South west trains havent had a problem with the 3rd rail on this round of snow.
Not true. All SR TOCs have had 3rd rail problems of some type or other, some worse than others.
South west trains havent had a problem with the 3rd rail on this round of snow.
South west trains havent had a problem with the 3rd rail on this round of snow. The delays came from frozen points or stock/crews displaced. While southern was fully suspended thursday southwest trains for most of the day was running within 15 minutes of time.
would it really be more costly to make modern trains draggable by the local diesel locomotives
I just can't see why this mad situation was allowed to happen in the first place.
I can't believe that we have certain trains that can't be dragged by other trains (even the fact that 222s can't drag 221s). It seems bizarre not to insist all new trains have a standard that will be compatible with other trains.
I just can't see why this mad situation was allowed to happen in the first place.
Stanier and Gresley coupled (sorry) with a lack of until recently any centralised rolling stock ordering going on. At least that is where I would lay the blame.
And where are all these diesel locos suddenly going to materialise from...? The only diesel locos I've seen since the snows came were the four EWS Sheds down at Broxbourne for the RHTT's. Even if you could use these to drag units in passenger service you would still be looking at a vastly reduced timetable.
Even before privatisation and the introduction of modern units there wouldn't have been sufficient locos or diesel units to replace the electrically operated services. Say what you like, but nostalgia just ain't what it used to be. Going back to these times wouldn't suddenly save the service from this type of disruption.
O L Leigh
And where are all these diesel locos suddenly going to materialise from...? The only diesel locos I've seen since the snows came were the four EWS Sheds down at Broxbourne for the RHTT's. Even if you could use these to drag units in passenger service you would still be looking at a vastly reduced timetable.
Even before privatisation and the introduction of modern units there wouldn't have been sufficient locos or diesel units to replace the electrically operated services. Say what you like, but nostalgia just ain't what it used to be. Going back to these times wouldn't suddenly save the service from this type of disruption.
O L Leigh
Perhaps they should buy all those class 56s which DBS recently sent for scrap. They seemed to be the only things capable of moving trains on the Southern region in 1987 and 1991 during the worst of the snow. And how about a requirement for a standard coupling on all rolling stock (eg buckeye or tightlock).
to me a standard coupling is something obvious![]()
to me a standard coupling is something obvious![]()
Can you imagine if Hornby built model trains where only certain types of rolling stock had couplers that were compatible with others?
No disagreement there if you also add in a multiple working standard, even if only a basic one. Then any kind of traction could assist another.
Trouble is those particular horses have long since bolted over the horizon.....
This wouldn't happen anyway as it would cost far too much money.
Aye- Putting overheads on the Southern* should only be done once pretty much the rest of the UK has been done. Having said that, I'd start with the Thameslink routes, Overground routes and the Southern Trains route from Milton Keynes- ie Dual Voltage routes first. Southwestern sector would be the last to go OHL (if there's any sense).
*as in the old region, not the TOC- oh, and Merseyrail for that matter
TBH I'd put it well behind re-opening some of our missing links (see other thread re lines to be re-opened).
Or electrifying Oxted-Uckfield, Ashford-Hastings and Wokingham-Reigate
Or electrifying Oxted-Uckfield, Ashford-Hastings and Wokingham-Reigate
Very well and much better than National Rail. Looking at the report for last Thursday there were very few delays or problems caused by the bad weather aside from a few things freezing up and delays on the Jubilee line because of door problems caused by the freezing weather.Out of curiosity, how do the (non-underground) stretches of the London Underground cope with icy conditions?
MrC i worked a Guildford and Chessington South Thursday and 3 kingston rounders yesterday and the only problems i encounted was a points failure at guildford and congestion of trains out of waterloo because the platforms was full we had no problems atall with the 3rd rail.