Progress on Avanti West Coast's 805/807s Hitachi AT300 sets

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Mogz

On Moderation
Joined
20 May 2019
Messages
636
Reading the latest issue of Rail Express and it states ‘The seven car EMU (807) were ordered for the Euston to Liverpool Line Street route, while they will operate on that routes the planned two trains per hour between the cities has been shelved’.
So a reduction from 9-11 car trains to 7 car for Liverpool but with no increase in frequency?

What was intended to be an increase to 14 carriages per hour will be a reduction to 7.

Another example of “pack them in to save money”, no doubt!
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,346
Location
Glasgow
So a reduction from 9-11 car trains to 7 car for Liverpool but with no increase in frequency?

What was intended to be an increase to 14 carriages per hour will be a reduction to 7.

Another example of “pack them in to save money”, no doubt!
The intention was one 807 and one 390 each per hour.

The 807s also have comparable capacity to a 9-car Pendolino, they actually have more Standard Class seats than a 390/0.
 

AJDesiro

Member
Joined
10 May 2019
Messages
929
Location
Rugby
So a reduction from 9-11 car trains to 7 car for Liverpool but with no increase in frequency?

What was intended to be an increase to 14 carriages per hour will be a reduction to 7.

Another example of “pack them in to save money”, no doubt!
A 7 car has 40 more standard class seats than a 9 car 390 anyway, despite their lower density interior. The original plan was to have 1tph 807 and 1tph 390, not 2tph 807.
 

Mogz

On Moderation
Joined
20 May 2019
Messages
636
A 7 car has 40 more standard class seats than a 9 car 390 anyway, despite their lower density interior. The original plan was to have 1tph 807 and 1tph 390, not 2tph 807.
Ah! I see. Of course! There’s a considerable portion of the end cars of a Pendolino that don’t have any seats- not the case with an 807.

Good to see that they have also resolved the issue of over provision of First Class seating and under-provision of Standard.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,951
Location
Mold, Clwyd
The Echo piece quotes Avanti as saying 10 more Liverpool services a week from December, and 30 more from May.
Not clear how that breaks down daily, or how many will be 807s.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,346
Location
Glasgow
The Echo piece quotes Avanti as saying 10 more Liverpool services a week from December, and 30 more from May.
Not clear how that breaks down daily, or how many will be 807s.
2 per day Mon-Fri, been in RTT for a while to view:

1307 and 1602 fron Euston
0902 and 1004 from Liverpool

Should be all 390s.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,346
Location
Glasgow
When does this become a full service ?
Well the railway media claimed it had been 'shelved', but as we've seen - there are two extras in December then another three from May.

Perhaps they might achieve December 2025 for the full hourly second service?

Assuming that is still planned and not simply some extra workings at busy times or something.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,840
Location
Croydon
The Echo piece quotes Avanti as saying 10 more Liverpool services a week from December, and 30 more from May.
Not clear how that breaks down daily, or how many will be 807s.
30 more services to Liverpool from May cannot be right ?. That sounds like better then half hourly for all of the core day ?.

I notice 807001 only got as far South as Stafford this morning on 1A99

Which 807s are so far accepted for passenger service ?.
 

peter166

Member
Joined
15 Mar 2010
Messages
249
Location
NW
Seems odd that 1A99 0901 (from Lime Street ito Euston) is overtaken by1G46 0908 (from Lime Street to Birmingham) between Wavertree Jct. & Runcon?
1A99 due to arrive Runcorn 0932 (31 mins) whereas 1G46 arrives 0925 (17 mins).
 

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,845
Location
SW London
Seems odd that 1A99 0901 (from Lime Street ito Euston) is overtaken by1G46 0908 (from Lime Street to Birmingham) between Wavertree Jct. & Runcon?
1A99 due to arrive Runcorn 0932 (31 mins) whereas 1G46 arrives 0925 (17 mins).
Even odder is that 1G46 calls, but 1A99 does not, at Liverpool South Parkway

Looking at the schedules on RTT, 1A99 takes 10 minutes for the four miles between Speke Junction and Ditton Junction (c 24 mph pass to pass), whereas 1G46 takes three minutes (c 80 mph).
 

Class15

Established Member
Joined
30 Dec 2021
Messages
4,193
Location
North London or Mildmay line
Its an additional service, I wonder if the contingency plans for a blocked route via Rugeley don't consider its existence?
That’s entirely possible. If so hopefully it can be updated soon.

Apologies if this has already been stated, but are 807s cleared Stafford - Bushbury - Bescot - Aston - Stechford?
 

DaveyJones

Member
Joined
12 Mar 2023
Messages
224
Location
UK
That’s entirely possible. If so hopefully it can be updated soon.

Apologies if this has already been stated, but are 807s cleared Stafford - Bushbury - Bescot - Aston - Stechford?
1R00 ran (most of) that way yesterday formed of an 807 (Edit for RTT link)

 

Sorcerer

Established Member
Joined
20 May 2022
Messages
2,222
Location
Liverpool
I had no idea that 807s had started running and even reached Liverpool Lime Street. I do hope this doesn't come at the expense of the Pendolinos though because I have far too much love and nostalgia for them to accept the Evero replacing them on any number of services! But then of course if nostalgia dictated railway policy we'd still be having steam engines running up and down the West Coast Main Line.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,840
Location
Croydon
Its an additional service, I wonder if the contingency plans for a blocked route via Rugeley don't consider its existence?
Most likely the alternative route(s) cannot take everything on top of the normal services for the alternative route so some things will have to be cancelled. The first casualties will be odd one out services like additional services and any that require special crewing arrangements (I doubt many Avanti drivers are passed on 807s yet so risk that the 807 would be stuck at Euston waiting for precisely the right driver).
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,888
Location
"Marston Vale mafia"
I had no idea that 807s had started running and even reached Liverpool Lime Street. I do hope this doesn't come at the expense of the Pendolinos though because I have far too much love and nostalgia for them to accept the Evero replacing them on any number of services! But then of course if nostalgia dictated railway policy we'd still be having steam engines running up and down the West Coast Main Line.

The idea is that in a given hour the 807 replaces the existing service (which is pathed 807, you might have noticed that it feels a bit slow compared to usual on those services in a Pendolino) and a second (faster) service with a Pendolino is added.
 

Sorcerer

Established Member
Joined
20 May 2022
Messages
2,222
Location
Liverpool
The idea is that in a given hour the 807 replaces the existing service (which is pathed 807, you might have noticed that it feels a bit slow compared to usual on those services in a Pendolino) and a second (faster) service with a Pendolino is added.
I was under the impression these plans were shelved due to power supply issues so naturally I assumed any 807s were replacing a 390 service. Have these supply issues being resolved now?
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,840
Location
Croydon
I was under the impression these plans were shelved due to power supply issues so naturally I assumed any 807s were replacing a 390 service. Have these supply issues being resolved now?
It is further up the thread but a few extra services can be run but not all day. So it seems a half hourly service in the peak hours is possible, probably with no electric freight competing for the power.
 

Sorcerer

Established Member
Joined
20 May 2022
Messages
2,222
Location
Liverpool
It is further up the thread but a few extra services can be run but not all day. So it seems a half hourly service in the peak hours is possible, probably with no electric freight competing for the power.
So there's a chance my brain may be malfunctioning but the impression I'm getting so far is that the current services will (in phases) be getting 807s instead of 390s while the December timetable change will see extra services in peak hours ran by 390s without electric freight competing for power. I do find it somewhat odd that the service isn't truly half-hourly but rather pathed as xx:03 and xx:43 seeing as xx:13 out of Euston would clash with a Manchester service. I hope I've got that right.
 