Xenophon PCDGS
Veteran Member
The short answer to both your questions is "yes".Is that a reason to pour endless money into it regardless of huge endemic waste and inefficiency? Should the NHS be given a blank cheque by taxpayers?
The short answer to both your questions is "yes".Is that a reason to pour endless money into it regardless of huge endemic waste and inefficiency? Should the NHS be given a blank cheque by taxpayers?
Agreed, however the bit being cut is the cheap bit (2a).
As I've previously mentioned, the amount spent on the whole of HS2 construction is spent on the NHS every single year. Are people up in arms about the cost of that too? Or is that conveniently ignored?
The short answer to both your questions is "yes".
You probably end up with three Manchester, three Birmingham, two Liverpool and at least one Northern WCML. If north Wales electrification goes forward as sunak claims you will need another for that.
Where has your information on the stated NHS inefficiency and wastefulness come from?Really? The NHS should have no responsibility to become more efficient and less wasteful, with more money going into actual patient care than wasted elsewhere in layers of management and bureaucracy? Right!
Where has your information on the stated NHS inefficiency and wastefulness come from?
If you divide that by 20 years it would take, yours £3000 is £150 per year , per taxpayer .The problem with HS2 is that it's an astounding 10x the cost of similar schemes abroad.
£100 bn is about £3,000 per taxpayer. You could make all rail travel free for that kind of money (fares raised £8bn last year)
Or, if we could build it for the same price as the French/Spanish, we could get HS3 to HS10 for the same price.
It's not the idea of HS2 that people object to, it's the cost.
And if you divide by the century it would last for, its about £30 a year.If you divide that by 20 years it would take, yours £3000 is £150 per year , per taxpayer .
That logo, screams 90's WordArt...Just released by PMs office
Looks like it has proposed journey times and projects of Network North
Still to read it all
![]()
PM redirects HS2 funding to revolutionise transport across the North and Midlands
A revolution in the country’s transport infrastructure will see billions of pounds redirected from spiralling HS2 costs to build the daily connections that people depend on – unlocking potential, driving growth and transforming communities.www.gov.uk
Just released by PMs office
Looks like it has proposed journey times and projects of Network North
Still to read it all
![]()
PM redirects HS2 funding to revolutionise transport across the North and Midlands
A revolution in the country’s transport infrastructure will see billions of pounds redirected from spiralling HS2 costs to build the daily connections that people depend on – unlocking potential, driving growth and transforming communities.www.gov.uk
Capital funding diverted to bus fare subsidies.Just released by PMs office
Looks like it has proposed journey times and projects of Network North
Still to read it all
![]()
PM redirects HS2 funding to revolutionise transport across the North and Midlands
A revolution in the country’s transport infrastructure will see billions of pounds redirected from spiralling HS2 costs to build the daily connections that people depend on – unlocking potential, driving growth and transforming communities.www.gov.uk
What will you actually get for £2.5bn?"£2.5 billion to deliver a new mass transit system in West Yorkshire;" That was already the excuse given to cancel the eastern leg to Leeds, now its also the excuse to cancel the other northern leg?
Is there still a case, after coronavirus, for any post HS2 classic ICWC service at all?And on the classic line IC
1 Manchester
2 Birmingham
Is there still a case, after coronavirus, for any post HS2 classic ICWC service at all?
What about just dropping the classic ICWC service entirely and folding it into the London Midland timetable?
At absolute most the act of parliament allows Starmer to resurrect the scheme should he win the next election, because the authorities to acquire the land will not have been extinguished yet.Sunak failed to mention that the Birmingham-Crewe stretch of HS2 already had approval by Parliament.
Do MKC, Rugby and Watford justify a Class 390 by themselves?Yes, unless you think Milton Keynes, Rugby and Watford have just disappeared.
It matters what stock operates it though, as it will have significant impacts on the costs.Who operates it is less important, you could indeed do that.
Do MKC, Rugby and Watford justify a Class 390 by themselves?
It matters what stock operates it though, as it will have significant impacts on the costs.
I would suggest a total WCML south recast with a uniform set of services operated by London Midland/Successor company, using flat front EMUs with gangways.
Dump all the catering etc.
YesDo MKC, Rugby and Watford justify a Class 390 by themselves?
A recast would have to happen anyway.It matters what stock operates it though, as it will have significant impacts on the costs.
I would suggest a total WCML south recast with a uniform set of services operated by London Midland/Successor company, using flat front EMUs with gangways.
No, it's local services on the Stocksbridge line that he already announced 2 years ago (of course)Don valley line? Uh oh looks like Sunak might have look at the Woodhead tunnel.
Don't believe a word that he says.Chancellor Rishi Sunak announced in his Autumn Budget that plans to restore the Don Valley line, with stops at Deepcar, Oughtibridge, Wadsley Bridge, Neepsend and possibly even Kelham Island, had been awarded a slice of the Government’s £500 million Restoring Your Railway Fund.
The plans also involve reopening Sheffield Victoria station, which could serve a new Barrow Hill line to Chesterfield, stopping at Darnall, the Advanced Manufacturing Park, Woodhouse and other new stations, similar funding for which was granted last year.
Well I would have hoped HS2 Phase2a survived as it was not a costly bit. There must be scope as otherwise why was Phase2 split into a and b in the first place ?.Sunak appears to have made the sensible decision to kick the expensive white elephant of HS2 phase 2b/NPR into the long grass, so presumably the bill currently in progress through the Westminster Parliament will be withdrawn. It is good that this is to be done in Manchester to humiliate Burnham.
However, what will happen with HS2 phase 2a? Will the works just be mothballed and the powers granted to construct it be preserved, so that the scheme could be resurrected at a later date, or will the scheme be actively cancelled by destroying the works already done and/or actively cancelling the authority to construct it? Not constructing phase 2a means that a bottleneck will remain on the WCML between Lichfield and Stafford, so I would hope that in the fullness of time it could be built, and also enable trains to run non-stop from Birmingham to Crewe to bypass the congested line via Wolverhampton.
This sort of debate would have happened irrespective of how far North HS2 got. If Euston did not go ahead and also while OOC is the temporary terminus there is a huge debate to be had over how many IC services go down HS2.At absolute most the act of parliament allows Starmer to resurrect the scheme should he win the next election, because the authorities to acquire the land will not have been extinguished yet.
But that's about it, as far as actually building it, Parliamentary approval is inconsequential.
== Doublepost prevention - post automatically merged: ==
Do MKC, Rugby and Watford justify a Class 390 by themselves?
It matters what stock operates it though, as it will have significant impacts on the costs.
I would suggest a total WCML south recast with a uniform set of services operated by London Midland/Successor company, using flat front EMUs with gangways.
Dump all the catering etc.
140mph is the design top speed, but the Class 390s will be worn out by then.What I can also see is no new stock being built. After all only Birmingham will 100% justify higher speed trains. And only Birmingham will be able to benefit from trains built to fit a larger loading gauge. I can see Pendolinos being stretched to their envisaged top speed - was that 155mph ?.
Or will Avanti decide the benefits of 155mph are outweighed by the extra costs.
Well by cancelling HS2 Phase 2b they've ripped the heart out of NPR, so I wouldn't expect much at all from the government on that.As for the Northern end - The ball is now firmly in the NPR court.
Disappointing if they don’t run any Edinburgh services. I was hoping changing from GWR to a Scotland-bound train at OOC would ease travel to the northeast of Scotland. Glasgow services aren’t so useful due to having to change stationsThe likely service pattern is essentially "what's there now including the planned second Liverpool, but a bit faster". The key gain is south of Hanslope Junction where a lot more local services and freight can be added, recognising that Milton Keynes will have a population heading for 500K by the time the whole thing was originally going to fully open.
Thus it'll likely be:
3 Brum
3 Manchester
2 Liverpool
1 N Wales (with the electrification proposal)
1 Glasgow
And on the classic line IC
1 Manchester
2 Birmingham
If they still go with 200m units probably also a Lancaster semifast, as taking 65m off the length of the Glasgows but not removing stops would be a recipe for overcrowding. But I suspect we'll see the order changed for units 250-300m long instead.
Yes
A recast would have to happen anyway.
It's unlikely they would be fast enough to beat the ECML, so probably not worth it.Disappointing if they don’t run any Edinburgh services. I was hoping changing from GWR to a Scotland-bound train at OOC would ease travel to the northeast of Scotland. Glasgow services aren’t so useful due to having to change stations
Thanks - corrected.140mph is the design top speed, but the Class 390s will be worn out by then.
Well by cancelling HS2 Phase 2b they've ripped the heart out of NPR, so I wouldn't expect much at all from the government on that.
Disappointing if they don’t run any Edinburgh services. I was hoping changing from GWR to a Scotland-bound train at OOC would ease travel to the northeast of Scotland. Glasgow services aren’t so useful due to having to change stations
There will be workforce relations implications to having WCML classic services operated by the same TOC that operates the high speed services, so I would expect them to be separate TOCs even if they are branded similarly.To be fair I can see the sense in everything on the classic WCML being operated by something like the Class 730 at 110mph, given that it's about connectivity. But there's also the point that having "Avanti Hispeed" crews sign the south WCML (which would be enabled by having them run those 3-4 trains that way) would allow more flexibility in the case of engineering work or HS2 being closed due to an incident. So I think on balance keeping a few "Avanti West Coast" services, presumably using 200m HS2 units, on the WCML.
Unfortunately Manchester and Birmingham already require a change. I always thought the number of journeys where Euston-Paddington transfers are removed with a change at OOC was a massive benefit of HS2 that wasn’t shouted about enough - or does everyone expect me just fly from Scotland to the south west?There's little point bothering about Edinburgh as the ECML will be faster. However I do see your point. A change at Manchester or Birmingham would allow you a fairly easy connection without faffing about crossing London, though.
There will be workforce relations implications to having WCML classic services operated by the same TOC that operates the high speed services, so I would expect them to be separate TOCs even if they are branded similarly.
(The forbidden three letter acronym)
Unfortunately Manchester and Birmingham already require a change. I always thought the number of journeys where Euston-Paddington transfers are removed with a change at OOC was a massive benefit of HS2 that wasn’t shouted about enough - or does everyone expect me just fly from Scotland to the south west?
Probably with Hitachi charging far more for a last-minute variation than if the government had taken them up on it when they first suggested the idea.But I suspect we'll see the order changed for units 250-300m long instead.
For sure, but with the 390s life-expired there won't be a justification for a new generation of 125mph tilting trains. 110mph units with a suitable seating layout would suffice.MKC, Rugby and Watford justify a fast service to Euston (nonstop, or at most calling at MKC and Watford) and to Birmingham (calling at no more than Rugby, Cov and Intl) and at least Crewe (not calling all stations on the TV), yes. MK will have a population of 500K before long, which would make it the 14th largest settlement in the UK, and most of the basis of HS2 P1 is about enhancing its service.
I would think that the idea of using XC was discounted first, before the idea of going via London was even considered. I've done seven hours on a Voyager once, and that was quite enough.I know it's rubbish, but XC operate direct hourly services from Edinburgh to the South West and vice versa if that's your priority