I recall about 20 years ago, that a company First North West? ran trains for a while from Blackpool but were not allowed to stop at Preston.
That was fine as they did stop at my local station Euxton! Shame no mention of stopping here on the proposed new service.
Will Virgin be able to block the proposal to stop at Preston? If so, is the proposal still viable?
North Western Trains used to run 158 operated Blackpool-Londons. They were to move to Class 180 operation after First group bought out the franchise and had placed the Class 175 order for North West regionals but Virgin insisted on competition protection but the 180s were still ordered and went to First Great Western instead.
--- old post above --- --- new post below ---
is there any point when preston has enough trains to london anyway, so blackpool users can just change once?
also hartford? crewe..
How often do you make journeys when you change trains? I've experienced problems where a delay of under 15 minutes to one service adds an hour to my overall journey time. If that happens to someone a few times it's puts them off using the train or makes them want to drive to a station where they can get a direct train.
When a Liverpool-London service used to do a Hartford call at around 6am it got over 100 passengers using the service as many Cheshire business people drove to Hartford to catch that train. Virgin, however, removed Hartford from it's calling points as they didn't see the point of having intercity calling points at both Runcorn and Hartford.
--- old post above --- --- new post below ---
Completely academic though because there are none available, which is why various proposals for the ECML using 180s have already been kicked into touch by ORR, on DfT's instructions.
So have the 5 that East Coast don't want actually been allocated to an operator?
Grand Central do have 180s as it stands so if they get new paths they could use the existing 180s on the new paths if they decided that it was the best option.
--- old post above --- --- new post below ---
Whilst it could certainly increase delays in theory, none of these open access operators would be using the fast lines as they are not operated by 125mph tilt stock.
GNWR (Alliance Rail) are proposing 140mph Polaris' which would be dual powered and tilting enabled, so if anything provided they get built they'd be an improvement on the Pendolinos. Grand Central have looked at ordering the same type of train but whether they ever order them is another matter.