I used this service back in 2009 from Birmingham to Nuneaton and it seemed very strange that it was only a two car 170. It was as may be expected, full and standing.Leicester-Birmingham is a busy corridor (by passenger numbers), I'll give you that.
I used this service back in 2009 from Birmingham to Nuneaton and it seemed very strange that it was only a two car 170. It was as may be expected, full and standing.Leicester-Birmingham is a busy corridor (by passenger numbers), I'll give you that.
Perhaps what needs to be done is reduce the scope of the XC franchise? Run 1tph as an intercity service along the major axes (e.g. Edinburgh-Plymouth) using intercity spec rolling stock.
Then have regional operators run regional semi-fast services to maintain/increase capacity.
So, on the Edinburgh-Plymouth route, XC would run an intercity service making few stops, and, for example
- EMT run services such as Birmingham-Tamworth-Burton-Derby-Chesterfield-Sheffield then on to Leeds/York/Hull
- Northern/TPE run similar connecting services in the North-East
- ATW/LM run Cardiff-Birmingham semi-fast services
- etc
That way, the XC franchise is focussed on intercity services.
EDIT: The XC franchise could then exclusively use proper intercity stock such as HSTs, with Voyagers cascaded to the regional operators.
Maybe because Liverpool-New St is 100% OHLE and almost all of New St-Leicester is 100% non-OHLE?
Leicester-Birmingham is a busy corridor (by passenger numbers), I'll give you that.
I used this service back in 2009 from Birmingham to Nuneaton and it seemed very strange that it was only a two car 170. It was as may be expected, full and standing.
You could give the South West to North East service to FGW or East Coast or even have it run jointly. FGW crew as far as Birmingham and East Coast from Birmingham.The two companies could be nothing to with each other (e.g. Virgin run the Manchester service and the ECML service is given to the same TOC as Transpennine)?
That is quite likely. The London Midland EMUs are much nicer, I must say.
That said, Manchester to Birmingham is 100% OHLE too, is it not? Yet, its services are XC.
At least they have a direct service. Coventry and Leicester are both in the top ten and are relatively close but have no direct service.Indeed, when you consider that Birmingham is the second city and Leicester the tenth largest in Britain, when they are so close together it does make you wonder. All bar one train a day calling at Coleshill Parkway doesn't help either. I would say 3tph or 3-car 170s would be a start.
EMT running north from Sheffield must be possible, particularly to Leeds, as they have HSTs based at Neville Hill (iirc)
Presumably you then have fast XC services running Birmingham - Derby - Sheffield - Doncaster.
Maybe thinking a little more outside the box this is the chance to get Lincoln better connected as TPE can go Sheffield - Worksop - Lincoln and leave their Doncaster path to XC?
Yep, but Manchester-Birmingham services continue to either Bournemouth (after Coventry there is no OHLE) or Bristol (after Barnt Green there is no OHLE).
At least they have a direct service. Coventry and Leicester are both in the top ten and are relatively close but have no direct service.
Yes, like the Liverpool-Leicester via Birmingham route must've been.
Add a Newton Abbot call for connections from Torbay.
Indeed, but you had diesel units working to Manchester regardless, Liverpool actually had EMUs for the journey.
But this will only be done if it can be shown there is a business case for doing so. I remember XC saying at the time when they remove the shop that most of their customers only used the services for journeys of three hours or less.something needs to be done so that it really is InterCity once more.
Access to the fast lines at Doncaster from the Sheffield lines is by an extensive series of crossovers that would undoubtedly limit the speed XC services could pass through Doncaster non-stop, not to mention that the curve approaching from the south is tight. Routing non-stop XC services via the fast lines would also interfere with more services passing through Doncaster than they already do, as currently the XC trains serving Doncaster are grouped on the western island platform. So realistically, any XC services passing through Doncaster non-stop would have to pass through the platform roads they already call at, which more than likely have a fairly low speed limit on them, and in my experience the northbound Crosscountry service is normally held just south of Doncaster on the curve approaching the station, so in short there would be no time benefit from missing out a stop at Doncaster, but a lot of disadvantages from removing interchange capabilities into a wide range of destinations.Hmmm, as with many places though, is the time taken stopping worth the extra custom? I know it is a hub for South Yorks, East Yorks and North Lincs though.
I think we are getting a bit confused here. Manchester is on XC, so would have had diesel untis regardless to Birmingham; Liverpool isn't, and has EMUs to Birmingham only. There has never been a direct Liverpool-Leicester service AFAIK.
I think we are getting a bit confused here. Manchester is on XC, so would have had diesel untis regardless to Birmingham; Liverpool isn't, and has EMUs to Birmingham only. There has never been a direct Liverpool-Leicester service AFAIK.
Leeds then loses its’ direct service to Edinburgh and other areas of Scotland though (Except for one northbound EC service in the morning). Other than that, I’m in agreement. The longer distance (to Edinburgh) XC service should have the faster journey time via Doncaster, which also makes it easier to miss out the Durham stop without hugely reducing Durhams’ range of destinations.Or...
Arrange the services north of Birmingham so that you have
- Birmingham - Derby - Chesterfield - Sheffield - Wakefield - Leeds
- Birmingham - Derby - Sheffield - Doncaster - York - Darlington or Durham (alternatley) - Newcastle (bi hourly to Edinburgh)
At the moment there's a big time penalty for going Newcastle/York - Sheffield/Birmigham via Leeds. Plus the Leeds section is very busy, so there's a fight for seats between the longer distance passengers (who are all diverted via Leeds) and the Leodensians.
At the moment we have two Voyagers between Newcastle and York within about fifteen minutes of each other; its a nonsense.
Running this way would
- Give Edinburgh passengers a faster service to Sheffield/Birmingham
- Allow Leeds - Newcastle to remain with the current hourly TPE service
- Provide more Voyagers to be concentrated on the "core" section of the route
- Speed up the "Newcastle via Doncaster" service as it'd only have one stop between Sheffield and Birmingham
Access to the fast lines at Doncaster from the Sheffield lines is by an extensive series of crossovers that would undoubtedly limit the speed XC services could pass through Doncaster non-stop, not to mention that the curve approaching from the south is tight. Routing non-stop XC services via the fast lines would also interfere with more services passing through Doncaster than they already do, as currently the XC trains serving Doncaster are grouped on the western island platform. So realistically, any XC services passing through Doncaster non-stop would have to pass through the platform roads they already call at, which more than likely have a fairly low speed limit on them, and in my experience the northbound Crosscountry service is normally held just south of Doncaster on the curve approaching the station, so in short there would be no time benefit from missing out a stop at Doncaster, but a lot of disadvantages from removing interchange capabilities into a wide range of destinations.
Which in a large part was due to Virgin XC objecting!!Remember the 9 car 222s were ordered for an improved Midland Mainline service to Leeds but the SRA decided not to allow this service to run.
Leeds then loses its direct service to Edinburgh and other areas of Scotland though (Except for one northbound EC service in the morning). Other than that, Im in agreement. The longer distance (to Edinburgh) XC service should have the faster journey time via Doncaster, which also makes it easier to miss out the Durham stop without hugely reducing Durhams range of destinations.
Good point, I’ve done that route on a diverted Voyager in the past. I don’t think missing out Doncaster is particularly necessary though when it is already the faster route compared to the Leeds alternative. I’m already very happy with the 3 hour Birmingham to Newcastle journey time offered by this route, and hence Birmingham to York or Leeds in 2 hours by one train an hour to each. It would be good to see all the Crosscountry services a day achieving these times though, and not just a handful of services a day.You could run along the line through Pontefract (currently gets two Northern services a day, but offers the fastest route from Sheffield to York)