D365
Veteran Member
- Joined
- 29 Jun 2012
- Messages
- 13,187
wikipedia has often claimed that several types of BR EMU are compatible, merely because they share the use of Tightlock couplers.
A 323 has occasionally rescued a 319 or vice versa. I don't have dates and times but I'm sure it has happened.Which still renders them incompatible.
Otherwise, we'd have seen 323s rescuing failed 319s and 769s.
To my knowledge, that's never happened. For a reason.
For the most part, everything from 313 to 322 is compatible, in terms of power and brake release. For example, 317s have worked with 313s to Hornsey and 315s to Ilford. They have worked with 322s in passenger service. Not sure about 321s but no reason why it wouldn't work in theory.wikipedia has often claimed that several types of BR EMU are compatible, merely because they share the use of Tightlock couplers.
769s are cleared both on the WCML and Chat Moss, having run ECS from both Wigan North Western and Manchester Victoria to Allerton via Newton-le-Willows, not St Helens Central, however this was in electric mode throughout.They've only been cleared on the routes they have booked work or empty stock moves over. Reliability issues and there not being enough of them about to perform a rescue. Network Rail want to keep them off the WCML as much as possible. They would only be able to run in diesel mode that way anyway so the fuel tanks probably wouldn't last a day.
What station ?.They have been cutting the embankment away and building the extension to Platform 1 this week while the trains have not been running.
Well it could have been either Hindley or Westhoughton.I am guessing Hindley?
Post 6587 above saysWhat happened with these in the end? There were rumours the other day that they'd all suddenly been stopped?
and RTT shows 769448 on 2O71 07:05 Southport to Manchester Oxford Road today (https://www.realtimetrains.co.uk/service/gb-nr:Y43260/2023-05-15/detailed#allox_id=0)That's only because of the Hindley engineering works, and them not being permitted to run via Chat Moss. They are expected to be back in service on 15th May.
Class 323's can rescue 319's both mechanically and electrically. It's been tested and works. 323's cannot rescue 769's electrically but can mechanically, same as 319's cannot rescue 769's electrically but only mechanically.Which still renders them incompatible.
Otherwise, we'd have seen 323s rescuing failed 319s and 769s.
To my knowledge, that's never happened. For a reason.
I remember an incident where a 319 sat down in Piccadilly throat with a failed motor-alternator and flat batteries, causing major disruption. Initially a 323 tried to rescue it, but was unable to release the brakes. Eventually another 319 was sent and performed the rescue successfully.Class 323's can rescue 319's both mechanically and electrically. It's been tested and works. 323's cannot rescue 769's electrically but can mechanically, same as 319's cannot rescue 769's electrically but only mechanically.
As well as not having to thrash the Diesel engines up the incline from Manchester Victoria to Ashton. Once that happens the only inclines they'd encounter on diesel are those between Bolton and Wigan.With Manchester to Stalybridge being wired they'll need to do fewer power change overs a day. Surely this will help with their reliability.
The way the diagrams work Monday-Friday is they do an Oxford road run then one Stalybridge runBut how often under the current diagrams do they visit Stalybridge? Are they not mostly used on the Oxford Road (formerly Alderley Edge) services?
As well as not having to thrash the Diesel engines up the incline from Manchester Victoria to Ashton. Once that happens the only inclines they'd encounter on diesel are those between Bolton and Wigan.
Thanks. IIRC the diagrams didn't use to interwork in Southport when services ran through to Alderley Edge.The way the diagrams work Monday-Friday is they do an Oxford road run then one Stalybridge run
All 4 diagrams go to Oxford Road twice and Stalybridge twice Monday-Friday
Saturdays are different with AN292 doing 2 Oxford Road runs in a row, but still somewhat follow the rule.
Saturdays:
AN291 - 2 Stalybridge, 1 Oxford Road
AN292 - 2 Stalybridge, 3 Oxford Road
AN293 and 294 - 2 Stalybridge, 2 Oxford Road
Indeed they didn't, found last year's diagrams hereThanks. IIRC the diagrams didn't use to interwork in Southport when services ran through to Alderley Edge.
It was reported last year (post #6523) that the power changeover software has been upgraded to fix the previous issues of failure during changeover. There is no power changeover at Wigan, where 769431 failed on Saturday.With Manchester to Stalybridge being wired they'll need to do fewer power change overs a day. Surely this will help with their reliability.
Cab air con and digital mods I think, from what I remember.Presumably the 769 fleet is being rotated through Wolverton two units at a time. Does anyone know the purpose of this work programme?
You can't change the fact that the trains are old and worn out.
The 319s are equally old and worn out, and have the same traction motors as the 769s, equally prone to flashover. Yet Northern manages to diagram 12 of its 15 319s to be in traffic Mon-Sat.Thrash a 769 and you have a motor flashover..
Ah, thanks.Cab air con and digital mods I think, from what I remember.
Possibly a little too speculative/anecdotal for some, but MAN engined vehicles aren't exactly viewed as beacons of reliability in the road transport sectors...The 769's woes cannot all be inherited from the 319.
Have they been authorised for that? When first introduced NR wouldn't let them run at MU speeds, so they were limited to 75mph on that section.I have travelled on a few Class 769s in recent weeks and they must get up to 90mph between Bolton and Salford Crescent. On diesel at the moment with no stop at Hindley they get a fair speed up towards Wigan.
Not just the same motors - in AC mode, a 769 is a 319.The 319s are equally old and worn out, and have the same traction motors as the 769s, equally prone to flashover.
Which is why we treat them exactly the same.The 319s are equally old and worn out, and have the same traction motors as the 769s, equally prone to flashover. Yet Northern manages to diagram 12 of its 15 319s to be in traffic Mon-Sat.
No. Still restricted to 75mph.I have travelled on a few Class 769s in recent weeks and they must get up to 90mph between Bolton and Salford Crescent. On diesel at the moment with no stop at Hindley they get a fair speed up towards Wigan.