Shunted into The Pictures siding within the depot.I can’t imagine they would do testing during traffic hours… when you say “left the depot” do you mean it just moved to an outside siding?
Shunted into The Pictures siding within the depot.I can’t imagine they would do testing during traffic hours… when you say “left the depot” do you mean it just moved to an outside siding?
That’s sounds interesting! Although possibly they’d be better with a full size mockup to display, showing the cab and the passenger area.Are there any OO gauge in the planning? Apparently the station manager at Hatton Cross wants one in time for the first service to Heathrow.
I can see them running it in the sections which have no issues while they wait for the other sections to be fixed as otherwise by not running it your basically are putting it in store and trains don't like being in store.Can't imagine this unit will be run on the mainline much until it's clearance issues have been resolved.
Perhaps a few nighttime runs on the South Ealing test track & the obvious non passenger hours trip back to Ruislip.
I would hope the 2nd unit (now at Ruislip) has had the mods & therefore is the one to be used for testing.
Perhaps Engineering hours will be cancelled one night to do a swop (this needs advance booking in the access publications)
Not upon resignalling for 4LM, but signal immunisation for 2024 Stock to run. They generate a different frequency than legacy Stock.Does running to Rayners Lane/Uxbridge depend on that area being re-signalled as part of the Met upgrade? Meaning that we will have 24ts for Heathrow and 73ts for Uxbridge services initially?
Both Piccadilly Stock will be able to run to Uxbridge, in legacy and CBTC overlay.Will LU need to get rid of the 73ts before switching over to CBTC on the Uxbridge branch? If this is the case, how will this be managed if the 24ts cannot run under legacy signalling but the 73s have to go before the switchover?
Meaning that we will have 24ts for Heathrow and 73ts for Uxbridge services initially?
They do, but scans only work in straight lines (a curve is broken down into a series of sometimes extremely short straight lines) and dynamic behaviour isn't always exactly as predicted.
Any references to reformations are, initially, a red herring. Either way - that’s simply not how service management works during disruption.It's unrelated to this reason, but I believe the initial plan is (or was last I heard) to enter them into service on the Northfields to Arnos Grove non-core services first when they're introduced, as this will enable train operators who have gone through the necessary stock training to run the one service pattern. This makes it much easier when reforming the service (swapping train numbers and drivers during late running for example) as it'll be much less likely to end in a scenario where a reform can't take place as one of the operators isn't trained on the new stock. It'll also make enabling training a lot easier.
This may change by the time it comes to actually introduce them though, or may have changed already.
They won’t get reformed - they’ll be the first to get cancelled
Any references to reformations are, initially, a red herring. Either way
38001-48001 successfully completed an empty test run Northfields depot-Hyde Park Corner and return this morning.
Isn’t full scale production going to be delayed at least until the testing is completed, TFL gives detailed feedback to Siemens and it then introduces potential improvements to the train design?Does anyone know if the delay to introduction also affects the production timeline, or will it mean that there are plenty of spare new units to introduce once the first one has come in (and drivers have been trained up)
Great photo!View attachment 185062
(Image shows a 24 Stock running westbound through Chiswick Park with dawn breaking.)
Yes, 001 is out, currently at Earl's Court, eastbound.Testing of the 2024 Stock is alleged to take place either today or tomorrow during the Piccadilly’s engineering possession between King’s Cross and Osterley/Uxbridge.
Isn’t full scale production going to be delayed at least until the testing is completed, TFL gives detailed feedback to Siemens and it then introduces potential improvements to the train design?
Is it still out on test?Yes, 001 is out, currently at Earl's Court, eastbound.
Currently Gloucester RdIs it still out on test?
Thanks - Which direction?Currently Gloucester Rd