SuspectUsual
Established Member
- Joined
- 11 Jul 2018
- Messages
- 6,858
As a layman, it seems very strange that the system should be designed so that the signal protecting the junction clears to green with junction indicator feather when the speed restriction on all the diverging routes is so big.
Now, I guess this wouldn't often be an issue, insofar as I suspect the vast majority of diverging trains will be calling at Peterborough and therefore there'd be no reason to accelerate excessively, but if the divergence is for the regulation of a non-stop train, it creates a risk.
What would be the downside of the approach controlled signal clearing to yellow for diverging routes?
Now, I guess this wouldn't often be an issue, insofar as I suspect the vast majority of diverging trains will be calling at Peterborough and therefore there'd be no reason to accelerate excessively, but if the divergence is for the regulation of a non-stop train, it creates a risk.
What would be the downside of the approach controlled signal clearing to yellow for diverging routes?
