Nym
Established Member
OK, i've seen it banded about a few places and I think it needs it's own topic.
TPE North:
This is soon to be having everything routed via Manchester Victoria and either the Ordsall Curve or the Chat Moss route. Now as I understand it some pepole are flapping about Warrington Central lossing through services to Leeds, aswell as Liverpool South Parkway.
Now, assuming that there are to be sections of four track over the diggle route, and TPE is routed via Victoria.
I have seen possible plans afoot to stop all intermediate calls between Manchester, Huddersfeild and Leeds for TPE North services, with the gap being plugged by 2tph interurban services running:
Manchester Victoria - Ashton Under Lyne - Stalybridge - Huddersfeild - Dewsbry - Leeds
and a potential for a 2nd all stations Manchester - Huddersfeild, and that this sevice be routed into Piccadilly allong a newly four tracked route via Guide Bridge (so that stalybridge retains a link to Piccadilly)
Now if it is specified that Warrington MUST have a through service to Leeds and York, why not shift round some timetabling, as it's going to need a total re-cast for the Chat Moss anyway.
Airport - Newcatle
Chester - Scarbrough
Airport - Middlesbrough
Liverpool L St - Hull
Would it be best for the Manchester - Leeds / York shuttle to remain within TPE or pass this on to Northern? IMO, it would be a nice use for some of the 'extra' stock that TPE will possess after the electrification of most of their TP North West routes.
Liverpool & Warrington:
Now assuming that Warrington Central would like to keep the current service levels, or have as little lost as possible, there are a few options as far as I can see. Warrington Central will loose a through service to Leeds, but if the above happens then it will gain one from Warrington Bank Quay.
If the EMT Liverpool - Norwich service where diverted away this would leave the Warrington Central route with 2tph stoppers and nothing more, and terminating these trains at Oxford Road is problematic to say the least.
One solution would be to re-open a certain closed railway station near a certain Knott Mill station, also incorparating conversion of a certain light rail route back to heavy rail, but thats a different rant altogether, even through it would allow 6tph over the CLC to Liverpool and an increase of service on the Metrolink and Alt'ham lines, aswell as re-instatment of through routes onto the Mid Cheshire Lines and a possible working through 'East Didsbury North' to Hazel Grove and the Hope Valley.
A more realistc solution that I have touched on in another thread would be sidings through the centre of the slow lines on the approach to Piccadilly from the South, to be able to terminate trains on the new platforms 15 and the old platform 14, or even simpler, some West Facing Bays at Piccadilly; platforms 14c and 15c, although it would be easyer to build another island and have three of them over Fairfeild St.
TPE South: It aint broke, don't fix it, if paths become rediculously tight at Piccadilly, send it through Victoria via Philips Park or Ashton Moss junctions, allong with the EMT Liverpool - Norwich.
TPE North West:
I'm including the scottish services on the assumption that they will run Liverpool & Manchester - Scotland.
Well, I'm open to ideas on this, but have way too many to write them in here, mainly centred about TPE gaining 350/1 type stock to run the services Liverpool & Manchester - Scotland (Joining at Wigan if all via chat moss, or Preston if via Bolton) and Airport - Blackpool N via Bolton.
TPE North:
This is soon to be having everything routed via Manchester Victoria and either the Ordsall Curve or the Chat Moss route. Now as I understand it some pepole are flapping about Warrington Central lossing through services to Leeds, aswell as Liverpool South Parkway.
Now, assuming that there are to be sections of four track over the diggle route, and TPE is routed via Victoria.
I have seen possible plans afoot to stop all intermediate calls between Manchester, Huddersfeild and Leeds for TPE North services, with the gap being plugged by 2tph interurban services running:
Manchester Victoria - Ashton Under Lyne - Stalybridge - Huddersfeild - Dewsbry - Leeds
and a potential for a 2nd all stations Manchester - Huddersfeild, and that this sevice be routed into Piccadilly allong a newly four tracked route via Guide Bridge (so that stalybridge retains a link to Piccadilly)
Now if it is specified that Warrington MUST have a through service to Leeds and York, why not shift round some timetabling, as it's going to need a total re-cast for the Chat Moss anyway.
Airport - Newcatle
Chester - Scarbrough
Airport - Middlesbrough
Liverpool L St - Hull
Would it be best for the Manchester - Leeds / York shuttle to remain within TPE or pass this on to Northern? IMO, it would be a nice use for some of the 'extra' stock that TPE will possess after the electrification of most of their TP North West routes.
Liverpool & Warrington:
Now assuming that Warrington Central would like to keep the current service levels, or have as little lost as possible, there are a few options as far as I can see. Warrington Central will loose a through service to Leeds, but if the above happens then it will gain one from Warrington Bank Quay.
If the EMT Liverpool - Norwich service where diverted away this would leave the Warrington Central route with 2tph stoppers and nothing more, and terminating these trains at Oxford Road is problematic to say the least.
One solution would be to re-open a certain closed railway station near a certain Knott Mill station, also incorparating conversion of a certain light rail route back to heavy rail, but thats a different rant altogether, even through it would allow 6tph over the CLC to Liverpool and an increase of service on the Metrolink and Alt'ham lines, aswell as re-instatment of through routes onto the Mid Cheshire Lines and a possible working through 'East Didsbury North' to Hazel Grove and the Hope Valley.
A more realistc solution that I have touched on in another thread would be sidings through the centre of the slow lines on the approach to Piccadilly from the South, to be able to terminate trains on the new platforms 15 and the old platform 14, or even simpler, some West Facing Bays at Piccadilly; platforms 14c and 15c, although it would be easyer to build another island and have three of them over Fairfeild St.
TPE South: It aint broke, don't fix it, if paths become rediculously tight at Piccadilly, send it through Victoria via Philips Park or Ashton Moss junctions, allong with the EMT Liverpool - Norwich.
TPE North West:
I'm including the scottish services on the assumption that they will run Liverpool & Manchester - Scotland.
Well, I'm open to ideas on this, but have way too many to write them in here, mainly centred about TPE gaining 350/1 type stock to run the services Liverpool & Manchester - Scotland (Joining at Wigan if all via chat moss, or Preston if via Bolton) and Airport - Blackpool N via Bolton.