Controversially, I'd cut back the Bakerloo to Queen's Park and run 6tph, 8 car on the DC line (which I would convert to AC and integrate with WCML for diversions). Bakerloo Line then gets extended to Old Oak, with a new depot in Park Royal - I just some got new crayons
I've had this idea too!
Some time ago I had a severe attack of Crayonic Extendenitis, for which there is no cure, and proposed a similar scheme but with fun add-ons.
Cut back the Bakerloo to Queens Park and re-extend through to to Old Oak as above, but extend beyond, demolishing the west shed--
1: To North Acton and rise up just east of Hanger Lane and take over the Central Line to West Ruislip with a shared depot therein. (Yes, I know about the conductor rails)
2: Io Ealing Broadway, taking over the Central Line with a steep rise to join the original just to the north of West Acton.
3: To Uxbridge along an entirely new route with stops at places like Pitshanger Lane, Castle Bar Park, Hayes End, Brunel University and Uxbridge itself.
1 and 2 are pretty rubbish, actually; but 3 has legs. There would need to be some depot at the outer end but there would be knock-on effects.
> Piccadilly Line service withdrawn beyond Rayners Lane with affected passenger levels
> Passenger levels affected on the Central Line
> Passenger levels affected on the Elizabeth Line, probably a slight cut but that possibly may not be a bad thing.
> No tube stock beyond Queens Park so the platform height issue disappears as well as the interworking issues. A positive!
But more seriously, the Watford DC line may become under-trafficked due to the de facto cut in service, so there has to be compensation. An increased service this would almost certainly create problems in Euston with congestion and conflicting moves.
So, do this >>>
> Turn the reversing siding at Harrow over to the Overground.
> Reinstate Primrose Hill station (Complete rebuild) with some contrived passage or access way to Chalk Farm Station on the Northern Line. (I'm aware there maybe stuff in the way)
> Install some train reversing facility to the east: crossover, pocket track or similar. Or not, if extending the line to Camden Road. You choose.
> Rename the station "Chalk Farm"
> And/or upgrade the junction at Camden Road (requires land acquisition, bridge repairs, rehabilitation of erstwhile platforms 3 and 4 etc., etc., etc.) if continuing beyond Chalk Farm
> Run services Harrow/Willesden Junc to Chalk Farm/Camden Road between the normal Euston to Watford, thus controlling passenger numbers passing through Euston and also not over-trafficking Harrow - Watford.
My pencil case has just exploded.