That would (possibly) be logical. Therefore it probably isn't what's happened!Maybe, although it could also be that HS2 have been told to halt whilst others look at the bigger picture with regards NPR/HS3.
That would (possibly) be logical. Therefore it probably isn't what's happened!Maybe, although it could also be that HS2 have been told to halt whilst others look at the bigger picture with regards NPR/HS3.
Start in the north with NPR type services possibly, building 2A and B before 1 with the intention of heading south makes no sense as discussed many times.So everyone who said it should start from the North were entirely correct!
It makes perfect sense if you live in the North and want more than an even chance of getting to London on a HS train.Start in the north with NPR type services possibly, building 2A and B before 1 with the intention of heading south makes no sense as discussed many times.
It makes perfect sense if you live in the North and want more than an even chance of getting to London on a HS train.
If you live in Manchester or anywhere in the NW, you will be able to get to London on a high-speed train as soon as HS2 phase 1 opens.It makes perfect sense if you live in the North and want more than an even chance of getting to London on a HS train.
So everyone who said it should start from the North were entirely correct!
Back north again?No they weren't. Where would the trains from the north go once HS2 runs out?
Back north again?
Its more likely that the penny has dropped that Leeds is only 40 miles from Manchester and it makes absolutely no sense building duplicate high speed lines north of BirminghamMaybe, although it could also be that HS2 have been told to halt whilst others look at the bigger picture with regards NPR/HS3.
Curzon Street I assume. Unless I'm missing what "build it from the north first" means. I thought it was building the Manchester/Leeds to Birmingham legs first.....so what station would they turn back at?
That must be at least two-thirds of the total mileage that he's asking for.Curzon Street I assume. Unless I'm missing what "build it from the north first" means. I thought it was building the Manchester/Leeds to Birmingham legs first.
I quite agree. There's really no need for a line to ManchesterIts more likely that the penny has dropped that Leeds is only 40 miles from Manchester and it makes absolutely no sense building duplicate high speed lines north of Birmingham
Curzon Street I assume. Unless I'm missing what "build it from the north first" means. I thought it was building the Manchester/Leeds to Birmingham legs first.
I'm not saying it's a good idea from an economic or engineering point of view.So, to build that would represent building around 2/3 of the total HS2 route mileage, and including most/all of the Delta Junction complex... but you'd only be able to operate at most 25% of the eventual full HS2 service, until the route to/from Euston is done.
Building HS2 from the north down would have been a strong signal that that wasn't the case.
Or, build all the stages at once, but I guess there aren't enough resources for that.
London-York via HS2 eastern leg is less than 30min faster than via ECML, so I would guess going via Manchester and NPR would be slower. This is also part of the reason why HS2 eastern leg is more difficult to justify than the western leg.What is the time penalty likely to be of going via Manchester v the eastern leg and the existing ECML? Not only from Leeds, but from York and Newcastle which as I understand were due to be served by HS2 trains.
If the needs of London and the Southeast had been centric HS2 would never been built. Speeds on the WCML would have been reduced and trains would have been extended to 12 cars with 2 + 2 seating throughout to enhance capacity.I'm not saying it's a good idea from an economic or engineering point of view.
But megaprojects have a political dimension too. Building HS2 from London first was seen as neglecting the needs of the north, and I strongly suspect the pause in work on Phase 2B will be seen the same way. HS2 opponents have long said it's a London-centric project and now it looks like they might be right.
Building HS2 from the north down would have been a strong signal that that wasn't the case.
Or, build all the stages at once, but I guess there aren't enough resources for that.
The question is, will HS2 trains have Alan Bennett class?This conversation is starting to remind me of the Hale and Pace "Yorkshire Airlines" sketch
The Journey time for Euston to Manchester Picc is given by HS2 as 67 minutes.What is the time penalty likely to be of going via Manchester v the eastern leg and the existing ECML? Not only from Leeds, but from York and Newcastle which as I understand were due to be served by HS2 trains.
With the number of trains reversing it is likely you could adopt London Underground practice and have drivers change trains instead of changing ends.3 minutes for a station call and reversal at Manchester Piccadilly HS2 station seems too short for a London-Leeds service.
Practically it would need to be about 8 minutes, with a high turnover of passengers.
What is the current fastest train?Piccadilly to Leeds via the new line will be 30 mins.
This seems like a very busy arrangement for a route that is supposed to quell congestion. I feel like what they may try and do is combine the costs of the eastern leg from Toton and NPHR and deliver it as a single scheme.3 minutes for a station call and reversal at Manchester Piccadilly HS2 station seems too short for a London-Leeds service.
Practically it would need to be about 8 minutes, with a high turnover of passengers.
Reversing inter city trains en route at major stations seems like a step backwards.
I suppose there might or might not be a triangular arrangement in/near Manchester for through trains (or the route might loop under the city centre).
Tends to be around the 54 minute mark Victoria to Leeds, 56 from Picc.What is the current fastest train?
I assumed that NPR would be in a tunnel under Picc and turn Eastwards sharply after leaving. I don't know what the current plans are but a reversal would be less than ideal.3 minutes for a station call and reversal at Manchester Piccadilly HS2 station seems too short for a London-Leeds service.
Practically it would need to be about 8 minutes, with a high turnover of passengers.
Reversing inter city trains en route at major stations seems like a step backwards.
I suppose there might or might not be a triangular arrangement in/near Manchester for through trains (or the route might loop under the city centre).
Many thanks, will post a new updated messagePiccadilly to Leeds via the new line will be 30 mins.
| Journey (times in minutes) | Today (typical) | HS2 Eastern Leg | HS2 + NPR via Manchester |
| London to Leeds | 135 | 81 | 105 |
| London to York | 110 | 84 | 125 |
| Birmingham to Leeds | 120 | 49 | 70 |
| Birmingham to York | 120 | 57 | 95 |