• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Transpennine Route Upgrade and Electrification updates

Freightmaster

Verified Rep
Joined
7 Jul 2009
Messages
4,504
Latest Sarah Bell YouTube shows track lifted in Huddersfield station.
They didn't waste any time there! o_O

Out of interest, does anyone have a track diagram for the 'interim' layout in the
Hudderfield area from October onwards?

(I've seen a few diagrams showing the proposed final layout in 2027,
but nothing which covers this Autumn's rationalisation)




MARK
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Ian Hardy

Member
Joined
18 Nov 2009
Messages
459
They didn't waste any time there! o_O

Out of interest, does anyone have a track diagram for the 'interim' layout in the
Hudderfield area from October onwards?

(I've seen a few diagrams showing the proposed final layout in 2027,
but nothing which covers this Autumn's rationalisation)




MARK
Mark,

The sixth edition of the Trackmaps Eastern (May 2025) shows the temporary layout after the rationalisation work this month on map 38.

It also shows the new Cross Gates West Crossover and the new Uppermill Junction.

https://trackmaps.co.uk/
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,640
Location
Rochdale
Copy ordered! 8-)



MARK

Mark, this link below will help. Some bed time reading for you!

Lots of links to the new layout etc

Basically phase one is the Sheffield platform which gets extended under the train shed, plus the previous P2 gets extended out and P4 is Renumbered to P3. Also the lines at the Leeds end get pushed on the new alignment over the viaduct that will eventually form the new fast lines

 

luvchocolate

Member
Joined
12 Feb 2023
Messages
8
Location
Huddersfield
During the Huddersfield blockade is there a reason why Piccadilly-Stalybridge shuttle is a 6 car 185? Surely 6 car is a bit overkill considering how many people are going to use the service unless I'm wrong.

If Huddersfield Station itself (The building) is fully closed where are passengers meant to buy tickets from? Mind you with all services being Replacements I suppose its just a case of jump on a bus/coach to wherever your going knowing there probably won't be a check although some drivers and some Co-Ordinators do check passengers have got tickets.
The ticket office is remaining open
 

YorksLad12

Established Member
Joined
5 Feb 2020
Messages
2,718
Location
Leeds
Mark, this link below will help. Some bed time reading for you!

Lots of links to the new layout etc

Basically phase one is the Sheffield platform which gets extended under the train shed, plus the previous P2 gets extended out and P4 is Renumbered to P3. Also the lines at the Leeds end get pushed on the new alignment over the viaduct that will eventually form the new fast lines

That's really useful (through the swapping between old and new numbering in the early text is a bit confusing). I hadn't realised old P1/new P2 was being extended again, and that the old P2/new P1 will once again be the beneficiary!

How long until the sandwich and coffee carts start to appear...? Pity the two pubs couldn't get platform gardens, like the York Tap has.
 

Grumpy

Established Member
Joined
8 Nov 2010
Messages
1,322
It's not wasted, it's just not in use yet.
Once it's all complete I believe the plan is for Northern to run EMUs to replace the currently Class 185 stoppers
I am sure in the longer term it will be of use. However this has essentially led to more Government borrowing. Government is currently paying approx 6% interest on new borrowing. How many years will it be till new EMU's are available? Meanwhile the interest piles up with no benefits being obtained. The same applies to such as Colton to Church Fenton-how long did that site there for no benefit (and not much now)?
There seems to be a lot of chatter on the costs of electrification but this aspect is never considered.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,671
I am sure in the longer term it will be of use. However this has essentially led to more Government borrowing. Government is currently paying approx 6% interest on new borrowing. How many years will it be till new EMU's are available? Meanwhile the interest piles up with no benefits being obtained. The same applies to such as Colton to Church Fenton-how long did that site there for no benefit (and not much now)?
There seems to be a lot of chatter on the costs of electrification but this aspect is never considered.
If that's the approach then this applies to basically any infrastructure which is ready before it's fully utilised and we would never build anything, or really bother to spend any money.

It's not like NR are off electrifying random bits of route. It's about a long term programme to upgrade the transpennine route.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,936
Location
Mold, Clwyd
It's not like NR are off electrifying random bits of route. It's about a long term programme to upgrade the transpennine route.
It's not really NR's problem, it's the TOC's.
When the government talks about quick wins, and checking the benefits achieved for the spend, it seems sorely lacking in this case.
TPE and Northern are both in direct government hands but don't seem to see any urgency to use the wires, despite EMUs being available.
It seems the same with Wigan-Bolton.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,671
It's not really NR's problem, it's the TOC's.
When the government talks about quick wins, and checking the benefits achieved for the spend, it seems sorely lacking in this case.
TPE and Northern are both in direct government hands but don't seem to see any urgency to use the wires, despite EMUs being available.
It seems the same with Wigan-Bolton.
Lack of joint up thinking that I hope GBR will at least improve... I remain to be convinced though.
 

Andyh82

Established Member
Joined
19 May 2014
Messages
4,598
Mark, this link below will help. Some bed time reading for you!

Lots of links to the new layout etc

Basically phase one is the Sheffield platform which gets extended under the train shed, plus the previous P2 gets extended out and P4 is Renumbered to P3. Also the lines at the Leeds end get pushed on the new alignment over the viaduct that will eventually form the new fast lines

I’m probably way late but I hadn’t realised there would be a platform 6 bay, I thought they were just having 4 through platforms and the penistone line

It’d be nice if the ‘space for future car park’ where the TRU compound is was started with a nice multi storey being built as soon as the site was vacated. I hope they build the extension of the subway under platform 6 to future proof an entrance at this side
 

Wyrleybart

Established Member
Joined
29 Mar 2020
Messages
2,633
Location
South Staffordshire
I am sure in the longer term it will be of use. However this has essentially led to more Government borrowing. Government is currently paying approx 6% interest on new borrowing. How many years will it be till new EMU's are available? Meanwhile the interest piles up with no benefits being obtained. The same applies to such as Colton to Church Fenton-how long did that site there for no benefit (and not much now)?
There seems to be a lot of chatter on the costs of electrification but this aspect is never considered.
Is the rolling stock actually a side issue ?
From what I understand Northern are considering their new rolling stock in three tranches, but won't they be procured by Roscos and GBR nee Northern lease from them ? The huge upfront cost will be borne by the Roscos rather than GBR nee Northern / TPE
 

LittleAH

Established Member
Joined
24 Oct 2018
Messages
1,214
It's not really NR's problem, it's the TOC's.
When the government talks about quick wins, and checking the benefits achieved for the spend, it seems sorely lacking in this case.
TPE and Northern are both in direct government hands but don't seem to see any urgency to use the wires, despite EMUs being available.
It seems the same with Wigan-Bolton.
No urgency to use the wires? Plenty of things need to be signed off to do so. Let’s take Manchester Victoria - Stalybridge: Northern did use the wires with 769s, but the 769s are awful and fail more often than they run. TPE also needed ratification to use APCO. There’s lots of hurdles and we don’t live in a world where you switch everything straight away.

FWIW, I was told Northern would be using EMUs on Stalybridge to Wigan services from December.
 

neil65

Member
Joined
15 Jul 2022
Messages
537
Location
Huddersfield, Kirklees, United Kingdom
I took some phone camera photos of the work going on at Huddersfield station involving new bridges, new platforms new track
So far everything is being ripped out as you can see in the following photos
This was day 5 of the 30 day closure
https://railway-photography.smugmug...tember-2025/Hellifield-Huddersfield/i-PmJMsb5

Everything to the left of the refurbished roof (in Blue) will be demolished to make way for new platforms
https://railway-photography.smugmug...tember-2025/Hellifield-Huddersfield/i-p5NfBRX

also 2 photos taken from a passing train was on of the new bridge across the River Calder at Ravensthorpe
https://railway-photography.smugmug...tember-2025/Hellifield-Huddersfield/i-6gSvNCK
and the new cutting at Heaton Lodge Jct
https://railway-photography.smugmug...tember-2025/Hellifield-Huddersfield/i-KpHFsN2

Neil

== Doublepost prevention - post automatically merged: ==

Overnight of the 3rd/4th September the wide spans over John William St in Huddersfield were removed
by the massive Mammoet Crane in the station compound, which can lift a massive 1,250 tons in one go
There are only 2 of these cranes in Europe and when it has finished in Huddersfield it is going to Dubai

Quite a few photos taken either side of where the bridge was
Town centre view
The other side by the Sportsman Pub

Earlier i took these from the tunnel bridge in Huddersfield, clearly showing the extending of the Sheffield line bay platform, and work going on with the platform further down

Neil
 
Last edited:

superkev

Established Member
Joined
1 Mar 2015
Messages
2,866
Location
west yorkshire
I took some phone camera photos of the work going on at Huddersfield station involving new bridges, new platforms new track
So far everything is being ripped out as you can see in the following photos
This was day 5 of the 30 day closure
https://railway-photography.smugmug...tember-2025/Hellifield-Huddersfield/i-PmJMsb5

Everything to the left of the refurbished roof (in Blue) will be demolished to make way for new platforms
https://railway-photography.smugmug...tember-2025/Hellifield-Huddersfield/i-p5NfBRX

also 2 photos taken from a passing train was on of the new bridge across the River Calder at Ravensthorpe
https://railway-photography.smugmug...tember-2025/Hellifield-Huddersfield/i-6gSvNCK
and the new cutting at Heaton Lodge Jct
https://railway-photography.smugmug...tember-2025/Hellifield-Huddersfield/i-KpHFsN2

Neil

== Doublepost prevention - post automatically merged: ==

Overnight of the 3rd/4th September the wide spans over John William St in Huddersfield were removed
by the massive Mammoet Crane in the station compound, which can lift a massive 1,250 tons in one go
There are only 2 of these cranes in Europe and when it has finished in Huddersfield it is going to Dubai

Quite a few photos taken either side of where the bridge was
Town centre view
The other side by the Sportsman Pub

Earlier i took these from the tunnel bridge in Huddersfield, clearly showing the extending of the Sheffield line bay platform, and work going on with the platform further down

Neil
Great pictures thanks.
I know there lengthening platform 1 and widening platform 2 but are they widening through island platform 4.
K
 

YorksLad12

Established Member
Joined
5 Feb 2020
Messages
2,718
Location
Leeds
Great pictures thanks.
I know there lengthening platform 1 and widening platform 2 but are they widening through island platform 4.
K
I thought they were making it slightly slimmer (and longer) on the P8 side while filling in P5 and P6.

The latest Sarah Bell video shows a lot of P1 nibbled away, I’m guessing to allow for longer Penistone Line trains.
 

hibtastic

Member
Joined
19 Oct 2014
Messages
288
During the Huddersfield blockade is there a reason why Piccadilly-Stalybridge shuttle is a 6 car 185? Surely 6 car is a bit overkill considering how many people are going to use the service unless I'm wrong.

If Huddersfield Station itself (The building) is fully closed where are passengers meant to buy tickets from? Mind you with all services being Replacements I suppose its just a case of jump on a bus/coach to wherever your going knowing there probably won't be a check although some drivers and some Co-Ordinators do check passengers have got tickets.
It was a very busy 6-car set on Tuesday night when I was on it back to Stalybridge.
 

neil65

Member
Joined
15 Jul 2022
Messages
537
Location
Huddersfield, Kirklees, United Kingdom
I thought they were making it slightly slimmer (and longer) on the P8 side while filling in P5 and P6.

The latest Sarah Bell video shows a lot of P1 nibbled away, I’m guessing to allow for longer Penistone Line trains.

i believe that is the plan, P1 nibbled away in the station, but platform to be extended at the Leeds end out onto the new bridges
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,266
Before, changes and after track plans:
Dark Grey on the "changes" plan are the changes to platforms and the final platfrom are back to light grey in the "after" image
1757057869818.png
1757057942485.png
1757058128054.png
 

nr758123

Member
Joined
3 Jun 2014
Messages
646
Location
West Yorkshire
Before, changes and after track plans:
Dark Grey on the "changes" plan are the changes to platforms and the final platfrom are back to light grey in the "after" image
Fig 4.1.3a show the island platform (currently platforms 4-8) narrowed, but then fig 4.1.4a shows it with the relocated tea rooms at its current width.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,266
Fig 4.1.3a show the island platform (currently platforms 4-8) narrowed, but then fig 4.1.4a shows it with the relocated tea rooms at its current width.
The scales aren't all the same for the three drawings, if you measure careful when taking into account that the after drawing is sized at about 89% of the before drawing, the future width is actually ~80% of the current width at the tea room area. The aim is to have gentler curvature on that platform so simple width comparison isn't that easy as the new north side doesn't have a straight parallel edge.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,205
Location
West Wiltshire
New video has been posted on you tube

Shows that the old bridge girders that spanned John William Street have at Huddersfield now been removed. Day 6 of 30 day line closure.

 

Andyh82

Established Member
Joined
19 May 2014
Messages
4,598
It’s a shame the extended Penistone Line platform means we lose the symmetry of the station. Now when you enter platform 2 (current 1) from the main building you’ll be lined up with the front carriage rather than the middle
 

Spartacus

Established Member
Joined
25 Aug 2009
Messages
3,836
It’s a shame the extended Penistone Line platform means we lose the symmetry of the station. Now when you enter platform 2 (current 1) from the main building you’ll be lined up with the front carriage rather than the middle

Well, I guess it's either do that or reopen the back bay and knock down the Head of Steam, which doesn't do much for symmetry....
 

YorksLad12

Established Member
Joined
5 Feb 2020
Messages
2,718
Location
Leeds
It’s a shame the extended Penistone Line platform means we lose the symmetry of the station. Now when you enter platform 2 (current 1) from the main building you’ll be lined up with the front carriage rather than the middle
And you'll be halfway under the roof, but at least you'll now be under cover (assuming they've closed the gap in the middle of the roof). Asymmetrical however you approach it.
 

Top