• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Brigg Line - What’s the point?

Status
Not open for further replies.

Llandudno

Established Member
Joined
25 Dec 2014
Messages
2,753
Location
Matlock
Visited Cleethorpes yesterday to watch a football match (yes, I know!) and thought I would try the Saturday only Sheffield-Brigg-Cleethorpes line.

This Northern operated route runs three round trips on Saturdays and does not operate on any other days, it means that Gainsborough Central, Kirton Lindsey and Brigg stations are only open one day per week!

What is the point of this ‘service’ and when is the last time that a six or seven day passenger service operated on this route?
Is there much freight traffic on this line?

I guess that this is now the only Northern operated service that serves Grimsby and Cleethorpes so presumably only a limited number of train crew sign this route?

For info the mid morning 2 car 158 departure was approx 80% full seating capacity wise leaving Sheffield, but I doubt no more than 20 people travelled east of Retford, mainly football fans.

The 1917 return a 2 car 150 had around 15 passengers leaving Cleethorpes/Grimsby, of which nearly all were returning from the match. Some local passengers boarded west of Retford.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

clagmonster

Established Member
Joined
8 Jun 2005
Messages
2,442
Essentially, the point is to avoid expensive closure processes.

There are 25 each of drivers and guards who sign the link, the top Northern link at Sheffield.

The last weekday passenger service ran in 1993.

What I do think would make the existing service more strategically useful would be to transfer it to TPE, thus allowing their Cleethorpes and Sheffield traincrew to maintain route knowledge for diversionary purposes. Northern get nothing out of the route at present.
 

Wolfie

Established Member
Joined
17 Aug 2010
Messages
7,441
Essentially, the point is to avoid expensive closure processes.

There are 25 each of drivers and guards who sign the link, the top Northern link at Sheffield.

The last weekday passenger service ran in 1993.

What I do think would make the existing service more strategically useful would be to transfer it to TPE, thus allowing their Cleethorpes and Sheffield traincrew to maintain route knowledge for diversionary purposes. Northern get nothing out of the route at present.
Re your first sentence l would assume, if plans are to cut railway expenditure, that litigation to change that situation would likely be a precursor.
 

The Quincunx

Member
Joined
12 Dec 2011
Messages
141
Location
Atherstone
Essentially, the point is to avoid expensive closure processes.

There are 25 each of drivers and guards who sign the link, the top Northern link at Sheffield.

The last weekday passenger service ran in 1993.

What I do think would make the existing service more strategically useful would be to transfer it to TPE, thus allowing their Cleethorpes and Sheffield traincrew to maintain route knowledge for diversionary purposes. Northern get nothing out of the route at present.
Closures are not expensive.
 

Iskra

Established Member
Joined
11 Jun 2014
Messages
10,729
Location
West Riding
It’s a nice jolly for fish and chips for the Northern crew that sign it.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,414
Location
Yorks
Essentially, the point is to avoid expensive closure processes.

There are 25 each of drivers and guards who sign the link, the top Northern link at Sheffield.

The last weekday passenger service ran in 1993.

What I do think would make the existing service more strategically useful would be to transfer it to TPE, thus allowing their Cleethorpes and Sheffield traincrew to maintain route knowledge for diversionary purposes. Northern get nothing out of the route at present.

The thinking out in 1993 was part of the fattening up for privatisation and sell off. It should have had a proper service restored decades ago.
 

Dr Hoo

Established Member
Joined
10 Nov 2015
Messages
5,703
Location
Hope Valley
The thinking out in 1993 was part of the fattening up for privatisation and sell off. It should have had a proper service restored decades ago.
I think that Regional Railways had more pressing financial and resource issues in 1993 than this being some government-inspired "fattening up" exercise.

(I am not clear how cutting services to one day per week, not to mention broadly simultaneous cuts on lines like Whitby and Knottingley-Goole constituted "fattening up" either.)

The route has been heavily used for freight diversions during various times when the line via Scunthorpe has been unavailable, which is by its greatest strategic benefit.
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,372
Location
Yorkshire
Wasn't a weekday service as far as Gainsborough Central introduced (or planned to be introduced) not long before Covid hit?
 

Heaps92

Member
Joined
3 Sep 2018
Messages
129
Freight runs down this way when scunthorpe is shut for possession work its also cheaper to path trains this way due to how quiet it is
 

HST43257

Established Member
Joined
10 Apr 2020
Messages
1,650
Location
York
Wasn't a weekday service as far as Gainsborough Central introduced (or planned to be introduced) not long before Covid hit?
Yep it allowed the Lincoln Northerns to be faster between Sheffield and Worksop
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,061
Location
Reston City Centre
What I do think would make the existing service more strategically useful would be to transfer it to TPE, thus allowing their Cleethorpes and Sheffield traincrew to maintain route knowledge for diversionary purposes. Northern get nothing out of the route at present.

That seems reasonable (if we must continue to run the current level of services on the line)

The thinking out in 1993 was part of the fattening up for privatisation and sell off. It should have had a proper service restored decades ago.

"Everything great that happened under BR was because BR was brilliant, but everything bad that happened under BR was because of the nasty Government forcing them to"

I wish I could find an uncomplicated love to match the adoration you have for BR...

Wasn't a weekday service as far as Gainsborough Central introduced (or planned to be introduced) not long before Covid hit?

Yeah, it was hourly from Sheffield (with the Leeds - Lincoln service running non stop from Sheffield to Worksop, so that the "local" passengers used the service that terminated at Gainisborough)

One oddity of this is that I'd believed for years that the reason why the Lincoln - Sheffield trains ran through to Huddersfield/ Leeds/ Doncaster/ Adwick/ Scunthorpe etc was because there was a requirement for an hourly service from the "south Rotherham" stations like Kiveton to Meadowhall - but the new services saw this link removed since the "south Rotherham" trains terminated at Sheffield Midland)
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,414
Location
Yorks
That seems reasonable (if we must continue to run the current level of services on the line)



"Everything great that happened under BR was because BR was brilliant, but everything bad that happened under BR was because of the nasty Government forcing them to"

I wish I could find an uncomplicated love to match the adoration you have for BR...



Yeah, it was hourly from Sheffield (with the Leeds - Lincoln service running non stop from Sheffield to Worksop, so that the "local" passengers used the service that terminated at Gainisborough)

One oddity of this is that I'd believed for years that the reason why the Lincoln - Sheffield trains ran through to Huddersfield/ Leeds/ Doncaster/ Adwick/ Scunthorpe etc was because there was a requirement for an hourly service from the "south Rotherham" stations like Kiveton to Meadowhall - but the new services saw this link removed since the "south Rotherham" trains terminated at Sheffield Midland)

Yet on another thread you're complaining that electrification is too expensive, something that has happened as a result of privatisation.

You defend privatisation to the hilt, but you don't you can't justify the cost hikes as a result of it !
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,372
Location
Yorkshire
One oddity of this is that I'd believed for years that the reason why the Lincoln - Sheffield trains ran through to Huddersfield/ Leeds/ Doncaster/ Adwick/ Scunthorpe etc was because there was a requirement for an hourly service from the "south Rotherham" stations like Kiveton to Meadowhall - but the new services saw this link removed since the "south Rotherham" trains terminated at Sheffield Midland)
The Meadowhall link was certainly at the very least a "happy consequence" of linking those services, but I'm not sure how much it was the principal driver. One of the reasons Northern (under various operators) had so many seemingly odd through services, was to get as much out of their fleet as possible.
The Huddersfield to Lincoln link is set to return in the future on Sundays only, meaning that one day a week Huddersfield will see 195s in service.
 

D6130

Established Member
Joined
12 Jan 2021
Messages
9,128
Location
West Yorkshire/Tuscany
Back in the day, the Brigg line was part of the quickest and most direct route from Sheffield - and for that matter, Manchester - to Grimsby and Cleethorpes and was very busy with holiday traffic during the Summer months. However, the almost terminal decline of UK seaside holidays from the early 'sixties onwards rendered it virtually surplus to requirements, as it made economic sense to send the remaining traffic via the longer and slower route which served the much larger population centres of Doncaster and Scunthorpe. IIRC, the is/was a cement works at Kirton Lindsey which was once rail-served, but no longer.
 

Peterthegreat

Established Member
Joined
22 Feb 2021
Messages
1,802
Location
South Yorkshire
I think that Regional Railways had more pressing financial and resource issues in 1993 than this being some government-inspired "fattening up" exercise.

(I am not clear how cutting services to one day per week, not to mention broadly simultaneous cuts on lines like Whitby and Knottingley-Goole constituted "fattening up" either.)

The route has been heavily used for freight diversions during various times when the line via Scunthorpe has been unavailable, which is by its greatest strategic benefit.
The reason the service was cut, along with those on the S & K, Knottingley to Goole and the Whitby line was the government's refusal to permit RRNE more second generation dmus.
 

Class 466

Established Member
Joined
5 Mar 2010
Messages
2,143
Location
Atherton, UK
Visited Cleethorpes yesterday to watch a football match (yes, I know!) and thought I would try the Saturday only Sheffield-Brigg-Cleethorpes line.

This Northern operated route runs three round trips on Saturdays and does not operate on any other days, it means that Gainsborough Central, Kirton Lindsey and Brigg stations are only open one day per week!

What is the point of this ‘service’ and when is the last time that a six or seven day passenger service operated on this route?
Is there much freight traffic on this line?

I guess that this is now the only Northern operated service that serves Grimsby and Cleethorpes so presumably only a limited number of train crew sign this route?

For info the mid morning 2 car 158 departure was approx 80% full seating capacity wise leaving Sheffield, but I doubt no more than 20 people travelled east of Retford, mainly football fans.

The 1917 return a 2 car 150 had around 15 passengers leaving Cleethorpes/Grimsby, of which nearly all were returning from the match. Some local passengers boarded west of Retford.
Gainsborough Central gets a weekday service to Sheffield, why not just run it through all week?
 

Wolfie

Established Member
Joined
17 Aug 2010
Messages
7,441
I think that Regional Railways had more pressing financial and resource issues in 1993 than this being some government-inspired "fattening up" exercise.

(I am not clear how cutting services to one day per week, not to mention broadly simultaneous cuts on lines like Whitby and Knottingley-Goole constituted "fattening up" either.)

The route has been heavily used for freight diversions during various times when the line via Scunthorpe has been unavailable, which is by its greatest strategic benefit.
I would imagine that the OP would argue that the public sector made the unpopular cuts which made the books look better.
 

Dr Hoo

Established Member
Joined
10 Nov 2015
Messages
5,703
Location
Hope Valley
The reason the service was cut, along with those on the S & K, Knottingley to Goole and the Whitby line was the government's refusal to permit RRNE more second generation dmus.
I would imagine that the OP would argue that the public sector made the unpopular cuts which made the books look better.
I will be accused of turning this into a 'north v south' argument but would mention that Regional Railways had 'enough' Class 158s on order to cover its (diesel) plans through various cascades but a significant slice was diverted to Network SouthEast as Class 159s for the Waterloo-Salisbury-Exeter service. This made cuts such as the Brigg line inevitable.
 

adrock1976

Established Member
Joined
10 Dec 2013
Messages
4,450
Location
What's it called? It's called Cumbernauld
With the Restoring Your Railway project, one of the suggestions has been to extend the Sheffield - Gainsborough Central to Barton-on-Humber every second hour, which would restore daily passenger trains to Kirton-in-Lindsey and Brigg as well as direct trains from Barton to destinations westwards.

Also, from my observations, there are community groups in that part of Lincolnshire that do their best to promote the line in spite of the three journeys each way on one day of the week.
 

Wolfie

Established Member
Joined
17 Aug 2010
Messages
7,441
I will be accused of turning this into a 'north v south' argument but would mention that Regional Railways had 'enough' Class 158s on order to cover its (diesel) plans through various cascades but a significant slice was diverted to Network SouthEast as Class 159s for the Waterloo-Salisbury-Exeter service. This made cuts such as the Brigg line inevitable.
Absolutely true, still Government cost saving, BR was told to find alternatives for down South. Not about to argue the merits as l know too little about the finances.
 

XAM2175

Established Member
Joined
8 Jun 2016
Messages
3,471
Location
Glasgow
The thinking out in 1993 was part of the fattening up for privatisation and sell off. It should have had a proper service restored decades ago.
Would you care to explain how cutting the service to Saturdays only contributed to 'fattening up for privatisation'?
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,852
Location
West of Andover
The Meadowhall link was certainly at the very least a "happy consequence" of linking those services, but I'm not sure how much it was the principal driver. One of the reasons Northern (under various operators) had so many seemingly odd through services, was to get as much out of their fleet as possible.
The Huddersfield to Lincoln link is set to return in the future on Sundays only, meaning that one day a week Huddersfield will see 195s in service.
Huddersfield to Lincoln already runs on Sundays, normally formed of a 150.

Unless Northern has plans to run 2 coach 195s towards Huddersfield on Sundays instead?
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,414
Location
Yorks
Would you care to explain how cutting the service to Saturdays only contributed to 'fattening up for privatisation'?

Basically the Government thinned out some services prior to privatisation to make the franchises more popular for franchisees.

Same thing happenned to the Whitby line as well.
 

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,824
Location
SW London
Back in the day, the Brigg line was part of the quickest and most direct route from Sheffield - and for that matter, Manchester - to Grimsby and Cleethorpes
It was part of the original Manchester Sheffield & Lincolnshire railway's main line from Manchester to Immingham Docks, completed in 1849. The more northerly route, including the bridge over the Trent at Keadby, was only opened in 1866, primarily to serve the recently discovered iron ore deposits at Scunthorpe.
 

The Quincunx

Member
Joined
12 Dec 2011
Messages
141
Location
Atherstone
Only if no one objects to the closure. I am sure if this were proposed for the Brigg line there would be a significant number of objections in spite of it arguably being of very little value as it stands today.
There is no longer any ability to "object" to a closure - all you can do nowadays is make a representation. Nor does the local rail users consultative committee (if such things still existed!) have any power to hold a public hearing to investigate hardship, like they used to. All those comments you expect would be dealt with in the response to representations published by DfT.
 
Status
Not open for further replies.

Top