It means doing the minimum to get it back going at the minimum cost in railway terms. Which this forum seems very quick to advocate in most cases.
Fair enough.
I still think the increased cost of sending engineers trains via Carnforth would be a lot less in value than the benefit of having a shorter blockade enabling Whitehaven to remain open.