What’s the big deal about Liz line taking over the relief lines instead of building their own? The government, NR and GWR all want it. Even if GWR didn’t want it, it sounds like they’d be running 2tph and it would look like a waste of money and space.
The announcement for the Stratford branch is currently played at Liverpool Street, will this remain in peak time for the train to Gidea Park? It doesn’t need to.
Unless you have access to confidential information you have no idea what the government, NR and GWR really want.
You obviously haven’t understood the ramifications of your statement as you have missed the freight operating companies from your list - they are also big users of the Great Western Main Line. This is a significant part of ‘the big deal’ as margins in the freight business are thin and additional costs will not help the freight operators to maintain or even expand their market. Restricting their hours of operation or their flexibility in timetabling will not in any way help increase railfreight’s market share in heavy goods, containers or, potentially, parcels services.
I am sure that this is not a result that you desire.
The other part of the ‘big deal’ is that the frequency of the Crossrail/Elizabeth line trains does not permit the Paddington - Didcot services to have an optimum path through Reading. As I wrote in an earlier post the Relief Lines west of Reading are also used by Cross-Country and the container trains from Southampton to the Midlands and points north with the result that both the westbound trains and one of the eastbound trains in each off-peak hour typically wait for between eight and thirteen minutes for a path.
You will be hard put to it to find a better way to encourage people to use a car than by making a journey longer than it need be in an area where off-peak the roads are not that congested. Maidenhead to Pangbourne takes about 30 to 40 minutes by car, typically the train now takes 36 minutes but could do it in around 25 minutes - as indeed it used to do. Rinse and repeat for other start/finish combinations.
Already the intensity of operations of the Crossrail/Elizabeth line near London has caused a distinct lowering of the quality of the local services in the upper Thames Valley through Reading. If TfL wants to increase the frequency even further then it should buy its own infrastructure and not make life more difficult for those living outside its area.
Given the plan was even with the additional running to Heathrow that there would be a residual GwR Didcot to paddington service calling at Ealing Broadway and Hayes. If the GwR service is withdrawn steps should be taken to replace it with a Elizabeth line service that provides a similar stopping pattern to the original GwR service to reading. Otherwise it is a loss of service for passengers westward from West Drayton
I wouldn't call the service 'residual' - for many years there has been a two trains per hour local service from Paddington to Didcot (and originally, Oxford). This has not changed...!
Westward of W. Drayton will get an additional Maidenhead terminator from November, so not really. Twyford retains the GWR stop.
Yes, the extra Maidenhead terminator fills some of the gap, but the changes now mean that to reach stations on the Great Western route between Slough and Paddington from the upper Thames Valley one or two changes of train will now be necessary whereas previously only one was needed to reach the lesser used stations such as Hanwell and the busier stations such as Hayes or Ealing Broadway could be reached directly. Sir James Milne would be turning in his grave!
Looking at this from the west it can only be described as a deterioration - it does not help to build back train travel.