The main tower, One Canada Square, featured in the 1991 film "Close My Eyes". It was stood there all alone surrounded by waste land and no other buildings.In the film, The Long Good Friday. The attorney representing The Mafia. Is there to discuss opportunities in Docklands and a possible Olympic Games in the area. The Olympics were held in Seoul, although the GLC did try and put a bid together.
The producer had a contact in the local council, who said there were plans in redevelopment of the docksIn the film, The Long Good Friday. The attorney representing The Mafia. Is there to discuss opportunities in Docklands and a possible Olympic Games in the area. The Olympics were held in Seoul, although the GLC did try and put a bid together.
At this time, the Bank <-> Lewisham service ran from Bank to either Crossharbour or Island Gardens and then Island Gardens to Lewisham. The main reason was for the platform extensions at Greenwich and Mudchute as well as the addition of platform 3 at Mudchute which has previously been just a siding. The platforms at Cutty Sark were not extended during the 3-car upgrades, just equipment installed to for SDO working to be introducedSome anecdotal memories from me, albeit only back in 2008 when the Bank <> Lewisham section was being upgraded in preparation for three car running, but gives credence to earlier comments and experiences of the capacity constraints over the years as the area expanded exponentially.
During the summer of 2008 (and for a fair few months), they effectively chopped the service back to every ten mins between Bank and Lewisham (used to be every three), and the service split at Island Gardens. I believe this was mainly due to the tricky extension work at Cutty Sark (where SDO continues to this day?). So for each half of the works, one tunnel under the Thames was closed for the changes, and you had to change from the reduced ten minute service at Island Gardens, for a cross-platform change to continue your journey south / north.
The knock on effect back in Canary Wharf (where I worked) at the time was quite pronounced. I lived in Greenwich, so opted to simply walk to work and back (just under an hour), but for the vast swathes of SE London / Kent commuters, they effectively gave up on the ten minute Bank <> Island Gardens shuttle, walked to Island Gardens from Canary Wharf, then waited for the southbound service to take them to Lewisham, and then on to their final destination. To this day it still sticks in my mind the sight of thousands of people in suits walking down Millharbour / East Ferry Road etc. to get to Island Gardens of an evening.
In the reverse direction, I know of quite a few folk who opted in the mornings to get a train from Maze Hill to London Bridge and then walk over said bridge into The City, rather than trying to negotiate the service changes on the DLR.
The Greenwich foot tunnel was always rammed with people like me who lived in Greenwich and the surroundings at the time, and opted to simply walk the whole way home. It always used to annoy the cyclists who (naughtily) cycled through the foot tunnel as there was such a sheer mass of people on foot that they simply couldn't! That said, the queues for the lifts were bonkers as one would expect.
All very necessary works of course, as the prior and subsequent increase in passenger numbers proves out!
Yes, saying it was a successful steal at 77m ignores how little it could do, how much more was spent so soon.It's worth pointing out that the original DLR idea from the early 1980s didn't really envisage Canary Wharf and the transformation of the area into a business district. They were expecting it to be mostly a way of getting from new housing areas towards the City, nothing more. The system was arguably never designed for heavy commuter use, which is why the system opened with just single car trains and why they needed to spend quite a bit of money on upgrading the system not long after opening.
With sufficient funding, a stop at Tower Hill?The general idea is that Tower Gateway should be closed and the branch demolished, with DLR trains going through Bank instead. They would then build an underground connection from Bank to Tower Hill
There isn’t a disused rail line near Mile End, was that dropped in early planning as soon as they went from tram to automated light rail?The fascinating thing about this is that the terminal at Mile End has already been changed to Stratford
Yes, saying it was a successful steal at 77m ignores how little it could do, how much more was spent so soon.
With sufficient funding, a stop at Tower Hill?
There isn’t a disused rail line near Mile End, was that dropped in early planning as soon as they went from tram to automated light rail?
Nobody could have predicted the success of LO & Crossrail, but using the old branch from Victoria Park down to Island Gardens via a rejigged Poplar, thence in a new tunnel to Greenwich to pick up whatever was left of the long-abandoned Greenwich Park branch to connect back at Nunhead would have been better, IMHO.
this vodeo has a lot of information on the opening day.
So, in summary, in answer to the original question, this was a political act resulting from a particular ideology.Here’s my two pence on the matter
We got the DLR because the Thatcher government in the early eighties cancelled phases two and three of the Jubilee line extension - these versions of the extension took a much different route, it wouldn’t have cross the river southwards until Surrey Quays from there it would have either been extended further to New Cross, Lewisham and Hayes, or to North Greenwich then onwards to Woolwich Arsenal and Thamesmead, worth noting that North Greenwich station survived both versions of the extended route.
However the Docklands was being redeveloped and needed transportation, so we got the DLR, which roughly follows the same proposed route where the Jubilee line could have been extended had it been extended in the early to mid 80s had it been extended to Lewisham and Woolwich.
No one really anticipated how successful the DLR would become with its various extensions
Wouldn't closing Tower Gateway and extending the DLR to the old Jubilee platforms at Charing Cross via the Strand and City Thameslink be better?From what I understand, the problem with Bank is that there's just too many people starting their journey on the DLR at that point. Getting rid of the (relatively) underused Tower Gateway would allow them to put more trains towards Bank, but this comes with the problem that the station complex can't handle a massive increase in traffic, even with the large reconstruction of the station. So, if the DLR is extended via City Thameslink, Euston to Kings Cross, then you have people starting their journey on the DLR at those stations. You can then run more trains through Bank without serious overcrowding, because you've eliminated the need to use the station at all.
The DLR would also be attractive to people coming from the WCML/ECML/HS2, because they would only need to transfer onto the DLR directly to the Docklands, rather than having to mess about with an inevitably busy train to Farringdon and then a busy interchange to the Elizabeth Line.
Wouldn't closing Tower Gateway and extending the DLR to the old Jubilee platforms at Charing Cross via the Strand and City Thameslink be better?
It makes use of existing disused tunnels as far as Wellington St near Aldwych, it has been proposed by the DLR before in 2011, and it provides a key link to Thameslink + the Bakerloo/Northern lines for a range of key connections.
Yes, it doesn't provide the range of direct connections that a station in the Euston/King's Cross/St Pancras area would, but that would be an incredibly expensive extension to deliver.
So, in summary, in answer to the original question, this was a political act resulting from a particular ideology.
No one really anticipated how successful the DLR would become with its various extensions
If I remember correctly (it's been a while), there's passive provision for an underground station for Tower Hill / Gateway? Halfway down the Bank tunnel it levels out for a short while before diving further underground?
but I do feel longer-term we'd have been better served with metro heavy rail a-la the overground/SSL
I can't see any reason why the DLR technology couldn't match the capabilities of an Underground line, with the exception of sharing track with Network Rail. TfL were assuming DLR rather than Tube technology when studying options for the Chelsea-Hackney line as a freestanding route, though heavy rail technology and through running to the national network was ultimately preferred in the form of Crossrail 2.Obviously, the answer is that it's much newer, technology moves on, etc., but I do feel longer-term we'd have been better served with metro heavy rail a-la the overground/SSL.
I doubt DLR would fit down Tube-sized tunnels.Wouldn't closing Tower Gateway and extending the DLR to the old Jubilee platforms at Charing Cross via the Strand and City Thameslink be better?
I believe the reason for the 3rd platform at Mudchute was difficulties with tipping out at Crossharbour, done for the centre siding south of there and the siding alongside Mudchute station. Having a platform means that tipping out is not required and trains can just stand there or reverse. It is surprising nowadays how often I see a train stabled there.At this time, the Bank <-> Lewisham service ran from Bank to either Crossharbour or Island Gardens and then Island Gardens to Lewisham. The main reason was for the platform extensions at Greenwich and Mudchute as well as the addition of platform 3 at Mudchute which has previously been just a siding.
Of course, the DLR uses the same (in some respects better, albeit an older version) signalling system as the Jubilee, Northern and Sub-surface lines. The technologies are pretty much identical - LUL have paid a lot of money to have full bi-directional capability removed from their flavours of Seltrac, and of course the notable differences in door operation and train starting.I can't see any reason why the DLR technology couldn't match the capabilities of an Underground line, with the exception of sharing track with Network Rail.
Wouldn't closing Tower Gateway and extending the DLR to the old Jubilee platforms at Charing Cross via the Strand and City Thameslink be better?
It makes use of existing disused tunnels as far as Wellington St near Aldwych, it has been proposed by the DLR before in 2011, and it provides a key link to Thameslink + the Bakerloo/Northern lines for a range of key connections.
Yes, it doesn't provide the range of direct connections that a station in the Euston/King's Cross/St Pancras area would, but that would be an incredibly expensive extension to deliver.
If we're tunnelling, how about branching off at Monument, heading west and linking up with the Waterloo and City? Then: close Tower Gateway, put in a junction underground to a new station at Fenchurch Street, and on to Kings Cross St Pancras via Bank, Moorgate and the tracks no longer in use after the Elizabeth Line came in?I think the problem with this particular routing is that it doesn't relieve the Northern line or provide a direct connection from the WCML/ECML and HS1/2. It is probably quite easy to deliver, but if you're going to City Thameslink, you might as well continue onwards within zone 1 rather than ending at Charing Cross.
Exactly why suggestions like mine above should be ignored - it's doing what it should be, it doesn't need turning into a pseudo-tube.I'd actually say that the success of the DLR partially comes from the fact that it's a relatively simple and straightforward operation, whereas any heavy rail or metro type operation is much, much more complicated.
With the upgrades to the DLR over the years and the new trains having a passenger capacity somewhere between 1995 & 1996 stock - is there actually much benefit to to going to the full underground spec vs DLR spec?I can't see any reason why the DLR technology couldn't match the capabilities of an Underground line, with the exception of sharing track with Network Rail. TfL were assuming DLR rather than Tube technology when studying options for the Chelsea-Hackney line as a freestanding route, though heavy rail technology and through running to the national network was ultimately preferred in the form of Crossrail 2.
I doubt DLR would fit down Tube-sized tunnels.
I believe the S stock meets main line crashworthiness standards, or something similar, and the DLR stock doesn't. So it would be more complicated for DLR stock to share track with main line trains as the S stock does on parts of the Metropolitan and District.With the upgrades to the DLR over the years and the new trains having a passenger capacity somewhere between 1995 & 1996 stock - is there actually much benefit to to going to the full underground spec vs DLR spec?
With the appropriate traction package could you, theoretically, even use what are basically the same trains on both the DLR and subsurface lines?
It doesn't necessarily directly relieve the Northern or directly connect to the KXSP/Euston complex, but it does connect directly to another branch of the Northern at a station that is much less congested than Bank, and Thameslink (which has useful airport connections, as well as links to KXSP).I think the problem with this particular routing is that it doesn't relieve the Northern line or provide a direct connection from the WCML/ECML and HS1/2. It is probably quite easy to deliver, but if you're going to City Thameslink, you might as well continue onwards within zone 1 rather than ending at Charing Cross.
Depends how much Canary Wharf is willing to pay I suppose. I don't think a KXSP line is something that TfL or London taxpayers should contribute to as a priority.Yes, it will be expensive, but it would considerably relieve the Northern Line and essentially connect all four major lines to the Docklands without requiring the use of alternative (and overcrowded) infrastructure. If Canary Wharf are willing to contribute to the building costs, it might well be one of those things that should be built, although I don't have much faith in such a project being built without substantial overruns.
Even if they had to be enlarged, the Jubilee line tunnels only exist up to a point under Wellington St near Aldwych, as far as I know, so it's only about half a mile max. that you would have to upgrade.I doubt DLR would fit down Tube-sized tunnels.
If you have a look at the excellent Carto Metro map of the Tube and associated London lines (https://cartometro.com/cartes/metro-tram-london/), it will show you that the W&C and the DLR at Bank/Monument are unfortunately aligned in the wrong direction (and possibly at different levels, if I remember correctly).If we're tunnelling, how about branching off at Monument, heading west and linking up with the Waterloo and City? Then: close Tower Gateway, put in a junction underground to a new station at Fenchurch Street, and on to Kings Cross St Pancras via Bank, Moorgate and the tracks no longer in use after the Elizabeth Line came in?
We built the tyne and wear metro, the manchester metrolink. the sheffield supertram, the croyden tramway..................I think a better question might be "Why haven't we built more DLRs elsewhere?"
Yes, there's a flat straight bit of the tunnel, it's fairly obvious from the train or a front view videoRegarding the passive provision for a station at Tower Hill that has been mentioned in this thread, is it known what this actually consists of?
Yes - Google shows similar (using Streetview inside the station and watching the map pin move is how I came to realise that the Northern Line platforms are as close to Monument as Bank!). But Carto does make my point; don't turn right at Monument, head straight on, and eventually you'll hit the W&C tunnel. They will be at different levels, but the DLR will cope with level changes better than heavy rail/tube stock. Add in stops at Cannon street and Blackfriars, and you've got the southern terminals sewn up. Yes, I'm crayoning wildlyIf you have a look at the excellent Carto Metro map of the Tube and associated London lines (https://cartometro.com/cartes/metro-tram-london/), it will show you that the W&C and the DLR at Bank/Monument are unfortunately aligned in the wrong direction (and possibly at different levels, if I remember correctly).
Which kind-of makes my other point, that the DLR is a good light railway, not a tube, and I should be largely ignoredReusing some of the old City Widened Line sidings near Moorgate is a good idea, but the map will show you again that these tracks end at Farringdon, so you'd have to make the DLR trains compatible with running on Underground/Thameslink infrastructure, or somehow tunnel under Farringdon including Hatton Garden vaults and head towards KXSP/Euston that way.
Haha, you'd be partially duplicating the District.Yes - Google shows similar (using Streetview inside the station and watching the map pin move is how I came to realise that the Northern Line platforms are as close to Monument as Bank!). But Carto does make my point; don't turn right at Monument, head straight on, and eventually you'll hit the W&C tunnel. They will be at different levels, but the DLR will cope with level changes better than heavy rail/tube stock. Add in stops at Cannon street and Blackfriars, and you've got the southern terminals sewn up. Yes, I'm crayoning wildly![]()
An extension to Charing Cross via a station near Aldwych and an interchange at City Thameslink would help serve an area of London relatively poorly served by rail-based forms of transport
Haha, you'd be partially duplicating the District.