it isnt meant to be though! The only section that could be considered such is Grosmont to Whitby. That is £14
Which is why the town's true rail link shouldn't be neglected.
it isnt meant to be though! The only section that could be considered such is Grosmont to Whitby. That is £14
In a way similar to the Conwy Valley perhaps? A poor timetable and run-down rolling stock mean it isn't even slightly attractive?
Mind you, I can't imagine a Conwy Valley train full and standing!
They need to get the easy wins under their belt, such as strengthening Saturday services, then they should start comsidering the longer term improvements.
Strengthening Saturday services would cost little and increase revenueBut who's gonna pay for all that?
The Esk Valley line leaks money, so I doubt that Northern or the DfT have the appetite for more services
What the Esk Valley does is the bread and butter business of getting daytrippers in. Seeing a full and standing sprinter empty out its passengers at Whitby really brings home just how important the line is.
Anyhow, with passing places at Battetsby and Glaisdale and two platforms at Whitby, there shouldn't be reason why the NYMR and additional Esk vally services can't be accommodated. If anything, I've heard it said from those in the know that there's more of a capacity issue at the Middlesborough end.
The additional service in the opposite direction, Whitby to Middlesbrough, is agreed and included in Northern's 18th SA application.*Unsupported application made under Section 22A of the Railways Act 1993*
Date of commencement: Principal Change Date (PCD) 2019
End date: Principal Change Date (PCD) 2025
The 19th Supplemental Agreement (SA) seeks to:
Amend Tables 2.1 of Schedule 5 to increase the quantum of Middlesbrough – Whitby services by one passenger train slot per day (SX & SO)
Change to Quantum (tables 2.1) as follows:
ED01 – Tyne, Tees and Wear
Additional quantum as follows:
SX and SO
• 1 additional passenger train slot per day Middlesbrough – Whitby
We have been unable to reach a supported position with Network Rail having attended SOAR on 28th May. Network Rail do not believe that the service which ARN have bid for can be accommodated within the December 2019 timetable due to falling foul of Section 4 times and signal box opening hours.
ARN’s stance is that the application is for quantum only access rights and that Network Rail should not necessarily reject an access rights application on the basis of timetable validation as this is covered by a separate process as per the Network Code which is currently still ongoing. We are also in discussions with Network Rail LNE route to consider options to be able to deliver this service such as amendments to Section 4 times, stabling etc…
We therefore wish to submit our application for the 1 additional train slot on an unsupported basis in order to give industry and ORR sufficient time to review prior to the timetable offer coming back. As work with the route is ongoing this application will hopefully move to a supported position in the coming months.
The additional Middlesbrough-Whitby service for which ARN have bid is a key service specified within the current franchise. This service has strong stakeholder support and will provide a much-desired service to the region.
Strengthening Saturday services would cost little and increase revenue
I can well believe that there is a capacity crunch at Middlesbrough though, in theory, an extra platform should appear over the next few years depending on how the Council's and Combined Authorities plans pan out for that. However I wouldn't dismiss the issues between Grosmont and Whitby itself. It's single track all the way from Grosmont to Whitby and the block runs from Glaisdale to Whitby! So, for example, a Northern unit sat at Glaisdale going to Whitby cannot leave until the NYMR train is either shut in the platform at Whitby or returns to the NYMR at Grosmont. Or, alternatively, for example, an NYMR train cannot leave Grosmont until a Northern unit reaches Glaisdale or arrives in Whitby. I wouldn't dismiss that sort of constraint on capacity!
Network Rail is opposing Northern's track access application for an additional service from Middlesbrough to Whitby, starting December.
The application can be downloaded from Network Rail's sale of access rights webpage, under "Current Track Access Consultations - Arriva Rail North - 19th SA"
From the "Form P":
The additional service in the opposite direction, Whitby to Middlesbrough, is agreed and included in Northern's 18th SA application.
Northern can't leave Glaisdale until the NYMR reach Whitby. The block is Glaisdale - Whitby and you can only have one train at a time in block.Time the NYMR to get in first then lock it in when the Northern is getting to Grosmont.
Northern can't leave Glaisdale until the NYMR reach Whitby. The block is Glaisdale - Whitby and you can only have one train at a time in block.
Indeed, but given it only takes half an hour between the two, you don't need anything like the three hour gap between Northern trains to fit in steam services.
Indeed, but given it only takes half an hour between the two, you don't need anything like the three hour gap between Northern trains to fit in steam services.
Oh yeah sure, I'm not saying it precludes an increased service (I would argue for a two hourly service) but it certainly is a factor that has to be considered and will act as constraint to capacity.
And to think the new head honcho is saying how NR should be more responsive to passengers needs. From what I see, it seems to be opposing things left, right and centre, even at times and places where there isn't the competition for paths.
With the constrained nature of the infrastructure on the route, there could be scope for some pretty nasty knock-on delays if things go off book, particularly if the Northern service runs further afield than simply a shuttle to and from Middlesbrough. Presumably there's also the constraint that at least two trips need to be timed to suit the schools traffic.
There are cranks and tourists making the journey from further afield, but the line seems to be very popular with ordinary people and families from Middlesborough and the North East going for a day out. I would class these as local users.
Intriguing thought of the 156 stabling overnight at Grosmont or Whitby....Network Rail is opposing Northern's track access application for an additional service from Middlesbrough to Whitby, starting December.
The application can be downloaded from Network Rail's sale of access rights webpage, under "Current Track Access Consultations - Arriva Rail North - 19th SA"
From the "Form P":
The additional service in the opposite direction, Whitby to Middlesbrough, is agreed and included in Northern's 18th SA application.
You keep repeating this but the total passenger numbers are not really that high at all per service - it averages 95 per train and im guessing that that figure is inflated due to tourism in the summer - the reality is probably far far less no matter how much you say that theyre always rammed.
Oh yeah sure, I'm not saying it precludes an increased service (I would argue for a two hourly service) but it certainly is a factor that has to be considered and will act as constraint to capacity.
With the constrained nature of the infrastructure on the route, there could be scope for some pretty nasty knock-on delays if things go off book, particularly if the Northern service runs further afield than simply a shuttle to and from Middlesbrough. Presumably there's also the constraint that at least two trips need to be timed to suit the schools traffic.
that doesn't mean simply give passengers everything they ask for, instantly, everytime! The key point to me in that linked document is: Signal Box opening hours
That can be fixed but not quickly.
You keep repeating this but the total passenger numbers are not really that high at all per service - it averages 95 per train and im guessing that that figure is inflated due to tourism in the summer - the reality is probably far far less no matter how much you say that theyre always rammed.
Whilst I dont doubt an improvement on a summer saturday would be welcome you seem to be making false statements about just how busy the branch line is to try and convince yourself that it needs investment.
By definition, one is more likely to be travelling on busier trains. That's what makes them busier trains!It's a fact of life that if I travel on rammed trains on a route I'll get the impression it's always like that, as will all the many others on that train. I suspect the very few on the almost empty trains that make up the average will form a different impression, but they're on more services. No doubt crews could tell a more balanced story.
Pleasant as it is, the NYMR has become ridiculously expensive. Last year it was £29 return for an adult, last week £31. No railcard discounts. That’s £62 for a couple. We decided against it just on price. They should be wary of pricing themselves out of ordinary people’s reach.
Well, I think a standard two hourly service would be an improvement on the line. I think it's probably the bare minimum to have a genuinely useful service.
.... Nevertheless, even if you stepped up the Esk valley service to two-hourly and included the NYMR services, the section probably still wouldn't be as busy as many single track routes with hourly services.
Everyone wants Saturday strengthening on their line though, don't they? What about Saturday day-trippers on the diesel routes into Liverpool, Leeds, Newcastle, Sheffield or Manchester? What about people day-tripping to the Yorkshire Coast stations, Blackpool, Saltburn or Windermere? Don't they all want adequate capacity on their DMUs on packed summer Saturdays? I would say that all of those places by definition will come higher up the priority list than Whitby does. But just because one particular person wants to get the train to Whitby, here we are having a 5 page discussion about this one branch.Strengthening Saturday services would cost little and increase revenue
In Northern Ireland, an hourly service operates on an all single track route, with passing loops, but this has resulted in some journey times being extended because of the need to stop and wait in more loops.
The NYMR also no longer offers concessionary fares for pensioners. Whereas the Transdev 840 Coastliner Whitby - Pickering bus is free with an ENCTS pass, is quicker than the train, has wifi and USB sockets and provides panoramic views over the moors from the upper deck. No contest IMHO!What has happened to through ticketing to the NYMR? No fares are currently listed on brfares.com. It was in palce a couple of years back and the fares were quite reasonable.
Preserved railway through ticketing