The routes he’s referring to would be low speed loops/sidings. There’s no way a Driver would be able to traverse every single crossover or running line whilst learning a route, it’s not practical. Whilst route learning a lot of time will be spent looking at maps aswell as physically travelling over the route and most Drivers (including myself) will have a look at route maps occasionally to refresh themselves with more obscure moves.
You have mentioned route maps.
Commercial pilots carry airway and airport charts to cover off the unfamiliar. These used to be physical but are now usually a tablet computer. Is this (or could it be) a thing for train drivers?

I do accept though that this wouldn't stop any expectation bias.

Yes, that's correct, in the sense that I have observed it. The first time I noticed this was on the down relief entering Reading: theatre box for various platforms, and possibly even the up fast in the down direction, but blank for platform 8, the 'main' route.

Also, a pal who works for GBRF has shown me a Dec 2013 signalling notice, Peterborough station capacity enhancements or something like that, and the adjacent signal on the up slow approaching Peterborough appears to have that very arrangement - theatre blank for straight route to platform 1.
I would expect the logic is that if the theatre box always illuminated then expectation bias would lead to the content being overlooked on occasion.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Railsigns

Established Member
Joined
15 Feb 2010
Messages
2,754
I would expect the logic is that if the theatre box always illuminated then expectation bias would lead to the content being overlooked on occasion.
It allows a theatre indicator to be used in situations where the permissible speed on the fastest route exceeds the speed at which a theatre indicator is deemed to be readable.
 

bluriniho

New Member
Joined
12 Jun 2023
Messages
3
Location
Rugby
The odd thing that jumped out for me on reading it was the signal clearing when the train was 790m away - nearly half a mile. That seems to create a possible situation where the driver sees the main aspect clear, but misses the junction indicator at that distance. Of course they should see it when they get closer, but surely that is an unnecessary risk?

I would have expected the signal to release much closer on approach (even say, 400m, would give more than enough reading time?) Yes, possible running time impact, but probably not significant given the low speed junctions being protected and the fact in this circumstance it only applies when the flashing aspect sequence has been inhibited.
 

Railsigns

Established Member
Joined
15 Feb 2010
Messages
2,754
The odd thing that jumped out for me on reading it was the signal clearing when the train was 790m away - nearly half a mile. That seems to create a possible situation where the driver sees the main aspect clear, but misses the junction indicator at that distance. Of course they should see it when they get closer, but surely that is an unnecessary risk?

I would have expected the signal to release much closer on approach (even say, 400m, would give more than enough reading time?) Yes, possible running time impact, but probably not significant given the low speed junctions being protected and the fact in this circumstance it only applies when the flashing aspect sequence has been inhibited.
A junction indicator is considered to be readable at 800 metres, so the junction signalling would have been designed on that basis. Stepping up the aspect as soon as the junction indicator and main aspect are both visible and readable is desirable so that a driver who's become used to seeing the signal clear as their train approaches it has more opportunity to stop without SPAD-ing if it doesn't.
 

driver9000

Established Member
Joined
13 Jan 2008
Messages
4,569
You have mentioned route maps.
Commercial pilots carry airway and airport charts to cover off the unfamiliar. These used to be physical but are now usually a tablet computer. Is this (or could it be) a thing for train drivers?

Yes, Drivers are issued (or should be) with maps for route learning guidance. I keep certain sections in my bag mainly for reference to shunting moves at large stations that may not happen all that often but a Driver likely wouldn't have them out as a matter of routine.
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,936
Also, a pal who works for GBRF has shown me a Dec 2013 signalling notice, Peterborough station capacity enhancements or something like that, and the adjacent signal on the up slow approaching Peterborough appears to have that very arrangement - theatre blank for straight route to platform 1.
It does indeed. 50mph. There's also a route to platform 1 via the 15mph crossover out onto the Up Fast then back across through Lumo's crossovers, and you *do* get a "1" in the indicator for that move.
 

TreacleMiller

Member
Joined
22 Feb 2020
Messages
537
Location
-
The signal in question has a long period of sighting if you are preparing to stop at it for a red, assuming you've gone passed the previous signal at a reasonable speed.
I had the same sequence upto this signal today without the route taking me onto the slow lines.

Taking full power in very similar traction to the Lumo service - as soon as the signal cleared to Green (with no feather on) - I hit the points at pretty much the same speed as the Lumo service..

That's from a 25mph speed as I had been approaching the red aspect.

You can see clearly see the banner repeater for the next signal as soon as you've cleared the bridge, possibly before if its set at green. I think I was at 60mph as I passed the signal and you can then see if the points are physically set or not for the diverging route.

The feather is, as per other's posts, very visible. Number 2 a little less so due to the OHLE.

This combined with the fact the driver stated they were looking at the banner repeater was being looked at tells the tail.

Indeed, however whether or not you still 'sign' them having not driven them or had a refresher within the set timescale is open to debate.

You sign the route or you don't. You are assessed on the route as a whole, not "just the fast lines". I've done slow line moves in the past two weeks some drivers with 20 years on the books say they haven't. There's areas I don't really know, which would be the case for most of my Depot so I'd asked to be talked through the move at worst.

It's alright knowing where you're going - but you need to know that's where you're going!

Refusing to go via a slow line platform in a major station would lead to serious, serious questions and one would imagine that it would be reported by the signaller.
 

Signal Head

Member
Joined
26 May 2013
Messages
466
A junction indicator is considered to be readable at 800 metres, so the junction signalling would have been designed on that basis. Stepping up the aspect as soon as the junction indicator and main aspect are both visible and readable is desirable so that a driver who's become used to seeing the signal clear as their train approaches it has more opportunity to stop without SPAD-ing if it doesn't.
As the report mentions somewhere (only had chance to skim read most of it), part of the problem here is the combined distance from release point to signal, and signal to turnout. Current standards provide stipulations for both of those separately but don't, so far as I am aware, consider the combination.

In this instance, whilst everything is compliant, I cannot help but feel that, notwithstanding any failures in training, 'we' (ie the S&T function) have to some extent 'set a trap' for drivers to fall into - if the JI is not observed or does not register properly.

I do not subscribe to the view that these things are simply down to driver error all the time, or that they should be written off as such. To do that risks potentially overlooking a 'system failure' (not necessarily a technical one), which has been exposed by a momentary human lapse. That then presents an opportunity to do something about it, to close the loophole or whatever.

The fact that two drivers have almost come to grief here only a year apart tells me that, however compliant it is on paper, the signalling here would probably benefit from another coat of looking at.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,396
The fact that two drivers have almost come to grief here only a year apart tells me that, however compliant it is on paper, the signalling here would probably benefit from another coat of looking at.
How reasonable is it to spend significant money on mitigating this issue when in about five or six years this problem will disappear for good though?

If anything problems like this reiterate the need for rapid ETCS deployment across the rail network.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,364
Location
Bolton
I do have some sympathy with the luggage restrictions they've introduced following the incident - some people really do take the kitchen sink with them when they travel - but it's not sufficient on its own, and they should have been doing something about it far sooner rather than waiting for the publication of the RAIB report.
It's interesting because there aren't such luggage limits on Hull Trains or LNER, whose onboard luggage stowage is very very similar to Lumo's i.e. there's not much other than overheard but lots of space overhead. Grand Central's overhead space is much smaller but it's still true there's lots of space there and little space elsewhere.

So if the luggage limits are relevant to safety, then either Lumo should just do whatever Hull Trains and LNER are doing to mitigate this risk, or Hull Trains and LNER aren't mitigating a risk adequately. It seems more likely to me that the new luggage limits are as a result of the complaints from customers, and their onboard hosts, about bags being so badly in the way. They may also be safety window dressing.

== Doublepost prevention - post automatically merged: ==

You have mentioned route maps.
Commercial pilots carry airway and airport charts to cover off the unfamiliar. These used to be physical but are now usually a tablet computer. Is this (or could it be) a thing for train drivers?

I do accept though that this wouldn't stop any expectation bias.
I think that in general the driver wouldn't be able to look at a book or tablet while their train is moving anyway.
 
Last edited:

trebor79

Established Member
Joined
8 Mar 2018
Messages
4,913
How reasonable is it to spend significant money on mitigating this issue when in about five or six years this problem will disappear for good though?

If anything problems like this reiterate the need for rapid ETCS deployment across the rail network.
Oh yeah, that'll be great comfort to people if a train does overturn there in the interim. "Yeah we knew that was a risk but nah mate we thought we'd just leave it for a few years. Soz."
 

Wilts Wanderer

Established Member
Joined
21 Nov 2016
Messages
3,199
How reasonable is it to spend significant money on mitigating this issue when in about five or six years this problem will disappear for good though?

If anything problems like this reiterate the need for rapid ETCS deployment across the rail network.

Well, based on a statistical analysis of the recent two events, with this incident happening on average (currently) once per year, potentially you’ll have a death toll by the time ETCS has conveniently solved the problem.

I will also believe the full installation of ETCS on complex U.K. mixed traffic main lines when I see it.
 

sbf kent

Member
Joined
5 Feb 2020
Messages
39
Location
St Margaret's Bay
I cannot see why the railway cannot adopt geofencing as a supporting technology when diversions are in place. Linked to the train directly geofencng could slow or stop a train on an approach to a diversion independent of the driver's actions. At the moment the range is 100 to 200 metres. In the future quantum computing technology will increase this accuracy hugely. In the shorter term geofencing infringement data would be a useful source of the level of risk.
 

Dai Corner

Established Member
Joined
20 Jul 2015
Messages
6,998
I cannot see why the railway cannot adopt geofencing as a supporting technology when diversions are in place. Linked to the train directly geofencng could slow or stop a train on an approach to a diversion independent of the driver's actions. At the moment the range is 100 to 200 metres. In the future quantum computing technology will increase this accuracy hugely. In the shorter term geofencing infringement data would be a useful source of the level of risk.
Is GPS precise enough to detect which line a train is on when the lines are a couple of metres apart?
 

Railsigns

Established Member
Joined
15 Feb 2010
Messages
2,754
Why do we need an alternative system for detecting the positions of trains when the signalling system already knows where the trains are, knows where they're going, and has the capability or the potential to control their speed or bring them to a stand?
 

TreacleMiller

Member
Joined
22 Feb 2020
Messages
537
Location
-
Is GPS precise enough to detect which line a train is on when the lines are a couple of metres apart?
It's good enough to lockout doors on platforms (mostly) .

I cannot see why the railway cannot adopt geofencing as a supporting technology when diversions are in place. Linked to the train directly geofencng could slow or stop a train on an approach to a diversion independent of the driver's actions. At the moment the range is 100 to 200 metres. In the future quantum computing technology will increase this accuracy hugely. In the shorter term geofencing infringement data would be a useful source of the level of risk.

Tpws already does this. If loops were provided for the junction and we're energised at an appropriate speed, they would have been able to rapidly slow down the unit prior to reaching the junction. They might not stop an incident but they would mitigate the risk somewhat.
 

DoubleO

Member
Joined
30 May 2018
Messages
218
Why do we need an alternative system for detecting the positions of trains when the signalling system already knows where the trains are, knows where they're going, and has the capability or the potential to control their speed or bring them to a stand?
The signalling system doesn't have the ability to control train speed, that's one of the reasons this incident occurred. It only has the ability to check train speed has not exceeded a certain value at certain locations.
 

Railsigns

Established Member
Joined
15 Feb 2010
Messages
2,754
The signalling system doesn't have the ability to control train speed, that's one of the reasons this incident occurred. It only has the ability to check train speed has not exceeded a certain value at certain locations.
If it doesn't already have the ability to do it, then it has the potential to do it with additional TPWS or ATP/ATO etc. That's why I wrote "capability or potential".
 

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,910
It's good enough to lockout doors on platforms (mostly)
It absolutely isn't. GPS is useless for knowing if a train has stopped short on a platform. It's fine for knowing what station you're at but it won't enable ASDO to lock out unplatformed doors based on how the train stops.

There's a reason why balises are used for that (as well as complex multi platform stations).
 

TreacleMiller

Member
Joined
22 Feb 2020
Messages
537
Location
-
It absolutely isn't. GPS is useless for knowing if a train has stopped short on a platform. It's fine for knowing what station you're at but it won't enable ASDO to lock out unplatformed doors based on how the train stops.

There's a reason why balises are used for that (as well as complex multi platform stations).

Stopped short? Sure. Identified the correct platform and station location - yes. Theres only one station I sign with them fitted and surprisingly enough they don't alway work correctly either. Though I do end up telling my set where I am pretty frequently at some areas.

Moot point eitherway, it's not needed and with a proper signalling setup, competent driver and eventually (decade or three) ATO it's entirely overkill. Trains are l
GPS guided bombs.
 

marsker

Member
Joined
14 May 2020
Messages
163
Location
Marske-by-the-Sea
Apologies if it has been mentioned before, but would it help where a train has been slowed under "Approach control" nechanisms, if the junction indicator was to light light a second or so before the aspect on the signal changed - just to add a little emphasis.
 

Railsigns

Established Member
Joined
15 Feb 2010
Messages
2,754
Apologies if it has been mentioned before, but would it help where a train has been slowed under "Approach control" nechanisms, if the junction indicator was to light light a second or so before the aspect on the signal changed - just to add a little emphasis.
That's how it works currently. The junction indicator has to be proved lit before the signal will clear, causing a delay of a second or two.
 

Signal Head

Member
Joined
26 May 2013
Messages
466
I cannot see why the railway cannot adopt geofencing as a supporting technology when diversions are in place. Linked to the train directly geofencng could slow or stop a train on an approach to a diversion independent of the driver's actions. At the moment the range is 100 to 200 metres. In the future quantum computing technology will increase this accuracy hugely. In the shorter term geofencing infringement data would be a useful source of the level of risk.
How would it know which route the train was going to take? It would have to be linked to the signalling system to get that information. Suitable mitigation could probably be had using TPWS, avoiding all the development and safety case issues and costs of interfacing to 'something new', there's also the cost of fitting whatever you need to the rolling stock.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,396
Oh yeah, that'll be great comfort to people if a train does overturn there in the interim. "Yeah we knew that was a risk but nah mate we thought we'd just leave it for a few years. Soz."
Well its not as if a solution can instantly poof into existance tomorrow.

Once you add design, development and regulatory approval it could easily be years.
All to solve a problem which will be solved a handful of years later.

The railway does not have an infinite supply of money and this looks like a terrible way to spend it.

Ofcourse if this is such a safety risk we could just slap a TSR on the track until the ETCS installation occurs......

== Doublepost prevention - post automatically merged: ==

Well, based on a statistical analysis of the recent two events, with this incident happening on average (currently) once per year, potentially you’ll have a death toll by the time ETCS has conveniently solved the problem.
There are far cheaper mitigations for this than designing some sort of bespoke signalling solution though.

I will also believe the full installation of ETCS on complex U.K. mixed traffic main lines when I see it.
Well given that ETCS has been widely deployed in similar situations elsewhere, if it can't be done it will be more the fault of the railway industry than the standard.
 

Aviator88

Member
Joined
22 Oct 2012
Messages
323
I'm surprised that, in this day and age, modern trains don't have a display in the cab which shows the local track diagram, as well as what route has been set by the signaller in real-time etc. I know the point is to keep the driver's eyes outside, but it would assist the driver in moments of doubt without having to spend time contacting the signaller.

There's no need to rely on GPS - just use the information collected from the track circuits and relay it via Wi-Fi on the track infrastructure or similar.
 

plugwash

Established Member
Joined
29 May 2015
Messages
1,997
I think the problem with such a system is that drivers *would* start relying on it, whether they were meant to or not. So you would have to design it as a safety-critical system and that starts adding zeros to the price tag. If you are going to develop a system to display routes to the driver and making it work to safety-critical standards of reliability then you may as well go the whole hog and do ETCS.
 

takno

Verified Rep - Traksy
Joined
9 Jul 2016
Messages
6,614
I'm surprised that, in this day and age, modern trains don't have a display in the cab which shows the local track diagram, as well as what route has been set by the signaller in real-time etc. I know the point is to keep the driver's eyes outside, but it would assist the driver in moments of doubt without having to spend time contacting the signaller.

There's no need to rely on GPS - just use the information collected from the track circuits and relay it via Wi-Fi on the track infrastructure or similar.
There isn't any "just" about this. The TD feed from sigbalboxes to sites like traksy is wildly off levels of reliability that you could use for safety. Adapting that to exchange data via WiFi would add a whole new layer of complexity and failure.

In fact building this level of safe comms has been happening for a number of years, and would happen in ECTS, which is essentially ready now and being rolled out much more quickly than your suggestion, and provides a much higher level of safety.

Another factor with maps is simply getting the map to clearly show things like speed differentials. Look at the maps into major stations like Peterborough and tell me you can at a glance figure out which routes are low speed.
 

dosxuk

Established Member
Joined
2 Jan 2011
Messages
2,445
Commercial pilots carry airway and airport charts to cover off the unfamiliar. These used to be physical but are now usually a tablet computer. Is this (or could it be) a thing for train drivers?
Aircraft pilots are also expected to be able to take their vehicle off the planned route with little-to-no notice, and be able to safely get back on the land even with zero outside communication.
 

TurboMan

Member
Joined
5 Apr 2022
Messages
422
Location
UK
In this instance, whilst everything is compliant, I cannot help but feel that, notwithstanding any failures in training, 'we' (ie the S&T function) have to some extent 'set a trap' for drivers to fall into - if the JI is not observed or does not register properly.

I do not subscribe to the view that these things are simply down to driver error all the time, or that they should be written off as such. To do that risks potentially overlooking a 'system failure' (not necessarily a technical one), which has been exposed by a momentary human lapse. That then presents an opportunity to do something about it, to close the loophole or whatever.

The fact that two drivers have almost come to grief here only a year apart tells me that, however compliant it is on paper, the signalling here would probably benefit from another coat of looking at.
A lot of effort has gone into understanding human factors and how they apply to drivers, guards etc. with the result that NTS are now very much integrated into training and assessment. But there hasn't been as much progress in ensuring that designers of signalling, trains etc. understand human factors and how design, done well, can mitigate the risk of human error, and done badly can increase it. So it's good to see that someone gets it - thank you.

== Doublepost prevention - post automatically merged: ==

I cannot see why the railway cannot adopt geofencing as a supporting technology when diversions are in place. Linked to the train directly geofencng could slow or stop a train on an approach to a diversion independent of the driver's actions. At the moment the range is 100 to 200 metres. In the future quantum computing technology will increase this accuracy hugely. In the shorter term geofencing infringement data would be a useful source of the level of risk.
That's what ETCS is for, albeit using balises for position data not GPS. It would be better to concentrate on expanding the use of ETCS across the network, rather than coming up with another new technology.
 