I could have told you that ages ago. Not only are the GWR sets only managing a measly 5000 miles between failures (half what the others achieve), it's blatantly obvious that they've offloaded the worst vehicles onto ScotRail and kept the best ones from themselves. Plus the power cars have had absolutely minimal work done on them.
It's absolutely farcical, and won't improve services at all - we'll be lucky to see any more of the things anytime soon, and they're likely to break down all the time.
I have to bow to those with the rail industry experience here. But with only one set delivered for whatever reason or blame you try to attribute to wabtec. If these very old power cars are unreliable as has been suggested. Added to the long delay to refurbish very old corroded carriages. The ultimate blame settles with Scotrail and transport Scotland. Following hard on the heels of delays in all the other “improvements” the PR machine at Scotrail needs recalibrated to reality ! The prospect of the older or rather Classic HST in service seems likely to underwhelm for years to come.
Add to that the effluent issue. It’s hard to maintain the Scotland’s best ever railway tag as your mantra.
And in reference to a poster above correctly reminding our southern friends that Scotland has a distinctive legal system and legislation. We do share a Uk common bond. Useless politicians . Don’t expect the duty Transport Minister in rotation in Scotland to solve anything. As useless as his English counterpart.
It’s very telling when your MSP and Transport manager in Scotland cant even acknowledge letters let alone reply to them confirms a total indifference to passengers only their jobs. I think you could write on the palm of your hand what the Transport minister and his department know about HST trains other than what Abellio sold to them as deliverable. It hasn’t !
