A new flow began yesterday [Thu 24/07] between Horton-in-Ribblesdale and Brindle Heath Eurofreight. A terminal that was never commissioned years ago?
That's an interesting development. Looking in the 2005 Trackmaps book for the Midland, there are separate arrival and departure lines shown connecting the loop on the down side at Agecroft (which is itself known as Brindle Heath Arrival & Departure Line) to a "proposed" freight terminal. The same connections are still in the current book, showing the white circles that normally means disconnected / out of use, but I don't think they were ever connected to anything until recently!
A report on the Network Rail website (originally done by Railtrack in 1999) relating to progress on schemes by Railtrack listed in the 1998 Network Management statement, mentions the following:
Agecroft freight terminal. The scheme to make the new Agecroft Freight Terminal operational was completed in the year along with the route gauge clearance schemes.
https://www.networkrail.co.uk/wp-content/uploads/2019/05/1999-annual-reconciliation-statement.pdf
The mention of gauge clearance and the "Eurofreight" name suggests it was originally intended to be an intermodal terminal serving Agecroft Enterprise Park, and this passage from the Wikipedia article on Agecroft Colliery suggests as much:
In the late 1990s, a business enterprise park opened on the colliery site. Much of the land remains unused. An international railfreight terminal was planned next to the Manchester to Bolton railway line but, though a spur line was built, the development did not materialise.
The new traffic / terminal is also discussed in this thread: New Rail Freight Connected Terminal At Agecroft North Jn Salford
Considering the Agecroft Terminal itself was never actually built (beyond the signalling and connection from Network Rail) I think it qualifies as a new terminal, which is a rarity. Tarmac are on the up side of the line at Pendleton (Agecroft asphalt and concrete plants with hopper discharge) but the new terminal on the down side appears to be associated with "A1 Sand and Gravel" seen on Google Maps within Agecroft Commerce Park. The quarry at Horton-in-Ribblesdale is owned by Heidelberg Materials (formerly Hanson), and on their website it says "A1 Services is now Heidelberg Materials Agecroft" dealing with building waste and also "the supply of primary and recycled aggregate."
Can't find any recent photos of the area, but things have certainly changed since this 1975 shot! There's some info on the location in the caption.
https://www.flickr.com/photos/actonwellsjunction/7379274334 (Photo: Barrie Watkins - Ivan Stewart Collection)
DCR 60046 worked loaded 6L82 Peak Forest D&C to Brandon Down Sidings yesterday [Thu 24/07], any ideas if this is a 'new' service or just a one off?
DCR have been running trains from Peak Forest to Brandon for a few years, although they might have been paused for a while. They were often recessed at Chaddesden rather than running direct. I think it normally used the same set as the Middleton Towers to Ravenhead sand train, allowing the wagons to be backloaded going north.
Edit: 6L82 did in fact run loaded, despite the wagons being shown empty in TOPS! Seen here at March behind 60046: https://www.flickr.com/photos/147797206@N02/54681654443/ (Photo: Andy Smith)
Freightliner were also running into Brandon from Tunstead, but I don't think that's run since the end of April. Stone into Brandon has always been a bit sporadic, and some has been for special projects - for example work at RAF Lakenheath: https://roryjholbrook.co.uk/news/mdig-and-rjh
This December 2021 press release from Rory J Holbrook (the company who operate the railhead) talks about DC Rail bringing in "sugar stone" from Peak which is normally a seasonal traffic:
DC Rail and East Anglian road haulier Rory J Holbrook work together to bring a new bulk flow to the railways. Even though it's a foodstuff that benefits, DCRail and Holbrook are using a terminal better known for aggregates traffic.The partners collaborate to get a key raw material for sugar production - limestone - back on the rails.
By working together, the two independent bulk haulage specialists on rail and road have designed a solution that uses rail haulage from the Peak District in the north of England to Holbrook's depot at Brandon, Suffolk. From here, the material is moved by road the final few miles to the sugar production plants. … Plans will see around 6,000 tonnes per week moving by rail
https://roryjholbrook.co.uk/news/dc-rail-success
60028 loading a 6Z29 to Brandon at Peak in July 2023: https://www.flickr.com/photos/64657021@N07/53081402892/ (Photo: Stephen Stubbs)
60029 with a 6Z28 from Peak to Brandon in April 2023: https://www.flickr.com/photos/132139568@N08/52795945790/
60028 in the terminal at Brandon in June 2022: https://www.flickr.com/photos/tibshelf/52148380607/ (Photo: Keith Partlow)
56098 en route to Brandon from Chaddesden in January 2024: https://www.flickr.com/photos/121100974@N07/53497655801/ (Photo: 87027)
70002 worked the first Llan Jct to Hope Earles sidings on Saturday morning [26/07]. 6H67 ran via Crewe, Stoke, Derby and Chesterfield. From the rail freight desert of North Wales I hope it's the first of many more.
That's good to hear. I found the Freightliner press release for the Breedon contract interesting, mentioning materials to Earles from both Llandudno Junction and also Drax:
This contract, an extension of the longstanding agreement between Breedon and Freightliner, in place for over 25 years, covers the transport of cement from Hope Cement Works to distribution sites across the UK, including Dagenham, Theale, Dewsbury and Walsall. In addition to these flows, the recently renewed contract also includes the movement of Alternative Raw Materials (ARM) – delivering materials from Llandudno and Drax Power Station into the cement works.
https://www.freightliner.co.uk/news...t-and-aggregate-contracts-with-breedon-group/
Slate waste is described as a "pozzolanic additive" to cement, and fly ash from Drax to Earles was previously railed in PCA wagons by Freightliner for use as a "supplementary cementious material" - replacing a percentage of the cement used in concrete.
Interesting shot of 70015 inside Drax with PCAs in 2019: https://www.flickr.com/photos/dbs60100/49060467827/ (Photo: DBS 60100)
Although fly ash is no longer produced at Drax after the end of coal-firing there, there is still a large amount on site to be recovered from the "Barlow Mound." I think this material is currently railed down to Appleford for use in the manufacture of "Aircrete" blocks by Forterra at Newbury but there's plenty to go around!
Power Minerals are involved with extracting material from the Barlow Mound at Drax for use in cement:
https://www.eppowerminerals.com/en/...t-project-in-the-history-of-ep-power-minerals
This part of the Wikipedia article on Hope Cement Works mentions both slate waste and PFA (a.k.a. fly ash):
Hope Cement lodged an application to increase the amount of raw materials railed into the site. Part of the manufacturing process of cement uses pulverised fuel ash (PFA) a by-product of burning coal in power stations. As this industry went into a sharp decline from 2015 onwards, alternative raw materials (ARM), such as slate quarry fines, marl, fireclay etc., could be used instead. However, ARMs typically have a higher moisture content, which is driven off in the roasting part of the cement making, and thus requires a higher tonnage of material than PFA. The application requires about 250,000 tonnes (280,000 tons) to be imported into the site per year.
Link to a previous thread on the slate waste traffic for anyone interested:
https://www.railforums.co.uk/threads/n-wales-slate-waste-export-by-rail.276419/