority amount of the borough, and of course stops at H&I - and services Arsenal, Essex Road, Upper Street and Finsbury Park itself. Plus parts of Old St and Moorgate areas are in the LB as well.
 

NCT

Established Member
Joined
18 Apr 2025
Messages
2,264
Location
London
Overgroundisation would kill off prospects of running Thameslink on the Hertford Loop,

Good. We don't need everywhere-to-everywhere railways, we need things to be as close to self contained metros as possible (accepting these mainline operations will never be true metros, but I'll happily take quasi metros).

There's a reason nobody proposes running the Victoria line at Finsbury Park to Cockfosters as a semi-fast.
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,638
I wonder how many people are now changing twice instead of once. I can see that GN - TL - EL to Bond street is an attractive alterative to GN - Vic at H&I for Oxford Circus. While it is one extra change, you are now on less cramped air conditioned 'big trains' for your entire journey.
I don't see this happening, nothing will beat a cross-platform to a Victoria line, and its frequency - it's a rocket. Farringdon change and a 4 min wait for EL undoes that. I see it more like, if this goes metro - market Crews Hill and Potters Bar as "you basically live on the Victoria line"

They also have EL access at Moorgate (better for heading east, I suppose)

Good. We don't need everywhere-to-everywhere railways, we need things to be as close to self contained metros as possible (accepting these mainline operations will never be true metros, but I'll happily take quasi metros).

There's a reason nobody proposes running the Victoria line at Finsbury Park to Cockfosters as a semi-fast.
1000% - where we can, these should be metros. NCL should be either 12tph to Gordon Hill and done - or 6tph to each side, with 4tph Hertford and 2tph Stevenage... with 6tph to WGC. Nothing GN/TL calls between Finsbury Park and Hatfield - Potters Bar goes metro only and we only have to hope that the frequency uplift is enough. Maybe some peak calls. But get rid of outer calls at New Barnet, Ally Pally etc in entirety.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,387
Location
The Fens
We don't need everywhere-to-everywhere railways
I agree generally, but the missing link on the north side of Thameslink is the Hertford Loop, and Crews Hill New Town is going to need Thameslink more than the Northern City Line. A Thameslink Welwyn/Crews Hill-Sevenoaks/Orpington wouldn't be everywhere to everywhere, it is a 4tph Metro Alexandra Palace-Bickley, and similar to the St Albans-Sutton loop trains.

The everywhere to everywhere problems for Thameslink are elsewhere, mainly Horsham-Peterborough and Luton-Rainham.

Nothing GN/TL calls between Finsbury Park and Hatfield - Potters Bar goes metro only and we only have to hope that the frequency uplift is enough. Maybe some peak calls. But get rid of outer calls at New Barnet, Ally Pally etc in entirety.
This can't be done because there are no paths on the fast lines for the Kings Cross-Letchworth/Cambridge trains. They still have to run on the slow lines, and, the more intermediate calls they have, the less different they are from the all stations service.
 

NCT

Established Member
Joined
18 Apr 2025
Messages
2,264
Location
London
I agree generally, but the missing link on the north side of Thameslink is the Hertford Loop, and Crews Hill New Town is going to need Thameslink more than the Northern City Line. A Thameslink Welwyn/Crews Hill-Sevenoaks/Orpington wouldn't be everywhere to everywhere, it is a 4tph Metro Alexandra Palace-Bickley, and similar to the St Albans-Sutton loop trains.

The everywhere to everywhere problems for Thameslink are elsewhere, mainly Horsham-Peterborough and Luton-Rainham.


This can't be done because there are no paths on the fast lines for the Kings Cross-Letchworth/Cambridge trains. They still have to run on the slow lines, and, the more intermediate calls they have, the less different they are from the all stations service.

Hertford Loop has a nicely homogeneous operation, why break it? It's like saying Wood Green doesn't need more Holborn, it needs Oxford Circus. There's a cross-platform.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,387
Location
The Fens
Hertford Loop has a nicely homogeneous operation, why break it?
For Crews Hill New Town to have maximum chance of success, it needs trains to the Thameslink core. And the stations between Bowes Park and Gordon Hill will benefit from Thameslink too. The Hertford loop already shares with Thameslink between Finsbury Park and Alexandra Palace so it isn't a homogeneous operation now.

The Northern City Line service means that the Hertford loop would not be completely reliant on Thameslink, like Hitchin-Peterborough. Adding 2tph Thameslink trains isn't going to break it.
 

Farigiraf

Member
Joined
23 Jul 2023
Messages
1,181
Location
Bridge on the River Cam
This can't be done because there are no paths on the fast lines for the Kings Cross-Letchworth/Cambridge trains. They still have to run on the slow lines, and, the more intermediate calls they have, the less different they are from the all stations service.
What's the least-bad compromise? Having the Letchworth/Cambridge crawl behind all-stops services on the slow lines (meaning Foxton/Shepreth/Meldreth passengers should change at Stevenage, and Knebworth/Welwyn North get a really slow service unless they double-back at Stevenage - due to no fast line calls at all from WGC), or a less frequent Welwyn 'metro' (i.e. just 2tph GN and 2tph Thameslink) giving more capacity to route a semifast service through?
Even with 4tph to Welwyn, would you be able to increase the speed of the Letchworth/Cambridge enough by removing some calls, or is it a service eternally destined to be slow due to the Digswell bottleneck and fast line capacity constraints?
Either way, there will be losers - lower frequency to suburban ECML stations, or slower services for Knebworth, Welwyn North etc.
The tremendous cost of quad-tracking through Welwyn North and over Digswell Viaduct, after which you'd probably still have the fast lines at capacity, shows the need for things like the HS2 eastern branch or a new-build high-speed line paralleling the ECML in sections.
 