Nym
Established Member
Remember this is a country where ToCs continued ordering more Class 80x series units. Anything can happen...
There is nothing happening, if at all, in the next year. Its not even being talked about at present.Northern already sign Crewe to Stoke via Alsager and run 2 x trains that way each day, 5K45 and 5H46. They may also sign a short distance beyond Stoke for shunts. Northern also sign routes like Liverpool-Runcorn-Crewe and possibly Crewe-Warrington-Wigan.
"Northern" signing Stoke to Stafford/Rugeley wouldn't take too long, and there's plenty of traincrew available who already sign it. That is one of the benefits of GBR, you don't create artificial boundaries or problems. West Midlands Trains staff will work for the same organisation as Northern staff. It won't be a Northern service, it will be a GBR (North West and Central region) service.
Either way route and traction knowledge won't be an issue, there will be staff available who sign both.
relatively new units aren't getting cut up any time soon.Will run out of room at Wembley before much longer. The units there are all still ‘pan up’ and cut in. However if there’s not any encouraging news soon I suspect they’ll be be headed to Sims soon enough.
relatively new units aren't getting cut up any time soon.
they will be sold aboard before they are cut up.I admire your faith![]()
What other countries do you think would take them?they will be sold aboard before they are cut up.
Wires above at WembleyAny reason why they are at Wembley? Porterbrook normally use Long Marston.
no idea- i am not a business development manager for Siemens! But they are good quality trains, reliable trains They are tired inside but other wise good and from a decent "family" of units.What other countries do you think would take them?
yes, a good point well made! I don't work for them eitherSiemens BD team have nothing to do with it. It’s a Porterbrook asset…
they will be sold aboard before they are cut up.
Worked well for the Heathrow 360s.
They must be hoping for a new customer then, if they want to keep them on power.Wires above at Wembley
Class 360/2, built 2004/5, scrapped 2022.... 17/18 years old.Those were quite a lot older and more specialist.
Presumably you have not seen that European railways have lower platforms and bigger gaps between the train and the platform edge.they will be sold aboard before they are cut up.
Would also guess that gangwayed stock is less desirable than non-gangwayed in the current climate.
237 at long marstonAny reason why they are at Wembley? Porterbrook normally use Long Marston.
Why?
They must be hoping for a new customer then, if they want to keep them on power.
Why would that make gangwayed trains less desireable? A gangwayed train prevents people from sitting in the front set where the guard won't reach them.In case TOCs decide to carry out revenue protection again.
Well spotted. I read it the wrong way around!Why would that make gangwayed trains less desireable? A gangwayed train prevents people from sitting in the front set where the guard won't reach them.
If they were diesel locos they could go anywhere easily, and DMUs could probably go to another continent as HSTs have done, but UK EMUs of any power source have no real alternatives abroad.they will be sold aboard before they are cut up.
Why could you not send an Emu abroad? Apart from Platform Height and width to the train.If they were diesel locos they could go anywhere easily, and DMUs could probably go to another continent as HSTs have done, but UK EMUs of any power source have no real alternatives abroad.
Why could you not send an Emu abroad? Apart from Platform Height and width to the train.
) which basically uses Class 360s, albeit with a beefier aircon unit plonked on top and an interior using the blue moquette that the 350/1s used to have.Why could you not send an Emu abroad? Apart from Platform Height and width to the train.
The trains run on 25kv AC which a lot of countries have which is why Class 86, 87 and 92 locos have been exported abroad even though non of them had systems suitable for the countries they went toPantographs…
We are not a TSI railway
EDIT: Technical Standards for Interoperability.
Pantograph / Overhead Contact System operation is country-spesific and will likely continue to be for some time.
In addition to the country spesific protection and data logging systems, the pantograph would also need to be changed if being sent anywhere else, and then re-homogonised for that country.
Seems a lot of work for an asset that isn't *that* expensive any more.
(Not disregarding any of your points but just replying to the basic question)Why would it be "awful" if they end up scrapped?
South Africa for the Gautrain.What other countries do you think would take them?
Gautrain is an 80-kilometre (50-mile) higher-speed express commuter rail system in Gauteng, South Africa, which links Johannesburg, Pretoria, Kempton Park and O. R. Tambo International Airport. It takes 15 minutes to travel from Sandton to O. R. Tambo International Airport on the Gautrain and 35 minutes from Pretoria station to Park Station in Johannesburg. The Gautrain has 10 stations. Buses, shuttles and midibus services are available to transport passengers to and from all stations excluding the O. R. Tambo International Airport Station.