The discussion largely happened in this thread https://www.railforums.co.uk/thread...-brighton-services.247923/page-2#post-6293091
What media attention is it getting now?
What media attention is it getting now?
Some MP or other has just heard about it I think, it’s on Twitter:The discussion largely happened in this thread https://www.railforums.co.uk/thread...-brighton-services.247923/page-2#post-6293091
What media attention is it getting now?
Some MP or other has just heard about it I think, it’s on Twitter:
I expect most objectors just don’t understand the operational benefits
May 2024When would this come into effect if at all?
If passengers want these changes from Monday to Saturday, surely they would also want them on Sunday.My one big complaint is that GTR are not proposing to change the Sunday service as the existing Sunday West Coastway service is absolutely dreadful.
Yes if its good one service, you'd think it might be considered good for another.Ahh okay. In that case I will accept the skip-stopping, particularly as that would justify my case for doing the same to the Southampton - Brighton services. For me personally I would alternate Woolston/Portchester, Emsworth/Southbourne, Ford/Angmering and Southwick/Portslade, bringing the total number of intermediate calls in those services down to 15.
If I were to guess its either because:Is Sunday being ignored because they don't have the resources to modify that yet and will Sunday be looked at in the future?
Portsmouth services only run in the late evening and usually divide with the other portion going to Ore or Littlehampton, otherwise they only run frequently when the Arun Valley is closedI mean I believe Haywards Heath gets a direct train to Portsmouth on a Sunday. Why would one want that on a Sunday when it's not running any other day?
Or because it is operationally convenient in the context of a less frequent service running overall.If I were to guess its either because:
a) Southampton - Gatwick and Portsmouth - Brighton traffic is strongest on a Sunday
b) They’re keeping it as a control; so they can compare which iteration works better
I’m overall not too happy with the suggested changes. The fasts out of Brighton need to lose their Southwick calls, and there should be the 1tph splits for Portsmouth and Southampton, as with the London via Horshams. I also wondered about sending the Brighton stoppers to Bognor rather than Chichester but I don’t know if this is useful.Southern have tweeted about this recently which has generated some interest.
There may be clear operational benefits but if you're from the Western end of the changes, they are not going to benefit passengers.
If you're from Southampton you loose your direct Gatwick service and instead receive a 7-10 min same platform connection at Havant, Chichester or Barnham. So overall, slower journeys and changes required.
If you're from Portsmouth you loose your direct Brighton services with 20 minute connections at Chichester or Barnham. You gain a second Gatwick/Victoria service.
The stopping service is cut back from Portsmouth to Chichester. The requires the stopping stations to be moved onto the two Gatwick/Victoria services. The minimum travel time between Portsmouth and Chichester will increase by 50%.
But hey it improves turnaround times, and presumably uses less units... so lets do it anyway.
It would make more sense if Southern provided a clockface timetable from Gatwick to Chichester and then one fast, one stopping to Portsmouth.
It all works fairly nicely if you don't look west of Chichester. For me swapping the Southampton and Pompey arms of their respective dishes doesn't use extra units. I don't see why both Portsmouth services have to go to the Harbour.
Agree that these proposals are good for improving connections to the Isle of Wight because of the extension of all Southern services to Portsmouth Harbour. However it’s a shame that Portsmouth loses its direct service to Brighton.Two trains to the Harbour offers us the prospect of better connections to the hourly Isle of Wight catamaran. The Victoria trains provide us with a useful route to Gatwick and are competitive with SWR in journey time to many parts of London. They are also cheaper.
Since the previous timetable change, which saw the Victoria trains almost all cut back to Portsmouth and Southsea ‘in order to improve reliability’, connections at the harbour to this route have been dire. This change will mean that we are no longer faced with waits of up to an hour there. This will be a major improvement for us, and for those coming across on the Gosport ferry.
Thanks, that’s reassuring.It appears to be reallocation of the same rolling stock, rather than cutting stock - eg the Hove shuttle and Littlehampton to Portsmouth service resources reallocated to operate Brighton to Chichester, and the existing Brighton / Victoria to Portsmouth / Southampton stock reshuffled.
[Sunday unchanging]If I were to guess its either because:
a) Southampton - Gatwick and Portsmouth - Brighton traffic is strongest on a Sunday
Agree that these proposals are good for improving connections to the Isle of Wight because of the extension of all Southern services to Portsmouth Harbour. However it’s a shame that Portsmouth loses its direct service to Brighton.
The simpler answer is to extend the existing Victoria-Southsea service to the Harbour, and return it back on the alternative half hour to its existing return. Same with Southampton.
Southern are giving that as the time from PMH - 2h5 is an average 3min slower than now but with no changing.As a Fratton - London user, I used to have the option (ignoring via Eastleigh) of:
...
2 x 2hr 12min to Victoria (at a nice discount to Waterloo)
Southern have tweeted about this recently which has generated some interest.
There may be clear operational benefits but if you're from the Western end of the changes, they are not going to benefit passengers.
If you're from Southampton you loose your direct Gatwick service and instead receive a 7-10 min same platform connection at Havant, Chichester or Barnham. So overall, slower journeys and changes required.
If you're from Portsmouth you loose your direct Brighton services with 20 minute connections at Chichester or Barnham.
You gain a second Gatwick/Victoria service.
But what about what pasemgees want and where the biggest flows are?Or because it is operationally convenient in the context of a less frequent service running overall.
Well theres a consultation for a reason…But what about what pasemgees want and where the biggest flows are?
But the consultation doesn't include Sundays or have I got that wrong?Well theres a consultation for a reason…
Correct. But is there a pressing need to reorganise the Sunday service at no extra cost? If not, don't waste resources tryihg to plan it.But the consultation doesn't include Sundays or have I got that wrong?
If the Sunday service is the same as the service for the rest of the week, but hourly, instead of half-hourly, that will represent some consistency.But the consultation doesn't include Sundays or have I got that wrong?
Well wasn't the pressing need the types of journeys passengers want to make Monday to Saturday?Correct. But is there a pressing need to reorganise the Sunday service at no extra cost? If not, don't waste resources tryihg to plan it.