2024 Tube Stock (Siemens Inspiro London)

Mawkie

Established Member
Joined
17 Feb 2016
Messages
1,261
The good folks of Reddit have apparently spotted another 24 Stock (38004) coming through Sevenoaks this morning.
Screenshot_2025-07-03-08-43-11-73_46f2bef6fa34f07311347e7f027a4aa9.jpg
(24 Stock 38004 being hauled through Sevenoaks)

A contributor suggested this path from RTT:


(Obviously, being Reddit, I can't guarantee the veracity of the information.)
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

800001

Established Member
Joined
24 Oct 2015
Messages
7,347
The good folks of Reddit have apparently spotted another 24 Stock (38004) coming through Sevenoaks this morning.
View attachment 183026
(24 Stock 38004 being hauled through Sevenoaks)

A contributor suggested this path from RTT:


(Obviously, being Reddit, I can't guarantee the veracity of the information.)
Then works this to Goole

 

thomalex

Member
Joined
25 Aug 2021
Messages
531
Location
Leeds
Curious where all these are going to be parked up as more arrive as presumably you'll have a cross over period where all the 73 stock and the 24 stock are having to be stabled. Or will we see a halt to new deliveries until the 73s are able to be taken out of service and it’s one in one out?
 

Thirteen

Established Member
Joined
3 Oct 2021
Messages
1,897
Location
London
Curious where all these are going to be parked up as more arrive as presumably you'll have a cross over period where all the 73 stock and the 24 stock are having to be stabled. Or will we see a halt to new deliveries until the 73s are able to be taken out of service and it’s one in one out?
The building process has already being slowed down for financial reasons, I imagine the 2024 stock from Vienna will come first then the ones from Goole in due course.
 

bluegoblin7

Established Member
Joined
10 May 2011
Messages
2,133
Location
JB
Correct, second set to the UK and the first to go to Goole - it is likely that all deliveries from Vienna will now go to Goole first for modification works.
Edit: duff gen. The temporary move to Goole was due to Ruislip being unable to accommodate the unit when first delivered.

Suppose we better start a fancy list of where everything is:

Unit No.Delivered to UKDelivered to London Underground
3800115/10/2024 (to Ruislip depot)15/10/2024 (to Ruislip depot)
01/04/2025 (to Northfields depot)
3800403/07/2025 (to Goole)17/07/2025 (to Ruislip depot)
03/09/2025 (to Northfields depot)
3803011/09/2025 (to Ruislip depot)11/09/2025 (to Ruislip depot)
23/09/2025 (to Northfields depot)
 
Last edited:

AM9

Veteran Member
Joined
13 May 2014
Messages
16,029
Location
St Albans
Correct, second set to the UK and the first to go to Goole - it is likely that all deliveries from Vienna will now go to Goole first for modification works.

Suppose we better start a fancy list of where everything is:

Unit No.Delivered to UKDelivered to London Underground
3800115/10/2024 (to Ruislip depot)15/10/2024 (to Ruislip depot)
01/04/2025 (to Northfields depot)
3800403/07/2025 (to Goole)
It seems that the mainstream local news has picked up on the delay issue, - asking the usual journo's question, who is to blame for the loading/structure gauge incompatibility. Surely this is actually known within TfL so somebody will need to speak up soon.
 

MDB1images

Member
Joined
9 Jun 2018
Messages
682
The good folks of Reddit have apparently spotted another 24 Stock (38004) coming through Sevenoaks this morning.
View attachment 183026
(24 Stock 38004 being hauled through Sevenoaks)

A contributor suggested this path from RTT:


(Obviously, being Reddit, I can't guarantee the veracity of the information.)
Very long shot, but don't suppose anyone knows when it left Vienna?
 

bluegoblin7

Established Member
Joined
10 May 2011
Messages
2,133
Location
JB
It seems that the mainstream local news has picked up on the delay issue, - asking the usual journo's question, who is to blame for the loading/structure gauge incompatibility. Surely this is actually known within TfL so somebody will need to speak up soon.
TfL issued a press release on the delay a week or so ago, so I don’t think anything else will be forthcoming.

The issues are known and are not uncommon for any new rolling stock. I’m being particularly vague with my wording for obvious reasons (for those unaware I work for TfL and get to know a lot about things like this through my TU role) but I also wouldn’t read anything more into the situation than what has been placed in the official statements. Local, third party news is often wrong, and often tipped off by misinformed internal sources. Whether that (fully) applies here I won’t be drawn to, but it has certainly applied to many railway stories over the years
 

Thirteen

Established Member
Joined
3 Oct 2021
Messages
1,897
Location
London
TBH it's rare for new rolling stock to work perfectly first time round, that's why testing and snagging has to be done.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,347
TBH it's rare for new rolling stock to work perfectly first time round, that's why testing and snagging has to be done.
But surely the gauge of the train shoud fit the network it is designed to work on?
 

JamesT

Established Member
Joined
25 Feb 2015
Messages
4,857

GFE

Member
Joined
6 Jun 2024
Messages
132
Location
HA4
The 24 stock uses a new principle of some cars not having wheels/bogies; with them being supported by couplings on the adjacent cars.
As explained in the lecture by an LUL Track Engineer to the PWI (which was on YouTube but now apparently removed), These couplings become the "pivot points" defining the kinematic envelope of the bogieless car, and the existing/established train gauge kinematic envelope modelling tools did not cater for this feature.
Also the TFL explanation of the problem/delay said the problem related to to the positioning of some equipment (and therefore gauging) under the train perhaps getting too close to traction rails or other equipment mounted on the track.
 

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
17,832
Location
Epsom
Was that a shortfall in the infrastructure data records, or arising from an expansion in the trains' expanded deployment, beyond that used to generate the stock's original planned deployment?
What happened, apparently, was the SNCF had previously been refused the funding to improve the stations in question.

They did get approval for the new trains.

Lo and behold, it was "discovered" after the trains were built that all those stations needed modifications to allow those trains to run...

That may or may not be true, but it's certainly the story that was circulating at the time, and it's quite believable.

Back in London, it is well documented that the first batch of 1983 Stock had to be returned for adjustment because they were "too wide for the tunnels"; it was a matter of 5mm or so each side and was apparently solved by simply tightening up the bodyshells to draw them in slightly.
 

Mcq

Member
Joined
24 May 2019
Messages
410
In the regrettably withdrawn video lecture by the LUL Track Engineer to the PWI - can anyone confirm that the lecturer said that the clearance tolerance between the fixed tunnel impedimenta and the tube train envelope was 1"?
 

thomalex

Member
Joined
25 Aug 2021
Messages
531
Location
Leeds
In this day and age I'm amazed you can't do LIDAR scans to build up detailed models of all the tunnels, stations and track and run simulations to iron out these things before anything is even built
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,523
Location
Northampton
In this day and age I'm amazed you can't do LIDAR scans to build up detailed models of all the tunnels, stations and track and run simulations to iron out these things before anything is even built
They do, but scans only work in straight lines (a curve is broken down into a series of sometimes extremely short straight lines) and dynamic behaviour isn't always exactly as predicted.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,115
Location
West Wiltshire
The fact the 2024 stock has been seen being tested at Ealing Common suggests it's not a gauge issue.
The subject was raised at a London Assembly meeting few days ago, but the boss of TfL refused to give the reasons during the meeting with a camera, but offered to give them in private off record, verbally and with no record, afterwards, as he said he knew them.

Rather smacks of a cover up, protecting incompetence, and embarrassment, especially as the reason for not disclosing was apparently not pending legal dispute or contractual dispute.

For clarity, I haven't seen the meeting, just a snippet that was on a news item, so cannot confirm.
 

BerkshireRails

On Moderation
Joined
4 Apr 2021
Messages
889
Location
United Kingdom
In the regrettably withdrawn video lecture by the LUL Track Engineer to the PWI - can anyone confirm that the lecturer said that the clearance tolerance between the fixed tunnel impedimenta and the tube train envelope was 1"?
They say in the PWI video that there was a 1 inch/25mm gap.
 

Dstock7080

Established Member
Joined
17 Feb 2010
Messages
3,515
Location
West London
38004-48004 now successfully moved from Goole to Ruislip depot.

== Doublepost prevention - post automatically merged: ==

a look inside Siemens Goole:

 
Last edited:

Mawkie

Established Member
Joined
17 Feb 2016
Messages
1,261
The 24 stock has left Northfields depot maybe their preparing for live testing on the network.
Oh yeah I forgot to post. Apparently doing a run through the tunnels tonight. Didn't imagine it would be during traffic hours. (TBH I didn't believe it was happening at all! Lol)
 