Closure of Bransty Tunnel (near Whitehaven) expected until further notice

Status
Not open for further replies.

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,575
Location
Preston Lancs
I suspect it’s the source that is the ‘mystery’, not the contents of the liquid, which could be easily determined in a few days via lab testing which I assume they will have done early on. Again, poor wording in the article.
A few minutes in my lab. X Ray fluorescence or Atomic Absorption spectroscopy would give an answer very quickly indeed.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

P156KWJ

Established Member
Joined
26 Nov 2007
Messages
4,226
Location
Nottinghamshire
Those who use the Cumbrian Coast line may already be aware some Engineering Works overran at the weekend, with an extra couple of days being allowed for further work to be carried out.

A reliable source of information says that this investigatory work has now concluded, and Whitehaven Tunnel is now unsuitable for rail traffic due to severe voids and poor rock formation.

At this early stage, a timescale of 2-3 months has been given for remedial work to be carried out before trains can run again.
 

Mcr Warrior

Veteran Member
Joined
8 Jan 2009
Messages
17,329
Currently nothing running between Workington and Sellafield. Rail replacement buses operating today between these two stations.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,396
Is this the tunnel that has been (somewhat famously) draining discoloured water into the harbour for years?
 

Mcr Warrior

Veteran Member
Joined
8 Jan 2009
Messages
17,329
Is this the tunnel that has been (somewhat famously) draining discoloured water into the harbour for years?
Yes, believe so. Been draining orangey-brown coloured water into Whitehaven Harbour via a drainage culvert since November 2022. Iron ochre is thought to be the likely contaminant in the area.
 

Freightmaster

Verified Rep
Joined
7 Jul 2009
Messages
4,530
Yes, believe so. Been draining orangey-brown coloured water into Whitehaven Harbour via a drainage culvert since November 2022. Iron ochre is thought to be the likely contaminant in the area.

Some more info here:






MARK
 
Last edited:

Cowley

Forum Staff
Staff Member
Global Moderator
Joined
15 Apr 2016
Messages
18,966
Location
Devon
Just to provide an update. The line was closed last weekend for prep work prior to a three week closure in September, but the engineering works are overrunning

Overrunning engineering works between St Bees and Parton means all lines are blocked. As a result, buses will replace trains between Sellafield and Workington.

Disruption is expected until the end of the day on Friday 1 August.

Customer advice:

Replacement buses are currently running between Sellafield and Workington.

Please see station information posters for the location of bus pick up points.

Journey times may be extended by up to 60 minutes whilst travelling by road transport.

Train services between Lancaster / Barrow-in-Furness and Carlisle will terminate at Sellafield and restart between Workington and Carlisle.
 

P156KWJ

Established Member
Joined
26 Nov 2007
Messages
4,226
Location
Nottinghamshire
Just to provide an update. The line was closed last weekend for prep work prior to a three week closure in September, but the engineering works are overrunning

Far further than tomorrow for bustitution now

 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,364
Location
Bolton
I see Network Rail have posted a press release:

Surveys result in closure of railway between Whitehaven and Corkicle

Cumbrian Coast Line passengers are being advised the railway between Whitehaven and Corkicle will remain closed after recent surveys.

Network Rail has been working inside Bransty Tunnel for the last five days carrying out assessments ahead of a full track and drainage renewal in August and September.

It involved doing tests to assess any weight limits needed for the heavy plant and machinery needed for the planned renewals.

However, those tests have uncovered some areas under the railway which need strengthening before any work can progress.

 

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,910
Northern JourneyCheck is now advising that disruption is expected until November.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,396
Discoloured water flowing out of the tunnel drainage system and now talk of voids and poor rock formations certainly paints a picture.
Not a particularly optimistic picture at that.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,442
Location
Yorks
Given how long the blockade is likely to be, you'd hope that they'll be able to get a bit closer than Workington and Sellafield (particularly given that Whitehaven itself has a bay platform from the North).

Could they get trains from the South as near as Corkickle ?
 

King Lazy

Member
Joined
24 Apr 2019
Messages
159
Should be easy enough to do in theory. They’d just have to change ends and return to St Bees.

Likewise Whitehaven would be useable on both bay and through platform as there is a signal before the tunnel.

But, there may be an issue in that the engineers may need access to the tunnel with large equipment which could rule out Corkickle and Whitehaven through platform depending on the possession limits.

And I’m not sure a risk assessment would be happy with just a signal preventing a train entering the tunnel while work is ongoing. Perhaps like when the Kent Viaduct was done a temporary buffer could be provided as happened at Arnside but that job had a much longer planning time.

Sellafield has a fully bi-directionally signalled platform which makes it ideal for terminating. St Bees doesn’t but a temporary method of work should be possible to put in. And if replacement transport is used Sellafield is likely better set up for numerous buses/coaches.

I’d imagine Sellafield and Workington have been used up to now to aid diagramming as Workington is the traincrew base and as it’s easy to terminate at Sellafield due to the signalling. Even a 20 min run to Whitehaven and 20 mins back plus turnaround could mess with a Traincrew diagram and breaks.

But now it’s known it’s going to be a bigger job perhaps planning for a longer issue could be easier depending on the possession limits and complexity of the tunnel work?
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,442
Location
Yorks
Should be easy enough to do in theory. They’d just have to change ends and return to St Bees.

Likewise Whitehaven would be useable on both bay and through platform as there is a signal before the tunnel.

But, there may be an issue in that the engineers may need access to the tunnel with large equipment which could rule out Corkickle and Whitehaven through platform depending on the possession limits.

And I’m not sure a risk assessment would be happy with just a signal preventing a train entering the tunnel while work is ongoing. Perhaps like when the Kent Viaduct was done a temporary buffer could be provided as happened at Arnside but that job had a much longer planning time.

Sellafield has a fully bi-directionally signalled platform which makes it ideal for terminating. St Bees doesn’t but a temporary method of work should be possible to put in. And if replacement transport is used Sellafield is likely better set up for numerous buses/coaches.

I’d imagine Sellafield and Workington have been used up to now to aid diagramming as Workington is the traincrew base and as it’s easy to terminate at Sellafield due to the signalling. Even a 20 min run to Whitehaven and 20 mins back plus turnaround could mess with a Traincrew diagram and breaks.

But now it’s known it’s going to be a bigger job perhaps planning for a longer issue could be easier depending on the possession limits and complexity of the tunnel work?

Yes, St Bees to Whitehaven would probably be the next best option in that case, with temporary buffers protecting the Whitehaven end. At least they've got time to plan it well.
 

Straus

Member
Joined
20 Jun 2025
Messages
122
Location
Manchester
Looking at maps available through the mining remediation authority it appears there are several coal seams intersecting the tunnel beneath ground - there was extensive working in the area, I'd assume it's a collapsed historic mine. If so, 3 months is a very optimistic turnaround.

1753949827617.png
 

Watershed

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
26 Sep 2020
Messages
16,823
Location
UK
You clearly cannot use BY4 which is at the tunnel mouth at Whitehaven as protection as its too close. Next signal back is prior to the station, the bay would be too close as well to use for that reason.
That doesn't make sense, why couldn't the points be clipped and scotched in the direction of the bay?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,749
That doesn't make sense, why couldn't the points be clipped and scotched in the direction of the bay?
Still too close to the possession limits. It will have been risked assessed and I would imagine Northern have asked the same questions. You are assuming there won't be any engineering trains sat outside, as they would come from Kingmoor as a SCO depot.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,442
Location
Yorks
Still too close to the possession limits. It will have been risked assessed and I would imagine Northern have asked the same questions. You are assuming there won't be any engineering trains sat outside, as they would come from Kingmoor as a SCO depot.

Still, wouldn't it be better for them to come from the South direction, so that there doesn't have to be a lot of activity at Whitehaven station.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,749
Still, wouldn't it be better for them to come from the South direction, so that there doesn't have to be a lot of activity at Whitehaven station.
Even if a train isnt sat there, the station is still going to be within the possession limits. Its too close to the tunnel.
 

Gloster

Veteran Member
Joined
4 Sep 2020
Messages
13,060
Location
Up the creek
Supposedly, Workington is being used because the car parking and bus turning facilities are better. Additionally, although with the way the railway puts its own convenience above that of passengers’ nowadays it might be the main reason, it simplifies things as the crews are based there. St Bees doesn’t look as though it has space to handle anything larger than a minibus.
 

OhNoAPacer

Member
Joined
11 Mar 2013
Messages
726
Location
Egremont Cumbria / Northampton
Then you are feeding the block from the south end only which will add cost. As noted above, getting a coach in the station car park doesnt look that easy.
If you closed the car park then it would be easy peasy, you could even just take out of use all but the disabled spaces and still be able to get a coach in.
That said it sounds as if not running to Whitehaven is about a lot more than just coach access.
What I do think is that Northern should be explaining to people why they can't terminate at Whitehaven and Corkickle, otherwise the general populace will think it is because they can't be bothered, or for the more shoulder balanced chip brigade that it just another Workington v Whitehaven thing.
 