Is it true that the Clitheroe to Hellifield workings on Sunday have gone to the big timetable in the sky?
Do you still need the line?Is it true that the Clitheroe to Hellifield workings on Sunday have gone to the big timetable in the sky?
Yeah, I didn't get to do it before the PandemicDo you still need the line?
I guess it's steam tours only? Or have they dried up too?Correct, for this year at least.
Saphos Trains Ltd have two more of their "Fellsman" day trips from Crewe to Carlisle routed that way, i.e. via Clitheroe, on Wednesday 2nd August 2023 and on Wednesday 20th September 2023.I guess it's steam tours only? Or have they dried up too?
20th September should have A4 haulage too…Saphos Trains Ltd have two more of their "Fellsman" day trips from Crewe to Carlisle routed that way, i.e. via Clitheroe, on Wednesday 2nd August 2023 and on Wednesday 20th September 2023.
Anyone aware of anything else?
Temporarily, yes.Is it true that the Clitheroe to Hellifield workings on Sunday have gone to the big timetable in the sky?
Using buses is quicker. In any case, even if trains were diverted via the S & C, you would still need buses to serve Lancaster/Oxenholme/Penrith.Hope it's not the beginning of the end for the line. It was so busy with S & C freight in the 1960s and 1970s, and the Sunday diversions from the WCML were important too until they decided to bus passengers between Preston and Carlisle, something I will never, ever understand.
Using buses is quicker. In any case, even if trains were diverted via the S & C, you would still need buses to serve Lancaster/Oxenholme/Penrith.
It is slightly quicker by coach direct Preston to Carlisle if a diversion got an unimpeeded path, once you start adding in getting inbetween other trains, a coach on the M6 will win. If the coach stops along the way the advantage starts swaying back to the train but as noted above you still have to bus the intermediate stations.We've heard this argument many times but it never convinces.
Yet Carlisle-Glasgow gets diverts via Dumfries as well as buses taking similar or less time depending on pathing.We've heard this argument many times but it never convinces.
It is slightly quicker by coach direct Preston to Carlisle if a diversion got an unimpeeded path, once you start adding in getting inbetween other trains, a coach on the M6 will win. If the coach stops along the way the advantage starts swaying back to the train but as noted above you still have to bus the intermediate stations.
Yet Carlisle-Glasgow gets diverts via Dumfries as well as buses taking similar or less time depending on pathing.
I also suspect there's little difference in Preston-Crewe on a direct bus or divert via Manchester given the known issues in the Castlefield corridor too. Likewise Crewe-Liverpool by bus or via Manchester.
Why the difference?
That's true.I think that there would need to be a very big time disadvantage before the majority of passengers come out against the rail diversion.
I suppose the Preston - Crewe divert is electrified which makes things easier.
That's true.
But it was done pre electrification too, albeit only on a planned basis.
I've done Edinburgh-Newcastle via Carlisle with a journey time of around 3 hours. I'd expect a non stop bus to take less time than that, but I was in first class and the crew certainly kept the beer flowing. So I was hoping for a delay!
As do I.Well yes, if passengers prefer the ECML diverts, they will prefer a divert via Appleby as well.
I suspect that cost and operational convenience are the key drivers.
The S&C has very long signal sections which doesn't help. Diverting via the Bentham line and reversing at Hellifield, while possible, is even more difficult - Carnforth to Settle Jct. is 24 mi 44 ch and takes ~40 mins to traverse; pathing anything extra would be challenging to say the least.Well yes, if passengers prefer the ECML diverts, they will prefer a divert via Appleby as well.
I suspect that cost and operational convenience are the key drivers.
As do I.
Admittedly journey time is much less of a consideration, but I know the sleepers have ran via the Durham Coast in the Serco era. Likely when Lamington collapses I suspect. Cost of that can't have been cheap with having to arrange a diesel loco to take over for the diversion from the diversion.
The S&C has very long signal sections which doesn't help. Diverting via the Bentham line and reversing at Hellifield, while possible, is even more difficult - Carnforth to Settle Jct. is 24 mi 44 ch and takes ~40 mins to traverse; pathing anything extra would be challenging to say the least.
The line still has a reasonable amount of freight. It generates its own freight with the Clitheroe to Carlisle/Mossend cement trains both there and back, it also has freight from Ribblehead to Tuebrook and Hunslet and Rylestone to Leyland plus a regular daily Carlisle to Crewe departmental and a daily Carlisle to Chirk log train both of which can be quicker than down the WCML due to the amount of loops they are required to stop in.Do you still need the line?
It has a lot of intermediate block (IB). For instance, between Settle Jct and Blea Moor there are signals at Horton so you can have 2 trains in section. I think this was put in when the S&C was full of coal trains from Ayrshire to Aire Valley power stations some years ago. (Not sure if there is IB southbound between Blea Moor and Settle Jct)The S&C has very long signal sections which doesn't help. Diverting via the Bentham line and reversing at Hellifield, while possible, is even more difficult - Carnforth to Settle Jct. is 24 mi 44 ch and takes ~40 mins to traverse; pathing anything extra would be challenging to say the least.
It has a lot of intermediate block (IB). For instance, between Settle Jct and Blea Moor there are signals at Horton so you can have 2 trains in section. I think this was put in when the S&C was full of coal trains from Ayrshire to Aire Valley power stations some years ago. (Not sure if there is IB southbound between Blea Moor and Settle Jct)
I do remember seeing diverted WCML trains on the S&C late 1970's. I saw a Cl 47 dragging an electric loco and set of newish Mk 3coaches passing Blea Moor box.
Not for much longer....Yet Carlisle-Glasgow gets diverts via Dumfries as well as buses taking similar or less time depending on pathing.
Yes we can I think. The Timetable Planning Rules shows different timing points in both directions which align to the sections. It would be very odd to split sections and not plan to them.I might be wrong, but I'm of the understanding that you can't plan trains to use the IB sections, they're left for the signaller to manage the service on the day. Theres other lines of route where additional services could and would be run but which get declined for the same reason.
I think that there would need to be a very big time disadvantage before the majority of passengers come out against the rail diversion.
The line still has a reasonable amount of freight... anda daily Carlisle to Chirk log train...
It is quicker for many passengers to just use ECML services instead, which is also a 'rail diversion'.I think that there would need to be a very big time disadvantage before the majority of passengers come out against the rail diversion.
Spot on, because I daresay in your country and mine, where there's a choice (not often in mine), prospective surface mode passengers prefer rail, even if it takes 45 minutes longer.
Too many have been stuck in traffic on what we call 'freeways/tollways' and you 'motorways'. One of my pet dislikes is being on a coach at 100kmh, with a large truck 'racing' it in the adjacent lane.
It is quicker for many passengers to just use ECML services instead, which is also a 'rail diversion'.
Which isn't an issue, or LNER would kick up a fuss whenever the WCML is blocked. Considering that goes both ways, operators deal with it.True to an extent, but then the ECML has its own passengers who need to be accommodated.
Which isn't an issue, or LNER would kick up a fuss whenever the WCML is blocked. Considering that goes both ways, operators deal with it.