Why did they have the DLR , rather than extend the Underground/overground

Status
Not open for further replies.

MP33

Member
Joined
19 Jun 2011
Messages
635
In the film, The Long Good Friday. The attorney representing The Mafia. Is there to discuss opportunities in Docklands and a possible Olympic Games in the area. The Olympics were held in Seoul, although the GLC did try and put a bid together.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

greyman42

Established Member
Joined
14 Aug 2017
Messages
5,368
In the film, The Long Good Friday. The attorney representing The Mafia. Is there to discuss opportunities in Docklands and a possible Olympic Games in the area. The Olympics were held in Seoul, although the GLC did try and put a bid together.
The main tower, One Canada Square, featured in the 1991 film "Close My Eyes". It was stood there all alone surrounded by waste land and no other buildings.
 

Pegpilot

Member
Joined
26 Mar 2020
Messages
120
Location
Northants
It must have been 1991 when I went up to the top floor of 1CW in the builders' lift on the outside of the structure - never been so scared ! I was part of an LUL party led by Bill Clarke, then Railway Extensions Director, who was getting to grips with planning the JLE. Of course the collapse of O&Y left the project in the mire as Maggie still insisted on the private sector contribution to the project. The result was all smoke and mirrors, with much of the private sector contribution phased years downstream. And LUL moved its engineering headquarters to 30 South Colonnade as a means of helping the creditor banks prop up the entire Canary Wharf project. Oh, and don't get me started about the plans for moving block signalling for the JLE expounded by then Engineering Director, Brian Mellitt. After LUL he proposed the same for WCML when he went to Railtrack. And that went well....
 

MP33

Member
Joined
19 Jun 2011
Messages
635
I worked for a Government Department that went to Docklands. The reason we went there, was that tenants were wanted that were unlikely to go bust.
 

Simon75

On Moderation
Joined
25 May 2016
Messages
1,528
In the film, The Long Good Friday. The attorney representing The Mafia. Is there to discuss opportunities in Docklands and a possible Olympic Games in the area. The Olympics were held in Seoul, although the GLC did try and put a bid together.
The producer had a contact in the local council, who said there were plans in redevelopment of the docks
 

TheManWho

Member
Joined
15 Jul 2010
Messages
175
Some anecdotal memories from me, albeit only back in 2008 when the Bank <> Lewisham section was being upgraded in preparation for three car running, but gives credence to earlier comments and experiences of the capacity constraints over the years as the area expanded exponentially.

During the summer of 2008 (and for a fair few months), they effectively chopped the service back to every ten mins between Bank and Lewisham (used to be every three), and the service split at Island Gardens. I believe this was mainly due to the tricky extension work at Cutty Sark (where SDO continues to this day?). So for each half of the works, one tunnel under the Thames was closed for the changes, and you had to change from the reduced ten minute service at Island Gardens, for a cross-platform change to continue your journey south / north.

The knock on effect back in Canary Wharf (where I worked) at the time was quite pronounced. I lived in Greenwich, so opted to simply walk to work and back (just under an hour), but for the vast swathes of SE London / Kent commuters, they effectively gave up on the ten minute Bank <> Island Gardens shuttle, walked to Island Gardens from Canary Wharf, then waited for the southbound service to take them to Lewisham, and then on to their final destination. To this day it still sticks in my mind the sight of thousands of people in suits walking down Millharbour / East Ferry Road etc. to get to Island Gardens of an evening.

In the reverse direction, I know of quite a few folk who opted in the mornings to get a train from Maze Hill to London Bridge and then walk over said bridge into The City, rather than trying to negotiate the service changes on the DLR.

The Greenwich foot tunnel was always rammed with people like me who lived in Greenwich and the surroundings at the time, and opted to simply walk the whole way home. It always used to annoy the cyclists who (naughtily) cycled through the foot tunnel as there was such a sheer mass of people on foot that they simply couldn't! That said, the queues for the lifts were bonkers as one would expect.

All very necessary works of course, as the prior and subsequent increase in passenger numbers proves out!
At this time, the Bank <-> Lewisham service ran from Bank to either Crossharbour or Island Gardens and then Island Gardens to Lewisham. The main reason was for the platform extensions at Greenwich and Mudchute as well as the addition of platform 3 at Mudchute which has previously been just a siding. The platforms at Cutty Sark were not extended during the 3-car upgrades, just equipment installed to for SDO working to be introduced

The Lewisham to Island Gardens service was evey 10 minutes as only 4 trains could be stabled remotely- 3 were in service with the 4th acting as a "spare" stabled at Lewisham during the day.

Halfway through the blockade, the services swapped platforms at Island Gardens, to enable works to be carried out on the other platforms at Mudchute and Greenwich. The night before the swap, the vehicles that were stabled remotely south of Island Gardens were taken back to Beckton and swapped with 4 other double-sets.

I can remember that summer well, the weather was pretty good throughout and some of the regular staff on the trains built up a really good raport with the regular commuters on the Island to Lewisham services.
 
Last edited:

SynthD

Established Member
Joined
4 Apr 2020
Messages
2,055
Location
UK
It's worth pointing out that the original DLR idea from the early 1980s didn't really envisage Canary Wharf and the transformation of the area into a business district. They were expecting it to be mostly a way of getting from new housing areas towards the City, nothing more. The system was arguably never designed for heavy commuter use, which is why the system opened with just single car trains and why they needed to spend quite a bit of money on upgrading the system not long after opening.
Yes, saying it was a successful steal at 77m ignores how little it could do, how much more was spent so soon.
The general idea is that Tower Gateway should be closed and the branch demolished, with DLR trains going through Bank instead. They would then build an underground connection from Bank to Tower Hill
With sufficient funding, a stop at Tower Hill?
The fascinating thing about this is that the terminal at Mile End has already been changed to Stratford
There isn’t a disused rail line near Mile End, was that dropped in early planning as soon as they went from tram to automated light rail?
 

mr_jrt

Established Member
Joined
30 May 2011
Messages
1,578
Location
Brighton
I do find it curious how for so long the "big" railway couldn't manage to tunnel under the river, resulting all those dead end short branches, but the DLR has had no problem building even bigger tunnels decades later, but their usage isn't maximised (in the sense of being part of the national network and being useful for things like freight) as it's a separate system.

Obviously, the answer is that it's much newer, technology moves on, etc., but I do feel longer-term we'd have been better served with metro heavy rail a-la the overground/SSL. Nobody could have predicted the success of LO & Crossrail, but using the old branch from Victoria Park down to Island Gardens via a rejigged Poplar, thence in a new tunnel to Greenwich to pick up whatever was left of the long-abandoned Greenwich Park branch to connect back at Nunhead would have been better, IMHO.

Coupled with a diversion of the District Line from Tower Bridge up and along the viaduct taken by the DLR through Poplar, thence eastwards towards Beckton onto Dagenham & London City under the river onto Woolwich. Crossrail went some way to correcting the latter, but ideally we should have had the District serving that axis much, much sooner.
 

Jimini

Established Member
Joined
8 Oct 2006
Messages
2,175
Location
Reading
Yes, saying it was a successful steal at 77m ignores how little it could do, how much more was spent so soon.

With sufficient funding, a stop at Tower Hill?

There isn’t a disused rail line near Mile End, was that dropped in early planning as soon as they went from tram to automated light rail?


If I remember correctly (it's been a while), there's passive provision for an underground station for Tower Hill / Gateway? Halfway down the Bank tunnel it levels out for a short while before diving further underground?

Disclaimer: it's been over 15 years since I worked in Canary Wharf so might have misremembered that!
 

TrenHotel

Member
Joined
31 Jul 2011
Messages
210
Location
London
Nobody could have predicted the success of LO & Crossrail, but using the old branch from Victoria Park down to Island Gardens via a rejigged Poplar, thence in a new tunnel to Greenwich to pick up whatever was left of the long-abandoned Greenwich Park branch to connect back at Nunhead would have been better, IMHO.

There wasn’t much left of the Greenwich Park branch by the mid/late-80s, most of it had been filled in or built on.

The 1999 Lewisham extension passes close to the remaining tiny bits of the line (either side of Brookmill Road) at Elverson Road.
 

NorthKent1989

Established Member
Joined
13 May 2017
Messages
2,172
Here’s my two pence on the matter

We got the DLR because the Thatcher government in the early eighties cancelled phases two and three of the Jubilee line extension - these versions of the extension took a much different route, it wouldn’t have cross the river southwards until Surrey Quays from there it would have either been extended further to New Cross, Lewisham and Hayes, or to North Greenwich then onwards to Woolwich Arsenal and Thamesmead, worth noting that North Greenwich station survived both versions of the extended route.

However the Docklands was being redeveloped and needed transportation, so we got the DLR, which roughly follows the same proposed route where the Jubilee line could have been extended had it been extended in the early to mid 80s had it been extended to Lewisham and Woolwich.

No one really anticipated how successful the DLR would become with its various extensions
 

Djgr

Established Member
Joined
30 Jul 2018
Messages
3,402
Here’s my two pence on the matter

We got the DLR because the Thatcher government in the early eighties cancelled phases two and three of the Jubilee line extension - these versions of the extension took a much different route, it wouldn’t have cross the river southwards until Surrey Quays from there it would have either been extended further to New Cross, Lewisham and Hayes, or to North Greenwich then onwards to Woolwich Arsenal and Thamesmead, worth noting that North Greenwich station survived both versions of the extended route.

However the Docklands was being redeveloped and needed transportation, so we got the DLR, which roughly follows the same proposed route where the Jubilee line could have been extended had it been extended in the early to mid 80s had it been extended to Lewisham and Woolwich.

No one really anticipated how successful the DLR would become with its various extensions
So, in summary, in answer to the original question, this was a political act resulting from a particular ideology.
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,171
From what I understand, the problem with Bank is that there's just too many people starting their journey on the DLR at that point. Getting rid of the (relatively) underused Tower Gateway would allow them to put more trains towards Bank, but this comes with the problem that the station complex can't handle a massive increase in traffic, even with the large reconstruction of the station. So, if the DLR is extended via City Thameslink, Euston to Kings Cross, then you have people starting their journey on the DLR at those stations. You can then run more trains through Bank without serious overcrowding, because you've eliminated the need to use the station at all.

The DLR would also be attractive to people coming from the WCML/ECML/HS2, because they would only need to transfer onto the DLR directly to the Docklands, rather than having to mess about with an inevitably busy train to Farringdon and then a busy interchange to the Elizabeth Line.
Wouldn't closing Tower Gateway and extending the DLR to the old Jubilee platforms at Charing Cross via the Strand and City Thameslink be better?
It makes use of existing disused tunnels as far as Wellington St near Aldwych, it has been proposed by the DLR before in 2011, and it provides a key link to Thameslink + the Bakerloo/Northern lines for a range of key connections.
Yes, it doesn't provide the range of direct connections that a station in the Euston/King's Cross/St Pancras area would, but that would be an incredibly expensive extension to deliver.
 

Cloud Strife

Established Member
Joined
25 Feb 2014
Messages
2,964
Wouldn't closing Tower Gateway and extending the DLR to the old Jubilee platforms at Charing Cross via the Strand and City Thameslink be better?
It makes use of existing disused tunnels as far as Wellington St near Aldwych, it has been proposed by the DLR before in 2011, and it provides a key link to Thameslink + the Bakerloo/Northern lines for a range of key connections.

I think the problem with this particular routing is that it doesn't relieve the Northern line or provide a direct connection from the WCML/ECML and HS1/2. It is probably quite easy to deliver, but if you're going to City Thameslink, you might as well continue onwards within zone 1 rather than ending at Charing Cross.

Yes, it doesn't provide the range of direct connections that a station in the Euston/King's Cross/St Pancras area would, but that would be an incredibly expensive extension to deliver.

Yes, it will be expensive, but it would considerably relieve the Northern Line and essentially connect all four major lines to the Docklands without requiring the use of alternative (and overcrowded) infrastructure. If Canary Wharf are willing to contribute to the building costs, it might well be one of those things that should be built, although I don't have much faith in such a project being built without substantial overruns.

So, in summary, in answer to the original question, this was a political act resulting from a particular ideology.

Sort of, sort of not. The idea wasn't really bad, because it showed that a light rail system could be developed cheaply by reusing existing infrastructure. It arguably opened the door for things like Metrolink in Manchester, and it certainly showed that the UK was capable of creative and low cost public transport investments. It did the job that it was supposed to do, and it was certainly more sensible than building the Fleet Line extension at the time. Given the financial problems that Canary Wharf had, I'd argue that it was quite foresighted to build the DLR rather than a full scale metro, as there was absolutely no guarantee that it would actually be needed.

One thing that perhaps shouldn't be underestimated is that the DLR's operating philosophy showed that public transport didn't need to be ruinously expensive in terms of operation. The DLR certainly showed that you didn't need to have conductors on every train, and I think we generally learnt a lot by having low cost, modular stations as opposed to building giant structures. It really shows today in Berlin in comparison: many of the S-Bahn stations are hopelessly overequipped for the service that exists, such as with unused structures where shops and other facilities once resided.

No one really anticipated how successful the DLR would become with its various extensions

I have the feeling from looking through archive documentation that the DLR was essentially a "well, if it fails, we haven't spent much money on it" type of project. You can only really see that they started to have expectations towards the DLR once it becomes clear that Canary Wharf is being considered as a new banking centre, and the Bank extension was already being discussed in 1985. There's an interesting bit from Hansard where the Secretary of State for Transport says that the companies involved with the Canary Wharf project consider the Bank extension as being absolutely essential, and that they would also underwrite the privatisation of the DLR as a result.

One fascinating thing is that the government of the day were already planning privatisation of the DLR even before it opened, although they paid for the building so that it would facilitate development of the Docklands. The idea considered was that they would agree to give the DLR for a symbolic price as long as the extension to Bank was built for private money, and the intention seems to have been to sell the DLR to the banks involved with Canary Wharf.

== Doublepost prevention - post automatically merged: ==

If I remember correctly (it's been a while), there's passive provision for an underground station for Tower Hill / Gateway? Halfway down the Bank tunnel it levels out for a short while before diving further underground?

I've seen this mentioned in several places, but it's not clear at all as to what this provision actually is. It might just be as simple as a flat section of track around Tower Hill and nothing more.

but I do feel longer-term we'd have been better served with metro heavy rail a-la the overground/SSL

Perhaps, but there was absolutely no will to spend so much money on such a thing. The initial idea of the DLR was that it would be privatised and owned by the companies involved with Canary Wharf, as they would be the ones benefitting from it. Having said that, the simple nature of the DLR made it very easy to expand and even to consider branches that would never have been considered for heavy rail metro operation.

I'd actually say that the success of the DLR partially comes from the fact that it's a relatively simple and straightforward operation, whereas any heavy rail or metro type operation is much, much more complicated.
 
Last edited:

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,728
Location
Nottingham
Obviously, the answer is that it's much newer, technology moves on, etc., but I do feel longer-term we'd have been better served with metro heavy rail a-la the overground/SSL.
I can't see any reason why the DLR technology couldn't match the capabilities of an Underground line, with the exception of sharing track with Network Rail. TfL were assuming DLR rather than Tube technology when studying options for the Chelsea-Hackney line as a freestanding route, though heavy rail technology and through running to the national network was ultimately preferred in the form of Crossrail 2.
Wouldn't closing Tower Gateway and extending the DLR to the old Jubilee platforms at Charing Cross via the Strand and City Thameslink be better?
I doubt DLR would fit down Tube-sized tunnels.
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,321
At this time, the Bank <-> Lewisham service ran from Bank to either Crossharbour or Island Gardens and then Island Gardens to Lewisham. The main reason was for the platform extensions at Greenwich and Mudchute as well as the addition of platform 3 at Mudchute which has previously been just a siding.
I believe the reason for the 3rd platform at Mudchute was difficulties with tipping out at Crossharbour, done for the centre siding south of there and the siding alongside Mudchute station. Having a platform means that tipping out is not required and trains can just stand there or reverse. It is surprising nowadays how often I see a train stabled there.
 

bluegoblin7

Established Member
Joined
10 May 2011
Messages
2,163
Location
JB
I can't see any reason why the DLR technology couldn't match the capabilities of an Underground line, with the exception of sharing track with Network Rail.
Of course, the DLR uses the same (in some respects better, albeit an older version) signalling system as the Jubilee, Northern and Sub-surface lines. The technologies are pretty much identical - LUL have paid a lot of money to have full bi-directional capability removed from their flavours of Seltrac, and of course the notable differences in door operation and train starting.

Those suggesting that 'DLR technology [can't] match...[LUL]' (and not edwin_m who I've quoted!) clearly don't understand the underlying technology of the DLR.
 

YorksLad12

Established Member
Joined
5 Feb 2020
Messages
2,718
Location
Leeds
Wouldn't closing Tower Gateway and extending the DLR to the old Jubilee platforms at Charing Cross via the Strand and City Thameslink be better?
It makes use of existing disused tunnels as far as Wellington St near Aldwych, it has been proposed by the DLR before in 2011, and it provides a key link to Thameslink + the Bakerloo/Northern lines for a range of key connections.
Yes, it doesn't provide the range of direct connections that a station in the Euston/King's Cross/St Pancras area would, but that would be an incredibly expensive extension to deliver.

I think the problem with this particular routing is that it doesn't relieve the Northern line or provide a direct connection from the WCML/ECML and HS1/2. It is probably quite easy to deliver, but if you're going to City Thameslink, you might as well continue onwards within zone 1 rather than ending at Charing Cross.
If we're tunnelling, how about branching off at Monument, heading west and linking up with the Waterloo and City? Then: close Tower Gateway, put in a junction underground to a new station at Fenchurch Street, and on to Kings Cross St Pancras via Bank, Moorgate and the tracks no longer in use after the Elizabeth Line came in?

I'd actually say that the success of the DLR partially comes from the fact that it's a relatively simple and straightforward operation, whereas any heavy rail or metro type operation is much, much more complicated.
Exactly why suggestions like mine above should be ignored - it's doing what it should be, it doesn't need turning into a pseudo-tube.
 

kevjs

Member
Joined
4 Sep 2013
Messages
469
I can't see any reason why the DLR technology couldn't match the capabilities of an Underground line, with the exception of sharing track with Network Rail. TfL were assuming DLR rather than Tube technology when studying options for the Chelsea-Hackney line as a freestanding route, though heavy rail technology and through running to the national network was ultimately preferred in the form of Crossrail 2.

I doubt DLR would fit down Tube-sized tunnels.
With the upgrades to the DLR over the years and the new trains having a passenger capacity somewhere between 1995 & 1996 stock - is there actually much benefit to to going to the full underground spec vs DLR spec?

With the appropriate traction package could you, theoretically, even use what are basically the same trains on both the DLR and subsurface lines?
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,728
Location
Nottingham
With the upgrades to the DLR over the years and the new trains having a passenger capacity somewhere between 1995 & 1996 stock - is there actually much benefit to to going to the full underground spec vs DLR spec?

With the appropriate traction package could you, theoretically, even use what are basically the same trains on both the DLR and subsurface lines?
I believe the S stock meets main line crashworthiness standards, or something similar, and the DLR stock doesn't. So it would be more complicated for DLR stock to share track with main line trains as the S stock does on parts of the Metropolitan and District.

But other than that, DLR stock is probably lighter so uses less energy. Compared to Tube stock it is more roomy inside and much more similar to stock running on other routes internationally, so likely to be easier and cheaper to procure.
 

mr_jrt

Established Member
Joined
30 May 2011
Messages
1,578
Location
Brighton
I dunno. AFAIAA, the S-stock are basically "normal" trains, not too dissimilar from their cousins the Capitalstars, so you would imagine those would be very easy to acquire. The DLR stock were originally trams (which are also easy to acquire), which is why they went off to Essen (I think?) when London upgraded them to something a bit more heavy duty. From what I recall, the capacity of a 9-car DLR train vs. a S8 train is a lot closer than their predecessors, but the S-Stock still wins out. But I looked at that many years ago, so I can't recall the figures exactly.
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,171
I think the problem with this particular routing is that it doesn't relieve the Northern line or provide a direct connection from the WCML/ECML and HS1/2. It is probably quite easy to deliver, but if you're going to City Thameslink, you might as well continue onwards within zone 1 rather than ending at Charing Cross.
It doesn't necessarily directly relieve the Northern or directly connect to the KXSP/Euston complex, but it does connect directly to another branch of the Northern at a station that is much less congested than Bank, and Thameslink (which has useful airport connections, as well as links to KXSP).
Yes, it will be expensive, but it would considerably relieve the Northern Line and essentially connect all four major lines to the Docklands without requiring the use of alternative (and overcrowded) infrastructure. If Canary Wharf are willing to contribute to the building costs, it might well be one of those things that should be built, although I don't have much faith in such a project being built without substantial overruns.
Depends how much Canary Wharf is willing to pay I suppose. I don't think a KXSP line is something that TfL or London taxpayers should contribute to as a priority.
I doubt DLR would fit down Tube-sized tunnels.
Even if they had to be enlarged, the Jubilee line tunnels only exist up to a point under Wellington St near Aldwych, as far as I know, so it's only about half a mile max. that you would have to upgrade.
If we're tunnelling, how about branching off at Monument, heading west and linking up with the Waterloo and City? Then: close Tower Gateway, put in a junction underground to a new station at Fenchurch Street, and on to Kings Cross St Pancras via Bank, Moorgate and the tracks no longer in use after the Elizabeth Line came in?
If you have a look at the excellent Carto Metro map of the Tube and associated London lines (https://cartometro.com/cartes/metro-tram-london/), it will show you that the W&C and the DLR at Bank/Monument are unfortunately aligned in the wrong direction (and possibly at different levels, if I remember correctly).
Reusing some of the old City Widened Line sidings near Moorgate is a good idea, but the map will show you again that these tracks end at Farringdon, so you'd have to make the DLR trains compatible with running on Underground/Thameslink infrastructure, or somehow tunnel under Farringdon including Hatton Garden vaults and head towards KXSP/Euston that way.
 

plugwash

Established Member
Joined
29 May 2015
Messages
1,995
I think a better question might be "Why haven't we built more DLRs elsewhere?"
We built the tyne and wear metro, the manchester metrolink. the sheffield supertram, the croyden tramway..................

Each system is slightly different, but they have in common that they took over unused or under-used rail corridors and turned them into high-frequency transit services using relatively light/cheap vehicles.

But now we are running out of useful ex-rail corridors. There are disused railways sure, but most of them are far from city centers, have been built on, or are difficult to join-up into a meaningful whole.

We also seem to have lost the ability to build anything on a reasonable timescale or budget.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,560
Location
Lichfield
Regarding the passive provision for a station at Tower Hill that has been mentioned in this thread, is it known what this actually consists of?
 

stuu

Established Member
Joined
2 Sep 2011
Messages
3,772
Regarding the passive provision for a station at Tower Hill that has been mentioned in this thread, is it known what this actually consists of?
Yes, there's a flat straight bit of the tunnel, it's fairly obvious from the train or a front view video
 

YorksLad12

Established Member
Joined
5 Feb 2020
Messages
2,718
Location
Leeds
If you have a look at the excellent Carto Metro map of the Tube and associated London lines (https://cartometro.com/cartes/metro-tram-london/), it will show you that the W&C and the DLR at Bank/Monument are unfortunately aligned in the wrong direction (and possibly at different levels, if I remember correctly).
Yes - Google shows similar (using Streetview inside the station and watching the map pin move is how I came to realise that the Northern Line platforms are as close to Monument as Bank!). But Carto does make my point; don't turn right at Monument, head straight on, and eventually you'll hit the W&C tunnel. They will be at different levels, but the DLR will cope with level changes better than heavy rail/tube stock. Add in stops at Cannon street and Blackfriars, and you've got the southern terminals sewn up. Yes, I'm crayoning wildly :lol:
Reusing some of the old City Widened Line sidings near Moorgate is a good idea, but the map will show you again that these tracks end at Farringdon, so you'd have to make the DLR trains compatible with running on Underground/Thameslink infrastructure, or somehow tunnel under Farringdon including Hatton Garden vaults and head towards KXSP/Euston that way.
Which kind-of makes my other point, that the DLR is a good light railway, not a tube, and I should be largely ignored :lol:
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,171
Yes - Google shows similar (using Streetview inside the station and watching the map pin move is how I came to realise that the Northern Line platforms are as close to Monument as Bank!). But Carto does make my point; don't turn right at Monument, head straight on, and eventually you'll hit the W&C tunnel. They will be at different levels, but the DLR will cope with level changes better than heavy rail/tube stock. Add in stops at Cannon street and Blackfriars, and you've got the southern terminals sewn up. Yes, I'm crayoning wildly :lol:
Haha, you'd be partially duplicating the District.
The W and C is better extended south into South London in a different direction to Crossrail 2 post-2050.