Given the fewer stops than the Chester branch, and the therefore higher speed attainable between stops, surely there ought to be an aspiration to get this journey down to under 60 minutes? Regardless of who it sits with/stock used to operate it.
Will there be many passengers wanting to make connections to the Northern Line or main line services at Lime Street?Thats true not.too far from Liverpool1. Must be the best thing to do if it can as im sure the city is where most passengers are essentially heading for.
Possibly if you dropped some stops but don't think that would be popular!Given the fewer stops than the Chester branch, and the therefore higher speed attainable between stops, surely there ought to be an aspiration to get this journey down to under 60 minutes? Regardless of who it sits with/stock used to operate it.
It could be run into the spare platform at James St. With the way Liverpool city centre has shifted, this probably isn't all that inconvenient.
I think there's freight, and it would at least mix with other stuff at Wrexham General briefly (though it also does at Hunts Cross, to be fair).
For what purpose?
Familiar with the Wetherspoons. Shotton's waiting room!Good point, if you're connecting to the North Wales Coast line if you can, you're better going through Chester, rather than use Borderlines line through Shotton, choice of more trains too, Shotton & even Wrexham General aren't the pleasantest of stations to wait for trains at either, although Shotton does have a Wetherspoons near the station, the evening Wrexham-Bidston service is poor too.
Would it be possible to re-model so P2 was a centre turnback instead? This would reduce conflicts.Thinking, the junction at the west side of Birkenhead North station would have to be remodeled, you can't access the down line going west from platform 1[P1 would be were Wrexham trains would start/terminate] otherwise they'd have to do a shunt move P2 to P3, thus interfering with other pathing.
Would it be possible to re-model so P2 was a centre turnback instead? This would reduce conflicts.
(getting away from some of the "fantasy" stuff and the Union stuff...) there's obviously been a lot of chat about a second train per hour being a semi-fast but which stations would it serve?
To save sufficient journey time to permit an extension to Birkenhead (or even under the Mersey) it would presumably need to skip a few stations, so what would you miss?
Stations shown with most recent annual passenger numbers from Wiki:
Wrexham Central - 88,568
Wrexham General - 492,000
Gwersyllt - 26,802
Cefn-y-Bedd - 7,620
Caergwrle - 17,800
Hope - 24,630
Penyffordd - 20,686
Buckley 41,008
Hawarden - 32,642
Shotton - 215,066
Hawarden Bridge - 3,296
Neston - 42,924
Helswall - 58,452
Upton - 33,634
Bidston - 288,000 (plus 71,114 interchanges)
So (assuming that it'll start/finish at Wrexham Central) the big hitters are obviously Wrexham General and Shotton. But where else? Would the Merseyside stations all warrant the semi-fast stopping there, given the potential for more Liverpool commuters?
Where would you draw the line though? Only serving stations with 20,000 passengers pa would mean skipping three stations - is that enough to get all the way to Birkenhead in an hour? Or would you skip all of the ones under 30,000 passengers pa? Will the WAG b happy if the new service skips lots of Welsh stations but serves all of the English ones?
(apologies if this has been already decided)
It would require quite a leap of faith by both Welsh and Merseyside funders to try this, let alone investment in completely rebuilding Shotton, electrification, line speed increases, extending services to the Liverpool Loop, etc.
Realistically, what could you do at Shotton? It seems to me the fundamental problem is that the North Wales coast line doesn't actually go near the main road, where you ideally want the station to be. So, even if money was available to rebuild the station, you have a choice between having the Wrexham-Bidston line platforms where they are now (useless for interchange but great for journeys starting at Shotton), or putting them where the lines cross over (great for interchange, but rubbish for people starting/ending their journey there). There doesn't seem to be a way to make the station convenient for both groups of people.
Realistically, what could you do at Shotton? It seems to me the fundamental problem is that the North Wales coast line doesn't actually go near the main road, where you ideally want the station to be. So, even if money was available to rebuild the station, you have a choice between having the Wrexham-Bidston line platforms where they are now (useless for interchange but great for journeys starting at Shotton), or putting them where the lines cross over (great for interchange, but rubbish for people starting/ending their journey there). There doesn't seem to be a way to make the station convenient for both groups of people.
(getting away from some of the "fantasy" stuff and the Union stuff...) there's obviously been a lot of chat about a second train per hour being a semi-fast but which stations would it serve?
To save sufficient journey time to permit an extension to Birkenhead (or even under the Mersey) it would presumably need to skip a few stations, so what would you miss?
Stations shown with most recent annual passenger numbers from Wiki:
Wrexham Central - 88,568
Wrexham General - 492,000
Gwersyllt - 26,802
Cefn-y-Bedd - 7,620
Caergwrle - 17,800
Hope - 24,630
Penyffordd - 20,686
Buckley 41,008
Hawarden - 32,642
Shotton - 215,066
Hawarden Bridge - 3,296
Neston - 42,924
Helswall - 58,452
Upton - 33,634
Bidston - 288,000 (plus 71,114 interchanges)
Three of the four current platforms are reasonably well-connected: the coast platforms (1 and 2) are connected by a bridge/footpath to platform 3 (trains toward Bidston), but to get between platform 4 and the rest of the station you have to walk south to the main road then north again along platform 3.Realistically, what could you do at Shotton? It seems to me the fundamental problem is that the North Wales coast line doesn't actually go near the main road, where you ideally want the station to be. So, even if money was available to rebuild the station, you have a choice between having the Wrexham-Bidston line platforms where they are now (useless for interchange but great for journeys starting at Shotton), or putting them where the lines cross over (great for interchange, but rubbish for people starting/ending their journey there). There doesn't seem to be a way to make the station convenient for both groups of people.
If I was doing a full fat job on the line I would be tempted to close Bidston and open a replacement a bit along the Wrexham line, at the old road bridge. Takes a stop and slow conflict out of the West Kirby line and puts the station nearer the housing.
It's also an odd survivor in a way - the line round the coast from West Kirby would far better serve Heswall and Neston than the line from Bidston.