• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Class 175s to GWR

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

REVUpminster

Established Member
Joined
3 Jan 2021
Messages
1,265
Location
Paignton
Surely something has got to move out of Wolverton to Laira.

I am only guessing but I suppose the 175s don't hold much, if any, fuel in the tanks while in storage at Ely or in the shed at Wolverton for safety reasons.
 

BillStampy

Established Member
Joined
6 Jan 2024
Messages
1,592
Location
Llanharan
Think at this point we shall await the first unit to come out of Wolverton with the modifications made, only a matter of time I'd hope!

== Doublepost prevention - post automatically merged: ==


What I assume is going to turn into a 175 movement from Ely, 5L46 Derby - Ely
 
Last edited:

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,458
Location
Taunton or Kent
Think at this point we shall await the first unit to come out of Wolverton with the modifications made, only a matter of time I'd hope!

== Doublepost prevention - post automatically merged: ==


What I assume is going to turn into a 175 movement from Ely, 5L46 Derby - Ely
There is a Wolverton drag tomorrow, however that loco move from Derby hasn't departed yet, so unless it's just extremely late, I'm willing to bet this will be cancelled:

 

185143

Established Member
Joined
3 Mar 2013
Messages
5,350
Surely something has got to move out of Wolverton to Laira.

I am only guessing but I suppose the 175s don't hold much, if any, fuel in the tanks while in storage at Ely or in the shed at Wolverton for safety reasons.
They're flammable enough without adding fuel to them!:D
 

BillStampy

Established Member
Joined
6 Jan 2024
Messages
1,592
Location
Llanharan

Similar story to the first week of training, a 175 is expected to do some runs between Plymouth and Newton Abbot from Monday to Friday next week. ROG operating.
 

davetheguard

Established Member
Joined
10 Apr 2013
Messages
1,939
Are 175s fitted with Selective Door Opening (SDO), or can one door be opened on local control?

This has particular importance at Newton St. Cyres station where most of the platform is very low, and the Guard opens one door only positioned next to the Harrington Hump raised section.

Although most trains to Okehampton & Barnstaple don't call here, the station enjoys improving services with the excellent Beer Engine brewpub adjacent being a particular draw.
Between 15 & 22 trains in total a day now stop here on request, depending on the day of the week.

Raising the whole platform length instead of SDO would probably be unaffordable.
 

tfw756rider

On Moderation
Joined
30 Nov 2024
Messages
1,957
Location
Wales (sometimes in England), thanks for replying!
Are 175s fitted with Selective Door Opening (SDO), or can one door be opened on local control?

This has particular importance at Newton St. Cyres station where most of the platform is very low, and the Guard opens one door only positioned next to the Harrington Hump raised section.

Although most trains to Okehampton & Barnstaple don't call here, the station enjoys improving services with the excellent Beer Engine brewpub adjacent being a particular draw.
Between 15 & 22 trains in total a day now stop here on request, depending on the day of the week.

Raising the whole platform length instead of SDO would probably be unaffordable.
They only had TUDI (Trailing Unit Door Isolation), but apparently SDO is being retrofitted at Wolverton if I remember correctly.

== Doublepost prevention - post automatically merged: ==


Similar story to the first week of training, a 175 is expected to do some runs between Plymouth and Newton Abbot from Monday to Friday next week. ROG operating.
Many thanks for that :) Does anyone in here know which 175 will be used?
 
Last edited:

BillStampy

Established Member
Joined
6 Jan 2024
Messages
1,592
Location
Llanharan
Ah thanks, I probably won't bother going over again unless/until a 175/1 is used.
Probably will be a similar story for me, I do want to catch one moving under it's own power again whilst it's still in TfW's white and red like I'm used to, since going all the way from South Wales to Plymouth is both costly and far so I want to use my time and money wisely!
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,108
Location
West Wiltshire
This has particular importance at Newton St. Cyres station where most of the platform is very low, and the Guard opens one door only positioned next to the Harrington Hump raised section.

Raising the whole platform length instead of SDO would probably be unaffordable.
If there are no buildings to adjust floor height, and solid underneath, not as expensive as might think to raise the surface.

These days there are interlocking aerated blocks available, even easy than laying a row of bricks to install. Then just need precast surface blocks which can be moved into place with small tracked hoist or crane of a road railer. Then it is just backfill and surfacing.

Clearly if it's possible to build a hump, then it's possible to use same access for whole length of platform
 

Top