What’s the point of trying to break any record? Showing it can be done.
Aside from the publicity, and the charity, it has also been a useful learning exercise for many people.
It was a record breaking 'attempt'. Like all record breaking attempts, there is a risk that the record might not be achieved.
In reality the APT record was run under very different circumstances. The Pendolino was 10 mins up on the APT record by Crewe demonstrating the benefits of WCML remodelling south of there - as acknowledged above.
From Crewe northwards, the APT (free of any speed supervision safety devices) and given dispensation to run at well over the loco hauled speed limits of the time and way more than 125mph - literally flew through the northern section of the WCML. It is reckoned that speeds through places such as Quintinshill Shap and Beattock which are currently less than 100mph for todays trains would have been negotiated by APT at much higher speeds.
Those with an understanding of the route and comparing the fastest recorded point to point times - knew that this was going to be a very very tight bid to beat the APT record - as it proved.
I'm looking back at the speed profile and not seeing any time deficit at Stafford in-spite of claims we had to slow down there . We went though at 85mph - which is the permitted limit.
Carstairs 1.5 mile 50mph TSR was known about and planned in.
The planners had this scheduled for 3 h53 - knowing the record was 3 h52 and 40s. So clearly they were spot on the money. I'm guessing they hoped a few seconds here and there would be gained en-route. I do believe that if they believed there was another half a minute to be gained, then the schedule would have reflected that.
The 'inside' story is promised to the Railway magazine first - and then we can hopefully share some more data once that is published. But let me be clear here that it is 'known' that one or two operational decisions and a couple of path tweaks could have secured the record.
Of course this could be attempted in future and on the day any number of other issues can crop up that will scupper it.
Hats off to everyone involved that this attempt almost ran like clockwork!
I for one am privileged to have sat on a train London to Glasgow that was 20 secs shy of the APT record.
It demonstrates 3 things.
1. What a beast the APT actually was - greater tilting ability and higher speeds through the twisty bits - to run that northern section 10 mins faster than today.. Wow - that would have been an experience. Todays's Pendolino spec might be slightly toned down, but what a reliable train that has proved to be and a worthy successor.
2. The WCML upgrade scheme has not only delivered a railway that is 10 mins quicker at the Southern end, but also delivered greater capacity and frequency.
3. How good the combined Pendolino and WCML upgrade package was that we could meet the APT record within just 20 secs on a 125mph railway!
Add to that the great co-operation across the whole railway to make this happen.