I don’t think the ORE would countenance 3rd Rail to Wigan under any circumstances,plus I think an additional feeder may be required
No agreed. Crayonista mode - would be OHLE Salford Cresent/Lostock Junction to Wigan then Southport + Preston Ormskirk with all curves reinstated and bi/tri-mode stock and if 3rd rail became life expired replace gradually with OHLE. Wigan Kirby while you are at it too! OK crayonista mode off.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Chester1

Established Member
Joined
25 Aug 2014
Messages
4,442
Would the long suggested merging of the Wigan stations help with the gradient + bridge clearance issues? If two platforms for 6 coach sets were built as far away from the bridge as possible then track could be lowered a bit more. Wallgate station and the other buildings on the bridge could be demolished and if possible the bridge could be raised. The downside would be losing the bay platform.
 

frodshamfella

Established Member
Joined
25 Sep 2010
Messages
2,039
Location
Frodsham
Third rail into the Wigan Wallgate bay would to me make a lot of sense.

I'm guessing at some point when the proposed route to Skelmersdale happens...electric will go there from Kirkby and would make a whole lot of sense to take it to Wigan too.
 

Mathew S

Established Member
Joined
7 Aug 2017
Messages
2,167
I'm guessing at some point when the proposed route to Skelmersdale happens...electric will go there from Kirkby and would make a whole lot of sense to take it to Wigan too.
Regulators are dead seat against any extension of third rail though aren't they. The new Merseyrail stock is meant to be capable of conversion to dual voltage so it can run on 25kv OHLE, so would it not be simpler just to stick in some basic overhead cabling (it's not exactly high speed).
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,671
Regulators are dead seat against any extension of third rail though aren't they. The new Merseyrail stock is meant to be capable of conversion to dual voltage so it can run on 25kv OHLE, so would it not be simpler just to stick in some basic overhead cabling (it's not exactly high speed).

Could be quite expensive for such a short extension. As far as I am aware the regulator are opposed to any new schemes but small extensions are not frowned upon in the same way!
 

73001

Member
Joined
2 Jun 2010
Messages
447
Location
Liverpool
Regulators are dead seat against any extension of third rail though aren't they. The new Merseyrail stock is meant to be capable of conversion to dual voltage so it can run on 25kv OHLE, so would it not be simpler just to stick in some basic overhead cabling (it's not exactly high speed).
I thought they were OK with short extensions, rather than there being a blanket ban. I suppose it depends on a few things... The extension to Skem and whether electrification will come through from Wigan at any point (bridges depending obviously). As the second of these is a long way off, it's more likely that 3rd rail will make it to Skem and the change to 25kv would be there, eventually.
 

frodshamfella

Established Member
Joined
25 Sep 2010
Messages
2,039
Location
Frodsham
I thought they were OK with short extensions, rather than there being a blanket ban. I suppose it depends on a few things... The extension to Skem and whether electrification will come through from Wigan at any point (bridges depending obviously). As the second of these is a long way off, it's more likely that 3rd rail will make it to Skem and the change to 25kv would be there, eventually.

Well I wish they would just get on with it, everything seems to take an age outside London. I don't see what the big deal is with 3rd rail really, would seem the easiest way to do it.
 

Llama

Established Member
Joined
29 Apr 2014
Messages
1,959
I very much doubt that third rail would be extended to Wigan from Southport, with the relatively flat route with dozens of level crossings of all different types it surely wouldn't pass any cost/benefit ratio with the numbers of bridges that would need to be constructed. There just isn't the patronage to justify the cost compared to other lines and it would never pass the relevant risk assessments without closing or replacing dozens of crossings, even discounting the fact that extensions to third rail are strongly resisted.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,736
Location
"Marston Vale mafia"
I very much doubt that third rail would be extended to Wigan from Southport, with the relatively flat route with dozens of level crossings of all different types it surely wouldn't pass any cost/benefit ratio with the numbers of bridges that would need to be constructed. There just isn't the patronage to justify the cost compared to other lines and it would never pass the relevant risk assessments without closing or replacing dozens of crossings, even discounting the fact that extensions to third rail are strongly resisted.

It was a slightly OT suggestion to extend it from Kirkby into the bay (for Merseyrail to extend to Wigan), not from Southport, which if it were to be electrified would be 25kV.

By the way, there are loads of level crossings on third rail lines.
 

Mathew S

Established Member
Joined
7 Aug 2017
Messages
2,167
It was a slightly OT suggestion to extend it from Kirkby into the bay (for Merseyrail to extend to Wigan), not from Southport, which if it were to be electrified would be 25kV.

By the way, there are loads of level crossings on third rail lines.
Third railing the Southport line, and from Kirkby to Wigan, would allow both to become an integrated part of the Merseyrail network. If you do that, you could just fill in the bridge under Wallgate, and run all the eastbound trains that currently run from Wallgate in/out of North Western.

There is supposed to be remodelling / upgrading of North Western as part of HS2 anyway, so should be possible to ensure there's enough capacity.

It would annoy me to lose through services to Manchester from Pemberton, but even I'll admit that's a limited market. And a regular metro style through service to Liverpool would more than make up for it.
 

Llama

Established Member
Joined
29 Apr 2014
Messages
1,959
It was a slightly OT suggestion to extend it from Kirkby into the bay (for Merseyrail to extend to Wigan), not from Southport, which if it were to be electrified would be 25kV.

By the way, there are loads of level crossings on third rail lines.
I am aware of plenty of level crossings on third rail lines, but those lines were electrified when regulations were nowhere near as tight as today.
 

frodshamfella

Established Member
Joined
25 Sep 2010
Messages
2,039
Location
Frodsham
Third railing the Southport line, and from Kirkby to Wigan, would allow both to become an integrated part of the Merseyrail network. If you do that, you could just fill in the bridge under Wallgate, and run all the eastbound trains that currently run from Wallgate in/out of North Western.

There is supposed to be remodelling / upgrading of North Western as part of HS2 anyway, so should be possible to ensure there's enough capacity.

It would annoy me to lose through services to Manchester from Pemberton, but even I'll admit that's a limited market. And a regular metro style through service to Liverpool would more than make up for it.


It does make complete sense. Stopping at administration boundaries is ridiculous, that's not how people operate.
 

bengley

Established Member
Joined
18 May 2008
Messages
1,987
I very much doubt that third rail would be extended to Wigan from Southport, with the relatively flat route with dozens of level crossings of all different types it surely wouldn't pass any cost/benefit ratio with the numbers of bridges that would need to be constructed. There just isn't the patronage to justify the cost compared to other lines and it would never pass the relevant risk assessments without closing or replacing dozens of crossings, even discounting the fact that extensions to third rail are strongly resisted.
It's not necessary to construct bridges to get over third rail routes. Plenty of places exist on the third rail network where there is simply a gap in the third rail over level crossings.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,736
Location
"Marston Vale mafia"
It does make complete sense. Stopping at administration boundaries is ridiculous, that's not how people operate.

Merseyrail doesn't stop at the administration boundary on quite a number of its branches.

I'm not convinced that putting the Southport-Wigan line into it makes sense, though, it has a completely different character to the rest of Merseyrail (which is a self contained urban S-Bahn, and to stay effective really needs to stay one). I do however think curtailing the Kirkby line to Wigan and having Merseyrail operate that *would* make sense as it's a minor "add on" that would require one unit and one crew, and due to the Wallgate layout cross-platform interchange is possible both ways. The only potential fly in the ointment is Skelmersdale - if that does get built, then extending Merseyrail to Skelmersdale and having Northern operate hourly Skelmersdale to Manchester makes more sense.
 
Last edited:

frodshamfella

Established Member
Joined
25 Sep 2010
Messages
2,039
Location
Frodsham
Merseyrail doesn't stop at the administration boundary on quite a number of its branches.

I'm not convinced that putting the Southport-Wigan line into it makes sense, though, it has a completely different character to the rest of Merseyrail (which is a self contained urban S-Bahn, and to stay effective really needs to stay one). I do however think curtailing the Kirkby line to Wigan and having Merseyrail operate that *would* make sense as it's a minor "add on" that would require one unit and one crew, and due to the Wallgate layout cross-platform interchange is possible both ways. The only potential fly in the ointment is Skelmersdale - if that does get built, then extending Merseyrail to Skelmersdale and having Northern operate hourly Skelmersdale to Manchester makes more sense.

Yes that what I was thinking of from Kirkby to Wigan. True Merseyrail now go into Chester and E Port, but there is still the odd stop at Kirkby , Hunts Cross and Ormskirk . There has been no expansion for years it is about time some improvements happened . From what I can recall the last improvements were stations at Liverpool South Parkway ( which replaced 2 other stations ) and Maghull North recently . Otherwise there has been no network expansion for donkeys .
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,736
Location
"Marston Vale mafia"
Yes that what I was thinking of from Kirkby to Wigan. True Merseyrail now go into Chester and E Port, but there is still the odd stop at Kirkby , Hunts Cross and Ormskirk . There has been no expansion for years it is about time some improvements happened . From what I can recall the last improvements were stations at Liverpool South Parkway ( which replaced 2 other stations ) and Maghull North recently . Otherwise there has been no network expansion for donkeys .

I don't see Ormskirk as that odd a stop - the line changes character substantially from there from suburban to rural. With recent growth, though, I do support extending to Burscough Bridge via the South Curve, which would have the advantage of allowing an hourly service to Preston to operate from there with one unit, avoiding the messy three-way thing.
 

Shaw S Hunter

Established Member
Joined
21 Apr 2016
Messages
3,497
Location
Over The Hill
Do I really need to restate what I said in post #13?

Kirkby to Wigan is most definitely not a suitable candidate for adding to the Merseyrail network. Full Stop. All such talk is nothing more than railfan wibble and most importantly is not supported by any of the LAs in the area.
 

AMD

Member
Joined
6 Dec 2017
Messages
773
It would annoy me to lose through services to Manchester from Pemberton, but even I'll admit that's a limited market.
There is a substantial amount of traffic from this line, particularly Orrell and Pem in the Manchester direction, from my experience over two thirds of traffic in this area is through traffic at Wigan so terminating at Wallgate is a non starter.
 

Chester1

Established Member
Joined
25 Aug 2014
Messages
4,442
Do I really need to restate what I said in post #13?

Kirkby to Wigan is most definitely not a suitable candidate for adding to the Merseyrail network. Full Stop. All such talk is nothing more than railfan wibble and most importantly is not supported by any of the LAs in the area.

Merseyrail would run to Skelmersdale if the new link is ever built. I think after so many years failing to obtain funding the focus should be on choosing a route and obtaining legal protection for it. A Skelmersdale Parkway Station could then be built as two terminating platforms on triangular junction so both Merseyrail and Northern services would be able to serve it if the line into town was built. It would be a cheap(ish) phase 1 that would improve services and set up the network for a phase 2. Kirkby to the outskirts of Skelmersdale would be sufficiently short for battery power.
 

Llama

Established Member
Joined
29 Apr 2014
Messages
1,959
It's not necessary to construct bridges to get over third rail routes. Plenty of places exist on the third rail network where there is simply a gap in the third rail over level crossings.
Yes, I am well aware of that fact. However it would be a big enough political hurdle to simply extend third rail, even ignoring the fact that the regulations and standards will almost certainly have changed since mass extensions of third rail last occured. And on the Wigan - Southport line there are crossings every few hundred yards in some areas.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,311
Location
Bolton
One of the huge benefits of the current Merseyrail setup is the network being isolated (operationally) from everywhere else. Link the Kirkby line to Wigan and you start to run the risk of importing delays from there onto the Northern lines.
They would interact with Northern services for less distance than the current interaction at Hunts Cross. There are also fewer services going north out of Wigan than there are at Hunts Cross.
Even worse if you go beyond Wigan.
Who suggested that?
It's a healthy and growing commuter and shopping market.
Maybe, but the last train still leaves Manchester at 1826 and no Sunday service is provided. Note that Northern do not see fit to allow an easement for Off Peak Day tickets to be used on the 1826 departure from Manchester Victoria. There cannot be that much demand for shoppers if Northern haven't even bothered to add a simple easment to Pemberton and Orrel tickets...
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,311
Location
Bolton
since none of the present or planned trains include toilets, there would be a comfort limit for passengers.
Liverpool to Southport is 47 minutes - that is a common journey and is rather a long time for some people to go without access to toilets. Liverpool to Wigan would not exceed that...
 

Mathew S

Established Member
Joined
7 Aug 2017
Messages
2,167
There is a substantial amount of traffic from this line, particularly Orrell and Pem in the Manchester direction, from my experience over two thirds of traffic in this area is through traffic at Wigan so terminating at Wallgate is a non starter.
I know. I commute to and from Pemberton when I can - but they key words there are 'when I can'. The service as it is now is woefully inadequate. Trains start too late, finish too early, are slow, dirty, too small, and too infrequent.
An all day, 15-min Merseyrail electric service which connected with the fast Wigan-Manc services in the town centre would be an overall huge reduction in journey time, and increase on the current 1tph for part of the day service.
More importantly, a 15 min electric service would allow Pemberton to become a park-and-ride off the soon to be built M58/A49 link road which would, if it were priced right and properly promoted, be a huge bonus for Wigan.
 

urbophile

Established Member
Joined
26 Nov 2015
Messages
2,482
Location
Liverpool
Yes that what I was thinking of from Kirkby to Wigan. True Merseyrail now go into Chester and E Port, but there is still the odd stop at Kirkby , Hunts Cross and Ormskirk . There has been no expansion for years it is about time some improvements happened . From what I can recall the last improvements were stations at Liverpool South Parkway ( which replaced 2 other stations ) and Maghull North recently . Otherwise there has been no network expansion for donkeys .
But to keep the character of Merseyrail as an urban/suburban metro network, expansion should be more or less within the current boundaries. There are plenty of new stations (some of them already actively planned) that could be added to existing lines, and the reopening of the Edge Hill - Bootle line, the restoring of trains to Gateacre and the rest of the outer-city loop at least as far as Broad Green, would make much more sense than sending toiletless metro trains miles into the countryside. Skelmersdale, Burscough and possibly Neston, would be sensible extensions but I can't think of any others. Even Warrington would probably be better served by an improved service (a mix of fast and slow trains) on the CLC as far as Manchester.
 

Eccles1983

On Moderation
Joined
4 Sep 2016
Messages
841
Liverpool to Southport is 47 minutes - that is a common journey and is rather a long time for some people to go without access to toilets. Liverpool to Wigan would not exceed that...


Even without any disruption, liverpool to wigan via kirkby is 52 minutes using the current times.

Add in the Bins train and you could realistically have over an hour trapped on a train without a toilet.

The locals of POURK (Pemberton Orrell upholland Rainford Kirkby) would be rather miffed to lose direct commuter services to Manchester. Whilst the crayola enthusiasts would rejoice the actual residents would be fuming.

And as a side dish, has anyone bothered to work out if this would ever make money? You're requiring an extra 4 trains effectively per hour per day to sustain the 15 mins ratio. Outside of the peaks there is simply no demand for it.
 

Shaw S Hunter

Established Member
Joined
21 Apr 2016
Messages
3,497
Location
Over The Hill
They would interact with Northern services for less distance than the current interaction at Hunts Cross. There are also fewer services going north out of Wigan than there are at Hunts Cross.

There is considerable cross-Wigan traffic on Northern's Kirkby services. If traffic was not to be lost it would be essential to ensure connections would be maintained. So interaction would be inevitable.

Who suggested that?

Same argument as above. But allowing for the possibility of bi-modes to provide some through services. Not sure who would pay for them though.

Maybe, but the last train still leaves Manchester at 1826 and no Sunday service is provided. Note that Northern do not see fit to allow an easement for Off Peak Day tickets to be used on the 1826 departure from Manchester Victoria. There cannot be that much demand for shoppers if Northern haven't even bothered to add a simple easment to Pemberton and Orrel tickets...

The lack of evening/Sunday services is down to a long-standing problem with anti-social behaviour in and around Kirkby. Ideally there would be a turn-back facility at Orrell dealing both with that lack of service and allowing a higher frequency east of there through the day. The fares are down to the DfT squeeze on Northern's franchise finances though I think you knew that. I agree an easement should exist but once you start where do you stop. Aren't we always bemoaning the complexity of rail fares?
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,311
Location
Bolton
The lack of evening/Sunday services is down to a long-standing problem with anti-social behaviour in and around Kirkby.
Often claimed but unlikely to be a real reason not to do it, if demand is so burgeoning as you claim - there are lots of trains to Kirkby in the evening, and lots to other, similar areas with many of the same social problems where an evening service is provided anyway. The signalling arrangements are more likely to present a reason - but this is only a question of money.
 
Last edited:

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,311
Location
Bolton
The fares are down to the DfT squeeze on Northern's franchise finances though I think you knew that.
You claim there's lots of demand from shoppers. Shoppers aren't forced to pay high anytime fares on any other route to leave Manchester in the evening, only those going back to Pemberton and Orrell. It's nothing to do with the 'squeeze on finances' - they just like charging more because they can. Or more likely because so few people use it, there is nobody to complain.
I agree an easement should exist but once you start where do you stop. Aren't we always bemoaning the complexity of rail fares?
Off Peak tickets within the local area restrictions should be valid on the final journey opportunity of the day in all circumstances. It is far from difficult to identify the small number of affected stations within Greater Manchester and introduce a time based easement, or an easement for that specific train. Easy. Loads of other operators do it but Northern have decided not to. What sort of shopper will voluntarily pay £11 for Pemberton to Manchester? It's near double the price...
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,736
Location
"Marston Vale mafia"
Often claimed but unlikely to be a real reason not to do it, if demand is so burgeoning as you claim - there are lots of trains to Kirkby in the evening, and lots to other, similar areas with many of the same social problems. The signalling arrangements are more likely to present a reason - but this is only a question of money.

It is, AIUI, genuinely the reason why BR withdrew the evening service - primarily things like brickings. However, I don't think things in Kirkby are actually as bad as they were in the 1980s and I don't think it is really a reason that continues to carry much weight, it's just a convenient excuse to save money.
 