Presumably without opening the doors!an as-yet unbuilt station at Canary Wharf, so the train stopped there even though the station had yet to be built.
Your analysis is pretty correct, except for presenting it in an unfavourable light. Built to budget (actually it was £77m) was an absolute bargain compared to what you got, or not, for that much elsewhere, and it included rolling stock, everything. It was a real kick-starter, and if it hadn't been under construction and Docklands was still relying on the "Docklands Clipper" single-deck bus then O&Y likely wouldn't have come in the first place.Short answer, the project was sponsored by the Dept of Environment, not Transport, and was aimed at regeneration of the Isle of Dogs against a planning assumption of low-to-medium density commercial usage. And a very limited budget. £70m (if I recall) bought a light railway that was able to re-use abandoned elevated rail routes from Tower Gateway as far as Limehouse to bring costs down. What scuppered that admirable plan was the arrival of Olympia and York and the mega-project at Canary Wharf. This radically changed the traffic forecasts for the railway and meant that DLR was always playing catch-up in terms of capacity, at least until JLE came along. As an example of the chaos this created, when the signalling system was designed, it had to take account of an as-yet unbuilt station at Canary Wharf, so the train stopped there even though the station had yet to be built. Nearly 40 years on I may have some of the detail wrong and I stand to be corrected, but the essence is reasonably reliable.

The DLR serves that area of South East and East London but it'd be difficult to implement elsewhere. The Trams for example were another low cost solution to get areas which weren't served well by rail or public transport in South London connected and that wasn't too expensive because they used existing railways line with only street running in Croydon.I think a better question might be "Why haven't we built more DLRs elsewhere?"
Part of what made the DLR work was the ability to use old/abandoned railway structures, there aren't too many areas with that infrastructure available (Manchester made a tram using some of the alignments instead)I think a better question might be "Why haven't we built more DLRs elsewhere?"
Because you can't really have driverless trains unless the alignment is completely segregated, and that means you lose the ability to have any sort of on-street running.I think a better question might be "Why haven't we built more DLRs elsewhere?"
There is going to be one soon:Because you can't really have driverless trains unless the alignment is completely segregated, and that means you lose the ability to have any sort of on-street running.
SWITZERLAND: Automatic operation on the Waldenburgerbahn is scheduled to begin in September, with conversion to fully driverless operation envisaged for 2030.... Preparations for conversion of passenger-carrying services to GoA4 unattended operation are expected to begin in 2026, with commissioning planned for 2030.
DLR was also set up as a separate quasi-autonomous operation for political reasons so that it could benefit from "private free enterprise" (snigger).Why when the decided in London for the DLR (Docklands Light Railway) , rather than extend the Underground/overground ?
Re Canary Wharf, the station was built but work had started replacing it before the line even opened
I think a better question might be "Why haven't we built more DLRs elsewhere?"
That’s not my recollection. I went on it a few days in, and we stopped on the viaduct between West India Quay and Heron Quay and there was literally nothing of a station there. At least not at track level.
Why when the decided in London for the DLR (Docklands Light Railway) , rather than extend the Underground/overground ?
That’s not my recollection. I went on it a few days in, and we stopped on the viaduct between West India Quay and Heron Quay and there was literally nothing of a station there. At least not at track level.
Badly phrased on my part, the station was built and demolition had already begun for the rebuild before the line opened. I have seen a photo of the original CW station somewhere but can't remember whereThat’s not my recollection. I went on it a few days in, and we stopped on the viaduct between West India Quay and Heron Quay and there was literally nothing of a station there. At least not at track level.
At one time there was talk of trams along Mile End Road.The Jubliee Line extension was not going to happen because of the cost, so they went back to the existing infrastructure. They knew that the existing rail lines towards Tower Bridge would be used, but there was a lot of debate over where the terminus would be. Eventually the cheapest option (today's Tower Gateway) won out because it was simply the easiest to build, although there was a lot of thought to extending to Aldgate East so that the DLR trains could also run on London Underground.
The first DLR station at Canary Wharf had been fully built, what you (and I) saw on opening day was it was being dismantled again, the platforms and (some) of the shelter, I think I recall the canopy, had gone, but not the uprights, and many noticed the stairs. The rest went in the week or so following. There was actually a photo of the completed station, taken a couple of weeks beforehand, in the opening literature. Reg Ward, head of Docklands Development, used to say that the shelf life of a "current" photograph of anything in Docklands was three weeks. Given the completely modular construction style of the original DLR stations with their barrel-vault shelter roofs, it was straightforward just to unbolt them. The door release had been inhibited, that was easy, but stop for the station less so in the automatic system.Just to confirm here: there were stairs already built, but they didn't connect to the DLR, they were just stairs to nowhere. I think there might have been something at ground level too, but I'm not 100% on that. Certainly the platforms weren't built, nor the roofs, as the plan was to build it in the same way as Heron Quays originally, but it seems that they changed the plan for Canary Wharf at a relatively early stage before the station was built, as what existed on the first day of opening was nothing more than those stairs.
Um ... a somewhat well-known poster on here was there, in his new houseIt’s perhaps not understood what Docklands was like in the mid 80s. There was nothing there.
.Extending the DLR to King's Cross/St Pancras seems unlikely, where would there be capacity to put a new DLR station at King's Cross/St Pancras or elsewhere?
The first DLR station at Canary Wharf had been fully built, what you (and I) saw on opening day was it was being dismantled again, the platforms and (some) of the shelter, I think I recall the canopy, had gone, but not the uprights, and many noticed the stairs. The rest went in the week or so following. There was actually a photo of the completed station, taken a couple of weeks beforehand, in the opening literature. Reg Ward, head of Docklands Development, used to say that the shelf life of a "current" photograph of anything in Docklands was three weeks. Given the completely modular construction style of the original DLR stations with their barrel-vault shelter roofs, it was straightforward just to unbolt them. The door release had been inhibited, that was easy, but stop for the station less so in the automatic system.
Excellent history lesson there.Just to confirm here: there were stairs already built, but they didn't connect to the DLR, they were just stairs to nowhere. I think there might have been something at ground level too, but I'm not 100% on that. Certainly the platforms weren't built, nor the roofs, as the plan was to build it in the same way as Heron Quays originally, but it seems that they changed the plan for Canary Wharf at a relatively early stage before the station was built, as what existed on the first day of opening was nothing more than those stairs.
So, this is quite an interesting story in itself. The government knew as early as the mid 60s that the Docklands needed to be revitalised and that there was no future in them as commercial docks, and so as things progressed, the plan in the early to mid 70s was to use some sort of automatic people mover system to connect into the planned Fleet Line at Fenchurch Street. The infrastructure was already there (viaducts/etc), so the idea was simply to create a cheap system that would funnel people from the new housing developments into London Underground.
Then the boroughs and the Greater London Council got together and planned for some sort of light rail system that would feed into either Tower Hill or Fenchurch Street, as they correctly realised that a people mover system probably wouldn't have the capacity needed. This idea got dropped because it was simply too expensive. Then there was another plan that would just have extended the Fleet Line (now the Jubilee Line) via Fenchurch Street, Surrey Docks (which was also going to be transformed beyond recognition) towards the Isle of Dogs, North Greenwich and Woolwich Arsenal, so the light railway idea was dropped.
Thatcher came to power, and the Jubilee Line extension was dropped because it was incredibly expensive and didn't really connect anything to anything at the time. Instead, Thatcher (in one of her better moves!) created the London Docklands Development Corporation, and they tasked London Transport to come up with a budget idea for transport in the Docklands. The Jubliee Line extension was not going to happen because of the cost, so they went back to the existing infrastructure. They knew that the existing rail lines towards Tower Bridge would be used, but there was a lot of debate over where the terminus would be. Eventually the cheapest option (today's Tower Gateway) won out because it was simply the easiest to build, although there was a lot of thought to extending to Aldgate East so that the DLR trains could also run on London Underground.
Essentially, in the end, they chose the cheapest and easiest way to bring mass transport to the Docklands by using as much existing infrastructure as they could. The core idea was that it would connect the Isle of Dogs to the City, and then when it wound its way through Parliament, they realised that it made much more sense to keep the DLR separated from traffic and so the northern terminus was changed to Stratford.
It's worth pointing out that the original DLR idea from the early 1980s didn't really envisage Canary Wharf and the transformation of the area into a business district. They were expecting it to be mostly a way of getting from new housing areas towards the City, nothing more. The system was arguably never designed for heavy commuter use, which is why the system opened with just single car trains and why they needed to spend quite a bit of money on upgrading the system not long after opening.
Essentially, the DLR was never really intended to become what it is today. I'd expect it to get quite a few extensions in the next 10-20 years too, as there's a strong reason to at least extend it through to Kings Cross / St Pancras so that passengers from Euston and Kings Cross can get to the City and the Docklands on a single train.
Thanks for that! Interestingly, I found a plan of the DLR from 1984 that shows clearly that the Canary Wharf station would open 'later'. I suppose that reflects the fact that they didn't have a set plan for Canary Wharf at that time, and from what I know, the Docklands was thought to be a place for commerce rather than offices in the early 1980s. If I've got my history right, they didn't create a masterplan for the Docklands, but rather they adopted the philosophy that they would take what they could get as long as it was commercially viable.
May I ask, why would there be a need to extend to Kings Cross/Euston? These lines already connect to the Elizabeth Line at Farringdon and TCR which are a few stops further? Or are we specifically talking about traffic originating at Euston/Kings Cross (or traffic coming from the WCML/ECML)
The DLR opened in late 1987, contracts were likely not even signed in 1984. Does it show the northern branch only terminating at Mile End Underground?

Fundamentally the LDDC were "open to ideas", for example when the Billingsgate Fish Market was offered they just said Yes. There were some initial 2-3 storey apartments, and even houses, right in Canary Wharf, and a few of these are still there, now turned into minor offices. Here:
There was extensive discussion about whether it was worth it to build the DLR on the (somewhat) expensive viaduct across the docks, instead of just about 300m away round the west end of them. Key was the land value of being next to the stations and overlooking the water, bearing in mind that this was decided before high rise offices were even contemplated, and not to sterilise the land value that would be lost if it went round the edge.
In this video of them the DLR viaduct, started the following year, comes through at right angles the gap between the two larger warehouses behind the aircraft, and Heron Quays DLR is just where the camera is filming from.
A minor digression. At some point in the mid-80s, I remember visiting Greenwich Park and my father pointing at the Isle of Dogs and telling me that there'd be skyscrapers there before long. I couldn't believe it at the time - and even now I find every visit to DLR shows significant change in the areaThat's incredibly interesting, thank you for that! I didn't know that they had built apartments / houses there, and it's even more surprising that they haven't been bought up and turned into another office block. In a way, it's fortunate that the LDDC didn't end up going down the easy route of simply turning the entire area into residential and light commercial units, although I suppose that London in the early 1980s still had plenty of areas in Zone 1 for new housing.
The issue here is the system doesn't always operate in a standard manner, some elements (including currently) come and go, or only run at certain hours, and weekends can see quite a different pattern, even Woolwich to Lewisham, when other parts are closed, or even on Marathon Sunday. It's very flexible.I've always thought that the DLR should have letters for lines, as it's not such a simple network to navigate nowadays.
).The essence is correct, also (from an O&Y architect I knew) O&Y did not consider the DLR to be adequate in capacity , a cut-price railway, something of a nuisance, and would have bought out the DLR and started again.Short answer, the project was sponsored by the Dept of Environment, not Transport, and was aimed at regeneration of the Isle of Dogs against a planning assumption of low-to-medium density commercial usage. And a very limited budget. £70m (if I recall) bought a light railway that was able to re-use abandoned elevated rail routes from Tower Gateway as far as Limehouse to bring costs down. What scuppered that admirable plan was the arrival of Olympia and York and the mega-project at Canary Wharf. This radically changed the traffic forecasts for the railway and meant that DLR was always playing catch-up in terms of capacity, at least until JLE came along. As an example of the chaos this created, when the signalling system was designed, it had to take account of an as-yet unbuilt station at Canary Wharf, so the train stopped there even though the station had yet to be built. Nearly 40 years on I may have some of the detail wrong and I stand to be corrected, but the essence is reasonably reliable.