I fear that the cost of such a refurbishment, which necessarily would involve replacing obsolete electronic systems (and the integration and testing grief that likely goes with that), would likely approach the cost of procuring new rolling stock.I will doubtless be accused of wishful thinking here, but I honestly genuinely think that Southeastern metro fleet replacement will become both an early and easy victim of post-autumn budget austerity when it inevitably hits the rail industry, got to pay for all those pay rises somehow haven't we
Send them all up to Derby including the ones currently withdrawn as spares donors or to be recommissioned and put back into use. And whilst they're there, they'll get a heavy mechanical overhaul and major internal refurbishment involving full strip out and start again once that's done, do the same with the electrostar fleet starting with the 376 upgrading. What is a very cosmetic refresh at present to new seats, USB charging and perhaps even some air conditioning? Once that's complete they can heavily refurbish and midlife extend the expected lifetime of the 375 and 377 fleets. Doing this keeps Derby going so happy unions and workers and saves an awful lot of money. I suspect that the only rolling stock investment we're going to see outside of hs2 for quite some time. Is the sprinter replacements and then either at the same time or just after the turbos
No doubt the god-awful 170 fleet can be life extended in some way as well
Apologies for slight off topic but simply demonstrating my reasoning for the cutbacks potentially to Southeastern
What is wrong with the 170s to merit that comment?