377208/209/213 returned to Southern as 5Z51. Ruuning 41 late through Blackfriars.
377514 went through City at 1322 as 5Z22 on route to Cauldwell.
FCC are not running any 377's today expect the three jointly run with Southeastern.
FCC now have 377502/504/505/ 506/507/508/ 509/510/511/ 512/513/514/ 515/516/517/ 518/519/520/ 521.
Southern have 377522/523
Bombarbier have 377501/503
FCC have have 19 out of the 20 units they need for Decembers timetabled service if it starts on December 12th. 377523 is likely to release 377504 so it can go back to Derby for repairs.
--- old post above --- --- new post below ---
None fleet update on the TLP, talking of cuts are incraesing with even an offical link on the internal FCC website over a proposed £750m cuts to balance the budget to the original £5.5bn as the project is over budget already.
Links
http://www.nce.co.uk/news/transport...park-thameslink-cutback-fears/5204411.article
http://www.guardian.co.uk/business/2009/nov/14/thameslink-crossrail-upgrades-cutbacks
Nothing offically said yet but rumbling go on. Doubt much will be said until after the drivers issue dies down.
--- old post above --- --- new post below ---
Another update for those interested
Rolling stock
When the new timetable hits on 13th December FCC expect to have 22 377/5 available. This leaves 377501/503/504 not with FCC.
377501 - is expected back at Cauldwell on 02/12/09
377514 - arrived at Bedford 13/11
377522 - Southern install a new rransformer on the unit on the 12/11. Testing should be begin w/c 16/11. 522 is expected at Bedford next week.
377523 - nothing said but unit is at Selhurst with 522
377503 - "delivery of final 377 (503) 26/11/09"
Testing completed on the metal shield for the OHLE interferrance in the Core. Fitting to begin shortly.
Other news
Crawley Council have given planning approval for Three Bridges depot.
Favored Plan for London Bridge should done next month.
Network has completed the first package works for the closurse of Moorgate. This conists of a 'patio' to allow drivers to change ends at Clerkenwell Crossovers.
Final scheme plan & station change for Leagrave has been issued.
FCC has reviewed potentinal track slew at St Albans to minimised their impact.
West Hampstead platform extensions open 31/01/10.