Friday 28/12/90
Are you sitting comfortably? Then I’ll begin …
As usual, I was heading off from the UK to Poland for a steamy winter break, meeting up in Poland with various fellow cranks for different parts of the journey. As usual, a serious amount of pretty meticulous planning had gone into all this, plotting a route across the Netherlands and West Germany that allowed me to sample some interesting track and traction, then over the border into East Germany, and finally Poland. Saying farewell to wife and sons, I headed off …
43166 + 43030 1819 Reading – Paddington
Taxi to Liverpool Street (I guess the Tube wasn’t functioning, and I had a big heavy bag).
I was aiming for the 1935 Liverpool Street – Harwich Parkeston Quay, connecting into the 2130 Koningen Beatrix to Hoek van Holland on which I had booked a cabin. The first excitement was the unexpected running of a 1927 relief service to Harwich. What would that be, I wonder? Turned out to be a pair of 321 units. Thanks, but I’ll do the 86/2 instead. I boarded the boat train proper with 86218, noting as I did so that about 20 minutes before booked departure time they were warning anybody who doesn’t have a confirmed reservation for the boat not to attempt to travel. Unusual. Must be a bit busy …
86218 1935 Liverpool Street – Harwich Parkeston Quay
On arrival at Parkeston Quay I was met by the rare – possibly unique – sight of three large passenger vessels all tied up alongside. There was the Tor Scandinavia ex Gothenburg, my ship the Koningen Beatrix for Hoek van Holland … and the St Nicholas which at that time should have been on the other side of the North Sea forming the night sailing from Hoek van Holland to Harwich!
It transpired that whist docking at Harwich that morning the St Nicholas had struck the quay and damaged a propellor. After some repairs, the 1130 for Hoek van Holland had eventually set sail at 1630, only to shudder to a standstill in the North Sea, then limp back to Harwich (with a full load of passengers) for further repairs. Thanks to rough weather in the North Sea, both the Tor Scandinavia and the Koningen Beatrix were delayed by several hours arriving, meaning that all three vessels had only just arrived at Harwich in the space of a single hour.
So, in summary, when I arrived at Harwich there were:
3+ trainloads of people (including me) trying to board the ships;
2 shiploads of delayed people trying to board the trains; and
1 extra shipload of people trying to leave their failed ship, do a U turn, and board a vessel on which they had no reservations!
Of course, everybody was carrying more luggage than usual, it being that time of year.
Now you would think that the ferry and port operators, Sealink Stena Line, would come to the rescue and sort out the chaos. Well, by some horrible coincidence, they had announced massed compulsory redundancies amongst the port staff just before Christmas (what thoughtful and considerate timing), and today was the last scheduled day at work for many of those staff. When the managers tried to round up people to work overtime to help them out of this mess, their responses were utterly predictable. I think the word “OFF” may have featured quite prominently in the conversations.
It wasn’t until fully two hours after I arrived in Harwich – during which time I had stood wedged shoulder to shoulder alongside everybody else in the waiting area - that eventually some semblance of organisation started occurring. A senior Sealink Stena Line manager announced that he wanted volunteers to spend the night in the St Nicholas, where they would have a free shower and cabin, before sailing tomorrow morning (24 hours late) after repairs were completed.
Eventually boarding started on the Koningen Beatrix, and I claimed my pre-booked cabin, then went for a (very) late night meal in the Rembrandt restaurant. We sailed shortly after midnight, or about two and a half hours late. I retired to my cabin and got my head down, knowing full well that my elaborately planned and carefully researched bash had just been eviscerated at the first contact with reality. This was an eventful start to what was to be an event-filled bash around Poland. (Maybe the details of that will appear in another thread some day).
_________________________________________________________________________________________
Tuesday 28/12/93
Steam on the Brighton Main Line:
43030 + 43134 1427 Reading – Paddington
75069 1600 Victoria – Brighton via Redhill
3478 Brighton – Hove (actually) & 1748 return
75069 1958 Brighton – Victoria via Quarry Line
43032 + 43144 2200 Paddington – Reading
Wednesday 28/12/94
3405 + 3524 Reading – Clapham Jn
35028 1003 Clapham Jn – Exeter St Davids
I think this might have been some sort of one-way stock positioning special. I’m not sure.
43102 + 43191 1551 Exeter St Davids – Plymouth
Monday 28/12/98
Getting from Plymouth to Reading via the “scenic” route:
43186 + 43017 1200 Plymouth – Exeter St Davids
47712 1246 Exeter St Davids – Birmingham New Street via Weston Super Mare, Camp Hill
This was the 1140 Plymouth – Liverpool, starting from Exeter 30’ late after connecting out of the above service. I stuck with the train through to Crewe via Nuneaton:
47844 1653 Birmingham New Street – Nuneaton, 10 -> 30’ late.
86225 1733 Nuneaton – Crewe, still 30’ late.
At Crewe, the purpose of my lengthy diversion produced:
37421 2016 Crewe – Birmingham International via Rugeley, Cannock, Stechford
This Cannock diversion was new 37/4 track for me south of Stafford (hence my travelling half the length of the country to cover it).
90014 2208 Birmingham International – Euston
(Tuesday 29/12/98)
158 865 0045 Paddington – Reading