Illogical and haphazard stations

Status
Not open for further replies.

Dai Corner

Established Member
Joined
20 Jul 2015
Messages
6,990
Suspect I'm one of the few here who remembers the "Brunel shed" in use at the end of steam, normally for Gloucester and Bath Green Park trains, and occasionally for Severn Beach, although the latter also crossed right across the station throat sometimes, as did through LMR-West of England trains. In quiet moments the spotters at the end of the platform would go for a walk right around the shed. It still had wooden platforms, there was a (foul?) smelling subway halfway along if your train was on the far platform, and a dilapidated signalbox perched high up in the structure which controlled the rarely-used buffer end crossovers. It was a fascinating, almost ghostly walk around, took maybe 15 minutes right round, and there was never anyone else there. The buffer ends must have been right high up against the main Temple Gate road.
I remember parking in there when I worked across the road in Templegate House. BR charged a lot less than NCP or the City Council!

I thought the building fronting Temple Gate contained offices?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,351
Location
Yorkshire
There's lots to praise about Leeds City, but one of the bugbears is how crowded the main footbridge gets. With hindsight, the rebuild should have included a large mezzanine floor at the height of the main bridge, but covering a much larger footprint above the through platforms and with access by escalators from the concourse where WHSmith is. This would have had plenty of space for circulation and retail outlets, and allowed for more stairs and escalators to each platform.
 

seaviewer

Member
Joined
3 Aug 2018
Messages
65
Norwood Junction is annoying, especially now it’s required to be used for interchange a lot more with Southern no longer serving Forest Hill line stations. So from East Croydon you get off on platform 3, and should be able to cross-platform to 2 to join northbound Overground, but instead have to go down the narrow subway (no step free) and cross to platform 1. It was a lot easier in the days of slammers, but also the 455s they used to open both sets of doors IIRC
Norwood Junction, I agree, is infuriating. You can arrive on the up fast to find your overground train waiting. But because the doors only open on one side, you have to trudge down and then up stairs, as you say.

Does anyone know why Southern trains stopped running from Norwood Jc to East Croydon on the slow lines?
 

Revaulx

Member
Joined
17 Sep 2019
Messages
526
Location
Saddleworth
There's lots to praise about Leeds City, but one of the bugbears is how crowded the main footbridge gets. With hindsight, the rebuild should have included a large mezzanine floor at the height of the main bridge, but covering a much larger footprint above the through platforms and with access by escalators from the concourse where WHSmith is. This would have had plenty of space for circulation and retail outlets, and allowed for more stairs and escalators to each platform.
The footbridge isn’t great, but the worst thing is access to Platform 17 which is absolutely atrocious. Even worse is that the opportunity to improve it was lost for ever when the hugely expensive Southern Entrance was created.
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,351
Location
Yorkshire
The footbridge isn’t great, but the worst thing is access to Platform 17 which is absolutely atrocious. Even worse is that the opportunity to improve it was lost for ever when the hugely expensive Southern Entrance was created.
Part of the reason that is so bad is how crowded platform 16 gets. It would make more sense to shift the TPE services to one of the other pairs of through tracks, and use 15 & 16 for less busy services. Certainly the P9/11 island isn't exactly rammed all day with other services using it. Might make movements through the throat a bit more complex, of course.
 

JD2168

Established Member
Joined
11 Jul 2022
Messages
1,720
Location
Sheffield
Meadowhall, if coming from the Barnsley line you have to walk across open ground then down a covered walkway. To get to the other platforms you have to go down steps or a ramp to reach it otherwise you end up walking towards the shopping centre bridge if you haven’t realised. The walkway from the Barnsley line is also slippery in wet weather.
 

Bartsimho

Member
Joined
17 Jan 2023
Messages
623
Location
Chesterfield
The modern St Pancras, for all its grandeur, is arguably not very logical, feeling like 4 separate stations all under one roof, with the MML and SE platforms like an afterthought, and the Thameslink platforms also separate.
Should have force SE to use their regular London Terminii. There are a lot more people to serve to the North of London than to the south. Also should have had some joined up thinking on HS1 with point work at Folkstone/Sandling to allow Kent High Speed trains to join and not have to travel a quarter of their journey parallel at slower speed and then some Up tracks off HS1 at Ebbsfleet.

Could even suggest rather than the White Elephant of Stratford International (and Regional Eurostar) one could have been built with full border controls close the Canary Wharf to target Business passengers, maybe on the Greenwich Peninsula with the Jubilee Line connecting Canary Wharf and the rest of London to it.

Who should be given more provision Kent with its 1.8 million people or the East Midlands with its 4.8 million people.

Eurostar should have been completely on the eastern side of the station with HS1 entering there.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,992
Location
London
Should have force SE to use their regular London Terminii. There are a lot more people to serve to the North of London than to the south. Also should have had some joined up thinking on HS1 with point work at Folkstone/Sandling to allow Kent High Speed trains to join and not have to travel a quarter of their journey parallel at slower speed and then some Up tracks off HS1 at Ebbsfleet.

Could even suggest rather than the White Elephant of Stratford International (and Regional Eurostar) one could have been built with full border controls close the Canary Wharf to target Business passengers, maybe on the Greenwich Peninsula with the Jubilee Line connecting Canary Wharf and the rest of London to it.

Who should be given more provision Kent with its 1.8 million people or the East Midlands with its 4.8 million people.

Eurostar should have been completely on the eastern side of the station with HS1 entering there.

Eh? The route is going through Kent, so why would you not utilise the High Speed lines if they are there? That's some very speculative thinking!
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,523
Location
Northampton
Should have force SE to use their regular London Terminii. There are a lot more people to serve to the North of London than to the south. Also should have had some joined up thinking on HS1 with point work at Folkstone/Sandling to allow Kent High Speed trains to join and not have to travel a quarter of their journey parallel at slower speed and then some Up tracks off HS1 at Ebbsfleet.

Could even suggest rather than the White Elephant of Stratford International (and Regional Eurostar) one could have been built with full border controls close the Canary Wharf to target Business passengers, maybe on the Greenwich Peninsula with the Jubilee Line connecting Canary Wharf and the rest of London to it.

Who should be given more provision Kent with its 1.8 million people or the East Midlands with its 4.8 million people.
This sounds an awful lot like inter-regional jealousy which really doesn't help anybody or anything. HS1 has been very handy for Kent additional junctions on HS1 weren't remotely sensible and extra tracks at Ebbsfleet have no real space to go anywhere. A new International station under Greenwhich would have been on it's own spur, so you'd have split the trains between termini and required another junction under London. All this to get a couple of extra platforms at St Pancras which while handy aren't exactly top of the list of priorities?
Eurostar should have been completely on the eastern side of the station with HS1 entering there.
Eurostar's platform length means it needs the whole trainshed length, and it can't go much further east without knocking down the wall. So you'd have released no real space for EMR by banning domestic HS1 trains.
 

Pigeon

Member
Joined
8 Apr 2015
Messages
1,123
Of course Victoria, London Bridge and Birmingham New St were originally two stations side by side and built by different companies. This history is still evident at Victoria while London Bridge and New Street have been totally rebuilt.

New Street still does show traces of it operationally. Things like trains arriving on the north side and then doing a circuit via Camp Hill, the Lifford curve and the BWS to form a service that departs from the south side, because it doesn't have the connectivity between one side and the other that a normal station would.

For a favourite weird station layout I might pick Holyhead (before they ate most of it, of course). That bifurcated layout is in a class of its own. I don't think it's either illogical or haphazard - I think it's highly logical and elegant, and a super bit of design - but many other examples people have given are better described as idiosyncratic rather than illogical or haphazard, and Holyhead is that all right.

As a layout that is senselessly inchoate I'd probably pick Holborn on the Piccadilly line. The mess they made of the divergence of the Piccadilly and Strand (Aldwych) routes reminds me of the kind of thing I produced at age 4, seeing how complicated and strange a configuration I could make by fitting my limited selection of plastic track pieces together in different ways, without regard for operational convenience or usability. I know the history of it and the various changes of plans and ownership that made it come out like that, but it doesn't explain how they could consider further ambitions for the Strand route as something which was too much right now but still a possible future project rather than as being abandoned completely, and yet approve a tunnel/track configuration which would have needed total rebuilding if anything in that line, little matter how minor, ever had gone ahead.
 

Bartsimho

Member
Joined
17 Jan 2023
Messages
623
Location
Chesterfield
I’ve always seen large numbers of passengers getting off and on the domestic HS1 services there when I’ve used them to Kent, so more of a pale grey elephant than a white one perhaps.
It was meant to have "Regional Eurostar" which never even looked like happening and its "International" despite the fact it isn't. How it gets away with the name is unbelievable. Ot cost a load of money to build and St Pancras is 10 mins down the line with better connectivity to everywhere but Canary Wharf.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,523
Location
Northampton
It was meant to have "Regional Eurostar" which never even looked like happening and its "International" despite the fact it isn't. How it gets away with the name is unbelievable. Ot cost a load of money to build and St Pancras is 10 mins down the line with better connectivity to everywhere but Canary Wharf.
Politicians tried to sell the 'international' idea, especially for the Olympics, but Eurostar said from Day 1 they wouldn't be stopping there.
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
It was meant to have "Regional Eurostar" which never even looked like happening and its "International" despite the fact it isn't. How it gets away with the name is unbelievable. Ot cost a load of money to build and St Pancras is 10 mins down the line with better connectivity to everywhere but Canary Wharf.
When I have got HS1 to Kent there is always a lot of people getting on and off at Stratford, similar numbers to using St Pancras - lot of people live in Stratford now, there are numerous destinations there, and it is very connected.
Not sure London would have got the Olympics without the station there either - remember them driving the IOC through the tunnels from St Pancras in Range Rovers?
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,523
Location
Northampton
When I have got HS1 to Kent there is always a lot of people getting on and off at Stratford, similar numbers to using St Pancras - lot of people live in Stratford now, there are numerous destinations there, and it is very connected.
The Javelin services to Stratford are very popular, but you could have built the station to a much simpler (i.e. Cheaper) design if it had been only about domestic services from the start.
Not sure London would have got the Olympics without the station there either - remember them driving the IOC through the tunnels from St Pancras in Range Rovers?
Don't think the half a train station was really what swung it. If HS1 hadn't been being built through there there'd have been some other plan for the passenger transport - we might have had Crossrail 10 years earlier!
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
The Javelin services to Stratford are very popular, but you could have built the station to a much simpler (i.e. Cheaper) design if it had been only about domestic services from the start.
Was it ever considered as a backup in case St Pancras was closed for some reason?
Don't think the half a train station was really what swung it. If HS1 hadn't been being built through there there'd have been some other plan for the passenger transport - we might have had Crossrail 10 years earlier!
'Some other plan' might not have beaten Paris, compared to a significantly completed, fast, extra, line between central London, Stratford, and the P&R at Ebbsfleet.
They had tunnels to show them, not something that probably wouldn't be ready in time and wasn't adding serious extra capacity at Stratford.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,523
Location
Northampton
Was it ever considered as a backup in case St Pancras was closed for some reason?
It was a purely political project. the Security scanning areas have never had the equipment fitted. I don't know if international passengers have ever been set down there, rather than turning at Ebbsfleet.
'Some other plan' might not have beaten Paris, compared to a significantly completed, fast, extra, line between central London, Stratford, and the P&R at Ebbsfleet.
They had tunnels to show them, not something that probably wouldn't be ready in time and wasn't adding serious extra capacity at Stratford.
Given how much of the Olympics wasn't actually at the Olympic park I don't think Stratford International swung it when the bid could have taken the quite reasonable option of running a special timetable to Stratford (regional), which they did anyway. Stratford also had the DLR and Jubilee Line extensions as part of the public transport elements of the bid. Other elements like the demountable or existing stadiums (good for greenwashing) and the sheer scale of the commercial opportunity provided by London in what were still economic rough times was probably a lot more important to the IOC than exactly which train lines were used.
 

eastwestdivide

Established Member
Joined
17 Aug 2009
Messages
3,407
Location
S Yorks, usually
It was meant to have "Regional Eurostar" which never even looked like happening and its "International" despite the fact it isn't. How it gets away with the name is unbelievable. Ot cost a load of money to build and St Pancras is 10 mins down the line with better connectivity to everywhere but Canary Wharf.
None of which makes it a white elephant (= something fancy but useless). At worst, it’s misnamed and has too much future-proofing.
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,262
Of cost a load of money to build and St Pancras is 10 mins down the line with better connectivity to everywhere but Canary Wharf.
Which is correct. Although we actually live at Canary Wharf, which is inner London, we always (pre-Lockdown) found it more efficient, and far quicker, to drive to Ebbsfleet and park there, rather than take a convoluted Underground route, with luggage, to St Pancras. Recent accounts of overcrowding and a poor boarding experience at St Pancras only add to a wish for Ebbsfleet to return.
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
Given how much of the Olympics wasn't actually at the Olympic park I don't think Stratford International swung it when the bid could have taken the quite reasonable option of running a special timetable to Stratford (regional), which they did anyway. Stratford also had the DLR and Jubilee Line extensions as part of the public transport elements of the bid.
Would they have been enough, particularly as they were busy lines/stations already, before adding Olympic traffic - the fact that they ran the Stratford Regional option anyway suggests that it wouldn't have been.

Its less that it swung it in a "wow, fast trains!" more that without it there might have been a black mark over transport, in a city famous for congestion and crowded public transport.
 

RailWonderer

Established Member
Joined
25 Jul 2018
Messages
2,217
Location
All around the network
I haven't seen anyone mention York. The Scarborough shuttles are sometimes on the through platform and the Liverpool - Newcastle does not use the same through platform as the LNERs to Scotland. The terminating platforms are in different places. Very pleasant station but confusing the first few times I went there.
 

Bartsimho

Member
Joined
17 Jan 2023
Messages
623
Location
Chesterfield
Which is correct. Although we actually live at Canary Wharf, which is inner London, we always (pre-Lockdown) found it more efficient, and far quicker, to drive to Ebbsfleet and park there, rather than take a convoluted Underground route, with luggage, to St Pancras. Recent accounts of overcrowding and a poor boarding experience at St Pancras only add to a wish for Ebbsfleet to return.
I thought about mentioning it but thought it too far outside London. Could the EL be extended to it with maybe lower frequency. (I.E Most continue to terminate at Abbey Wood but some go to Ebbsfleet to provide East End access to HS1 without going to a Terminii).
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,523
Location
Northampton
I thought about mentioning it but thought it too far outside London. Could the EL be extended to it with maybe lower frequency. (I.E Most continue to terminate at Abbey Wood but some go to Ebbsfleet to provide East End access to HS1 without going to a Terminii).
I believe its protected in long term plans, but it would require totally rewriting the North Kent line timetable and rebuilding the infrastructure at Abbey Wood.
 

daodao

Established Member
Joined
6 Feb 2016
Messages
3,601
Location
Dunham/Bowdon
I'll add a vote for Crewe. The station has never seemed intuitive to me - I think the arrangement of canopies and overall roofs doesn't help you navigate, especially the first time you use it.
I agree about Crewe, particularly if not using the main through platforms 5 and 6.

While it isn't illogical, Manchester Piccadilly is a combination of 3 stations serving 3 different historic lines (GCR/LNWR/MSJ&AR. Platforms 13 and 14, which now handle (IMO inappropriately) a large number of long-distance trains, are awkward to use and some distance from the main concourse, as is the "underground" Metrolink station.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,029
Location
St Albans
Given that the existing platforms at St Pancras were given over entirely to Eurostar, I'm not sure where else the EMR and South Eastern platforms could have gone! And as mentioned there is a road entrance right outside the Thameslink barrier line, which is particularly handy if coming from Euston via the back street route.
Those criticising certain aspects of St Pancras should ear in mind:
1) with exception of HS1 tracks, all approaches were fixed and had to be aligned within the station area and its existing throat.
2) The Thameslink platforms are among the most intensively used anywhere in the UK, and also have a high volume of interchange passengers.
3) The whole street level concourse is constructed in a barrel storage area constrained by a matrix of support columns spaced at about 3 metre intervals.
4) The Barlow trainshed, along with the Midland Hotel on Euston Road, together make the whole station a grade 1 listed structure, effectively preventing any significant modifications to the building.
5) The station is located in central London where land acquisition is incomparably expensive, - indeed, frequently impossible at any cost and the allocation of access, capacity and priority flows had to be based on traffic predictions at the time.
6) Those believing the myth that major projects in London have limitless funding are wrong, - in fact the level of funding was subject to endless scrutiny, not the least by those in power who were against railway development anywhere. So in my view, the resulting complexity of the station is a pretty good result given all that was working against it even happening at all.
 

Lewisham2221

Established Member
Joined
23 Jun 2005
Messages
2,750
Location
Staffordshire
I agree about Crewe, particularly if not using the main through platforms 5 and 6.
I don't understand what is illogical or haphazard about Crewe. The platforms are numbered logically from East to West and there is a footbridge connecting them all at both ends of the station; if catching a connection I tend to find it easier to use the southern footbridge. Generally speaking, trains depart from the corner of the station that corresponds with the immediate direction of travel. The most haphazard thing about the station is probably the lack of dedicated platforms (or even confined to one island) for London and Manchester trains, with the platforming for these services being more dependent on the origin station rather than the destination. However, as neither are exactly "turn up and go" frequency this isn't really an issue unless there's a short notice cancellation or delay which would require passengers to change platform to catch the next train to their destination.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,523
Location
Northampton
I don't understand what is illogical or haphazard about Crewe. The platforms are numbered logically from East to West and there is a footbridge connecting them all at both ends of the station; if catching a connection I tend to find it easier to use the southern footbridge. Generally speaking, trains depart from the corner of the station that corresponds with the immediate direction of travel. The most haphazard thing about the station is probably the lack of dedicated platforms (or even confined to one island) for London and Manchester trains, with the platforming for these services being more dependent on the origin station rather than the destination. However, as neither are exactly "turn up and go" frequency this isn't really an issue unless there's a short notice cancellation or delay which would require passengers to change platform to catch the next train to their destination.
Crewe certainly has an air of feeling like bits added on 'as and when', particularly Platform 6's extension and the Stoke line bays.
 

CyrusWuff

Established Member
Joined
20 May 2013
Messages
5,444
Location
London
Those criticising certain aspects of St Pancras should ear in mind:
1) with exception of HS1 tracks, all approaches were fixed and had to be aligned within the station area and its existing throat.
2) The Thameslink platforms are among the most intensively used anywhere in the UK, and also have a high volume of interchange passengers.
3) The whole street level concourse is constructed in a barrel storage area constrained by a matrix of support columns spaced at about 3 metre intervals.
4) The Barlow trainshed, along with the Midland Hotel on Euston Road, together make the whole station a grade 1 listed structure, effectively preventing any significant modifications to the building.
5) The station is located in central London where land acquisition is incomparably expensive, - indeed, frequently impossible at any cost and the allocation of access, capacity and priority flows had to be based on traffic predictions at the time.
6) Those believing the myth that major projects in London have limitless funding are wrong, - in fact the level of funding was subject to endless scrutiny, not the least by those in power who were against railway development anywhere. So in my view, the resulting complexity of the station is a pretty good result given all that was working against it even happening at all.
Not forgetting:
7) The post-HS1 configuration was essentially fixed pre-privatisation, before National Express were running MML and doubled the number of domestic IC services.

At one point, there was a proposal that Platform 5 could potentially be dual-purpose, with access from both the MML and Eurostar sides, but that obviously never happened.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,029
Location
St Albans
Not forgetting:
7) The post-HS1 configuration was essentially fixed pre-privatisation, before National Express were running MML and doubled the number of domestic IC services.

At one point, there was a proposal that Platform 5 could potentially be dual-purpose, with access from both the MML and Eurostar sides, but that obviously never happened.
I've never heard that, - how would it work, - ES requires a 760mm (ISTR) height whereas UK domestic would be something like 915mm? Unless there was a minimum width MML platform squeezed in on the western side and what is now P5 ES was slightly narrower.
Maybe the Home office objected because an athletic migrant might take a run at it and jump "illegally" into the UK landside.
 