How could the Mid-Cheshire Line be improved?

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Are they proposing to scrap the TFW services from Piccadilly to Chester/North Wales via Warrington Bank Quay, or is this in addition to them?

They would be re-routed via Altrincham, but the Leeds-Victoria-beyond Northern service would become 2tph to compensate.
 

FrodshamJnct

Established Member
Joined
14 Apr 2019
Messages
4,426
Location
Cheshire
They would be re-routed via Altrincham, but the Leeds-Victoria-beyond Northern service would become 2tph to compensate.

Would they also compensate by calling at stations like Earlestown, Newton-le-Willows, Runcorn East and Frodsham?
 
Joined
13 Apr 2011
Messages
649
Location
Helsby
Would they also compensate by calling at stations like Earlestown, Newton-le-Willows, Runcorn East and Frodsham?
Apparently so. Helsby, Frodsham and Runcorn East get a 2 trains per hour service to Manchester Victoria and Leeds. No more direct services to Oxford Road or Piccadilly.
 

FrodshamJnct

Established Member
Joined
14 Apr 2019
Messages
4,426
Location
Cheshire
Apparently so. Helsby, Frodsham and Runcorn East get a 2 trains per hour service to Manchester Victoria and Leeds. No more direct services to Oxford Road or Piccadilly.

I wonder if stations like Frodsham and Helsby would remain TFW operated (it’d just be the Chester to Lime Street TFW service remaining), or become Norhern operated?
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,652
So would there still be services fast from Chester - Warrington - Victoria?

To me, that makes much more sense for the North Wales service.

Frodsham and Helsby will have the Liverpool-Chester (onwards) 1tph too. There was also talk of this going up, maybe 2tph but maybe through splitting, unclear: 1tph to Shrewsbury (0.5 to Cardiff) and 1tph to North Wales.

As for Mid-Cheshire, I don't think it's best used for the longer distance services. But does need improvement. The best thing would be some Alty shuttles and full integration with Met - or the tram-train to Hale or even Knutsford, to cover the highest demand.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,714
One slight issue, if 195s aren't cleared, what about the proposed TfW service? Will they have to keep some 175s on for this specific service? Because as far as I'm aware, all UK Civitys use the same bodyshell.
You probably wouldn't lose any cash if you bet on the taskforce not knowing that detail currently.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
So would there still be services fast from Chester - Warrington - Victoria?

To me, that makes much more sense for the North Wales service.

Frodsham and Helsby will have the Liverpool-Chester (onwards) 1tph too. There was also talk of this going up, maybe 2tph but maybe through splitting, unclear: 1tph to Shrewsbury (0.5 to Cardiff) and 1tph to North Wales.

As for Mid-Cheshire, I don't think it's best used for the longer distance services. But does need improvement. The best thing would be some Alty shuttles and full integration with Met - or the tram-train to Hale or even Knutsford, to cover the highest demand.

I think the other big benefit is the 2tph via Warrington would potentially become more evenly spread; off-memory the current 1 TfW+ 1 Northern is something like a 15/45 spread in one direction.
 
Joined
13 Apr 2011
Messages
649
Location
Helsby
So would there still be services fast from Chester - Warrington - Victoria?

To me, that makes much more sense for the North Wales service.

Frodsham and Helsby will have the Liverpool-Chester (onwards) 1tph too. There was also talk of this going up, maybe 2tph but maybe through splitting, unclear: 1tph to Shrewsbury (0.5 to Cardiff) and 1tph to North Wales.

As for Mid-Cheshire, I don't think it's best used for the longer distance services. But does need improvement. The best thing would be some Alty shuttles and full integration with Met - or the tram-train to Hale or even Knutsford, to cover the highest demand.
I believe one option is for the TFW services currently running through Bank Quay to go via the Mid Cheshire.
https://www.railforums.co.uk/threads/manchester-recovery-taskforce-timetable-consultation.213089/
 

Mcr Warrior

Veteran Member
Joined
8 Jan 2009
Messages
17,279
Haven't TfW services fairly recently (last year or so) been diverted via the Mid Cheshire line during a period of engineering work affecting a section of their normal route between Chester and Manchester? If so, what stock would they have been using on such workings?
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,378
Location
Yorks
Haven't TfW services fairly recently (last year or so) been diverted via the Mid Cheshire line during a period of engineering work affecting a section of their normal route between Chester and Manchester? If so, what stock would they have been using on such workings?

They have, and the one I went on was one of their normal units (whatever they are).
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,612
Location
Northampton
Haven't TfW services fairly recently (last year or so) been diverted via the Mid Cheshire line during a period of engineering work affecting a section of their normal route between Chester and Manchester? If so, what stock would they have been using on such workings?
As shown in my post on page 1, Class 175s are cleared throughout
 

Mcr Warrior

Veteran Member
Joined
8 Jan 2009
Messages
17,279
As shown in my post on page 1, Class 175s are cleared throughout
Did you? Which post number? Must have missed that! Either way, thanks for clarifying / re-clarifying.

(Presuming that class 175s are what TfW might run on the Mid Cheshire).
 

Watershed

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
26 Sep 2020
Messages
16,770
Location
UK
Did you? Which post number? Must have missed that! Either way, thanks for clarifying / re-clarifying.

(Presuming that class 175s are what TfW might run on the Mid Cheshire).
They have a handful of empty class 175 Chester-Manchester services booked over the Mid Cheshire line to keep up crew route knowledge.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,612
Location
Northampton
Did you? Which post number? Must have missed that! Either way, thanks for clarifying / re-clarifying.

(Presuming that class 175s are what TfW might run on the Mid Cheshire).
Post #55, page 2 (sorry!).

Class 175s are what I imagine TfW would run, but they could also run 150s or 158s, both of which are clear throughout.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Did you? Which post number? Must have missed that! Either way, thanks for clarifying / re-clarifying.

(Presuming that class 175s are what TfW might run on the Mid Cheshire).

They have a handful of empty class 175 Chester-Manchester services booked over the Mid Cheshire line to keep up crew route knowledge.

The occasional 175 wandered onto the "normal" Mid Cheshire service occasionally in First North Western days.
 

Polarbear

Established Member
Joined
24 May 2008
Messages
1,922
Location
Birkenhead
I've certainly travelled along the mid-Cheshire line on a 175 in the past. Probably on a Sunday diversion.

As for providing the line with a better service, I'd suggest 1 tph Chester - Manchester, and 1 tph Crewe - Manchester via Middlewich. The Chester service to skip-stop some of the smaller stations between Northwich & Altrincham and the Middlewich service would be all stations. Appreciate paths would be an issue presently, especially between Stockport & Piccadilly though.

Ideally, a western link to the airport would make life easier.
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
As for providing the line with a better service, I'd suggest 1 tph Chester - Manchester, and 1 tph Crewe - Manchester via Middlewich. The Chester service to skip-stop some of the smaller stations between Northwich & Altrincham and the Middlewich service would be all stations. Appreciate paths would be an issue presently, especially between Stockport & Piccadilly though.
I believe paths between Crewe and Sandbach would also be an issue, especially once HS2 Phase 2a opens and the London - Manchester trains start running via Crewe and Wilmslow. And Northwich station would need a costly rebuild, to reinstate a platform on the Middlewich line.

Unlikely to happen for the foreseeable.

== Doublepost prevention - post automatically merged: ==

Altrincham is the natural terminus for Metrolink. Extending the service beyond there requires the complexity of tram trains and would interfere with the extensive freight traffic. It isn't worth doing so just as far as Hale, which is in any case very affluent and low density suburbia, and beyond there is the relatively empty Cheshire countryside.
Although TfGM's five year plan actually says:
In the next five years, we aim to complete the business case for early delivery of Tram-Train Pathfinder South: South Manchester to Hale via Altrincham.
Rationale: A pilot scheme to maximise the utilisation of the existing Metrolink capacity in order to accommodate rapid transit demand growth to and through the Regional Centre. Will also facilitate testing of the tram-train concept for wider application in Greater Manchester.
 
Last edited:

FrodshamJnct

Established Member
Joined
14 Apr 2019
Messages
4,426
Location
Cheshire
I’d hope if it does happen that the Northern services through Runcorn East, Frodsham and Helsby would stop at these stations more frequently than they do now (couple of times per day).
 

daodao

Established Member
Joined
6 Feb 2016
Messages
3,602
Location
Dunham/Bowdon
@ Greybeard33

I am aware of TfGM's proposal to run tram-trains beyond Altrincham to Hale. I stand by my previously expressed view and think it is futile and a waste of resources. as is their proposal to run tram-trains from M/c Airport to Wilmslow. Both are likely to be opposed by Network Rail because of adverse knock-on consequences on heavy rail operations. Tram-trains are complicated to run and set up and it would be better to try to extend Metrolink in the way it is currently run as a stand-alone light rail system.

TfGM have quite a number of suggestions in the 2040 strategy, but only a few of the more realistic options are likely to see the light of day. A more sensible TfGM suggestion for trialling tram-trains is from Rochdale to Heywood and ultimately to Bury. This would be a much more useful link and IMO a better way to try out tram-trains in Greater M/c.
 
Last edited:

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
I’d hope if it does happen that the Northern services through Runcorn East, Frodsham and Helsby would stop at these stations more frequently than they do now (couple of times per day).
The proposal is that Runcorn East, Frodsham and Helsby will get a half-hourly Northern service all day, with the TfW trains diverted on to the Mid Cheshire.
I am aware of TfGM's proposal to run tram-trains beyond Altrincham to Hale. I stand by my previously expressed view and think it is futile and a waste of resources. Another TfGM suggestion for trialling tram-trains is from Bury to Rochdale via Heywood. This would be a much more useful link and a better way to try out tram-trains in Greater M/c.
I suspect the TfGM intention is to change the parallel single tracks between Deansgate Junction and Navigation Road back to a double track railway, shared between heavy rail and tram-trains.

This would act as a "pathfinder" for subsequent tram-train conversion of Ashburys - Rose Hill Marple via Bredbury, with a similar shared section between Romiley Junction and Marple Wharf Junction.
 

FrodshamJnct

Established Member
Joined
14 Apr 2019
Messages
4,426
Location
Cheshire
I suspect the TfGM intention is to change the parallel single tracks between Deansgate Junction and Navigation Road back to a double track railway, shared between heavy rail and tram-trains.

Isn’t that what there currently is? Or are ‘tram-trains’ different to the trams that currently share that bit of the network with heavy rail?
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,612
Location
Northampton
Isn’t that what there currently is? Or are ‘tram-trains’ different to the trams that currently share that bit of the network with heavy rail?
Tram-trains are vehicles that run on both the heavy rail network and tram tracks. Currently the only ones in the UK are the Class 399 on the Sheffield-Rotherham. Manchester only has trams adjacent to trains on independent single tracks.
 

FrodshamJnct

Established Member
Joined
14 Apr 2019
Messages
4,426
Location
Cheshire
Tram-trains are vehicles that run on both the heavy rail network and tram tracks. Currently the only ones in the UK are the Class 399 on the Sheffield-Rotherham. Manchester only has trams adjacent to trains on independent single tracks.

Yeah that’s what I thought, thanks. Feels like a lot of knock-on effect but then I suppose the Castefield issue is a major one that requires serious changes to produce a real effect.
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
Isn’t that what there currently is? Or are ‘tram-trains’ different to the trams that currently share that bit of the network with heavy rail?
Tram-trains are vehicles that run on both the heavy rail network and tram tracks. Currently the only ones in the UK are the Class 399 on the Sheffield-Rotherham. Manchester only has trams adjacent to trains on independent single tracks.
Yes, through Navigation Road the trams run both ways on one track and heavy rail trains both ways on the other parallel track. This single line working causes a bottleneck on both networks.

Tram-trains, like the Class 399s currently operating between Sheffield and Rotherham, are built to higher crashworthiness standards than the current Metrolink trams, and are equipped with heavy rail systems such as TPWS to permit operation on National Rail tracks.
 

FrodshamJnct

Established Member
Joined
14 Apr 2019
Messages
4,426
Location
Cheshire
Yes, through Navigation Road the trams run both ways on one track and heavy rail trains both ways on the other parallel track. This single line working causes a bottleneck on both networks.

Tram-trains, like the Class 399s currently operating between Sheffield and Rotherham, are built to higher crashworthiness standards than the current Metrolink trams, and are equipped with heavy rail systems such as TPWS to permit operation on National Rail tracks.

Interesting, thanks! Does it really cause that much of a bottleneck? The CLC line isn’t a particularly busy one, but I suppose this could be more of an issue for the trams.
 