Bletchleyite
Veteran Member
That same lack of 3 seaters being fully used at peak times would pop up on the 350/2s given the 350/2s are 3+2 in Standard Class.
It's less cramped than the 323 - the sidewalls are quite thin and vertical.
That same lack of 3 seaters being fully used at peak times would pop up on the 350/2s given the 350/2s are 3+2 in Standard Class.
If the 350/2s were to go to Northern then we will see whether commuters on Northern will use the third seat in the bays at Peak Times.
It would probably be the same people who use the 3rd seat on a 323. Plus it seems to be a bolted on third seat on the 350/450s from having crawled under them to pick up an item I dropped.Even so, the idea of being sat in between two people might make people not want to take the third seat on the 350/2s.
If the 350/2s were to go to Northern then we will see whether commuters on Northern will use the third seat in the bays at Peak Times.
It would probably be the same people who use the 3rd seat on a 323. Plus it seems to be a bolted on third seat on the 350/450s from having crawled under them to pick up an item I dropped.
That is some good future proofing by Siemens, making it so the train's seating can be changed to at least 2+2 if needed.Plus it seems to be a bolted on third seat
4 roads each 350m in length could accommodate a total of 16 class 350s, or alternately 20 class 323s with no room for manoeuvre.Looks to have four roads each around 350m long so it would be possible to fit up to 34 450/2 or 323s.
There are plenty of reasons why the refresh may have been pushed back, e.g. questions over funding, quotes being higher than expected, issues with sourcing materials, decisions over the specification.As for why it has been pushed back, their are only two reasons I can think of.
In what ways will Crewe changeI think you'll find that the Crewe and Stoke "Northern" services will potentially look very different in the not too distant future, in terms of timetable, stopping pattern and origin/destination.
Although I am not sure how progressed this is on the Network Rail side of things.
There were rumours about the Stoke service being extended to Stafford and the Crewe services extended to Stoke at some point, but I'm not aware of them being anything other than rumours at the moment.In what ways will Crewe change
At the moment its hourly via Manchester Airport and hourly via Stockport
From December 2026, LNWR want to serve Manchester Airport, could this replace the Northern service. Ideally it would be complementary and quicker
Bee Network plan to take over local services in 2028 with those operating to Alderley Edge likely to be under this umbrella as well as Manchester Airport stoppers - which could impact the Crewe local services?
I assume to replace LNWR Crewe - Stoke - Stafford and not complement?There were rumours about the Stoke service being extended to Stafford and the Crewe services extended to Stoke at some point, but I'm not aware of them being anything other than rumours at the moment.
I can see Crewe to Stoke happening, all it would take is drivers being trained on the route from Crewe to Kidsgrove and then it's all fine from there.There were rumours about the Stoke service being extended to Stafford and the Crewe services extended to Stoke at some point, but I'm not aware of them being anything other than rumours at the moment.
Several Northern drivers already sign that route which should also make it easier.I can see Crewe to Stoke happening, all it would take is drivers being trained on the route from Crewe to Kidsgrove and then it's all fine from there.
Stoke-Stone Jn is 90mph PS max, Stone station itself is 25mph, the Norton Bridge flyover is 100mph, so I reckon 323s might be ok.323s only having a top speed of 90mph might become an issue south of Stoke.
Northern already sign Crewe to Stoke via Alsager and run 2 x trains that way each day, 5K45 and 5H46. They may also sign a short distance beyond Stoke for shunts. Northern also sign routes like Liverpool-Runcorn-Crewe and possibly Crewe-Warrington-Wigan.I can see Crewe to Stoke happening, all it would take is drivers being trained on the route from Crewe to Kidsgrove and then it's all fine from there.
Well assuming there is pathing space that is.
Stoke stoppers being extended to Stafford would be tricky, given Northern drivers would need a lot more route training.
As I've said before extending Stoke Stoppers to Stafford would be better served by Northern using 350/2s instead of 323s.
Given the 350/2s are already cleared to Stafford and can run at 110mph.
323s only having a top speed of 90mph might become an issue south of Stoke.
I don't know about Crewe-Warrington but I do see the occasional ECS from Warrington - Wiganpossibly Crewe-Warrington-Wigan.
I was unaware that some Northern drivers already singed Crewe to Stoke.Several Northern drivers already sign that route which should also make it easier.
== Doublepost prevention - post automatically merged: ==
Stoke-Stone Jn is 90mph PS max, Stone station itself is 25mph, the Norton Bridge flyover is 100mph, so I reckon 323s might be ok.
The use of the word ’bigger’ could imply something different altogetherIt mentions " Bigger trains on selected journeys in the North West" in December.
This is ether 350/2s, or some routes getting 4 car sprinters.
More information will be made public later this month.
It will probably be a service which is certainly a single 331 being made into a double 323.I was unaware that some Northern drivers already singed Crewe to Stoke.
323s possibly only just being ok may not be good enough for Network Rail given how busy the West Coast Mainline is.
== Doublepost prevention - post automatically merged: ==
This post was made by Alex Hornby today.
It mentions " Bigger trains on selected journeys in the North West" in December.
This is ether 350/2s, or some routes getting 4 car sprinters.
More information will be made public later this month.
Stupid me for forgetting how long the 350/2 training would take.I can't imagine them getting them into service in less than a year given the training etc required.
That would be a bit under whelming for a big announcement, but it would make sense...
It will probably be a service which is certainly a single 331 being made into a double 323.
Or a 3 coach 331 getting replaced with a 4 coach 331, hence bigger.
I figured the 769s would be heading for retirement fairly soon, and where would they be getting more sprinters from?We will just have to see what Northern announces later this month.
Though I will admit I don't expect Northern to annonce they are taking on the 350/2s in December.
This announcement will most likely be more sprinters or more 769s, but only Northern and perhaps a ROSCO know.
769s won't be retiring until phase 2 of Northern's new trains tender I would have thought.I figured the 769s would be heading for retirement fairly soon, and where would they be getting more sprinters from?
Described in the internal brief as "small but meaningful tweaks to allocations to better match available rolling stock to passenger demand" - i.e. just using existing stock better.This post was made by Alex Hornby today.
It mentions " Bigger trains on selected journeys in the North West" in December.
This is ether 350/2s, or some routes getting 4 car sprinters.
More information will be made public later this month.
It's a tweet about the wider December timetable change, not a "big announcement" about longer trains, so not sure where you got that idea from.That would be a bit under whelming for a big announcement, but it would make sense.
Thanks for that information.Described in the internal brief as "small but meaningful tweaks to allocations to better match available rolling stock to passenger demand" - i.e. just using existing stock better.
I just thought that it was underwhelming in a way given how big some of the other December timetable changes mentioned in the tweet are.It's a tweet about the wider December timetable change, not a "big announcement" about longer trains, so not sure where you got that idea from.
Will run out of room at Wembley before much longer. The units there are all still ‘pan up’ and cut in. However if there’s not any encouraging news soon I suspect they’ll be be headed to Sims soon enough.
That prospect seems so wasteful, but here we are...
Was there anything stopping the ROSCO from lowering the leasing costs on these a few years ago for WMR, rather than them ordering new 730s? It looks, from the outside, to be a rather expensive error of judgement from the ROSCO.