I have NOT followed the 25 previous pages of discussion in this thread. For those who may be interested South Eastern made the following presentation to London Travelwatch this morning. I've shared the link solely on the basis people may like to see what they said. There is no intent on my part to correct / amend / criticise any previous comment in this thread.
http://www.londontravelwatch.org.uk/documents/get_lob?id=4524&age=&field=file
The timeline here is really interesting BUT - if there were 4 occasions when the tracks were clear ready to go when final safety checks were being carried out...... was this communicated to passengers either by the drivers or by twitter??????? According to the timeline the passengers self evacuated minutes later on 4 separate occasions. This suggests to me that the passengers appear weren't told about the progress, or had lost confidence in the rail authorities solving the problem........or the timeline is incorrect. The slides say the timeline is as follows:
17:40 – 2M48 stopped by emergency brake, ice causing power issues and faults
18:16 – driver of 2M48 resolves system issues on train, but cannot move off due to ice
18:36 – power isolated by Network Rail on two lines to de-ice conductor rail
18:40 – power ready to be recharged – final safety checks being carried out - ALMOST ALL CLEAR
18:45 – passengers on 2M50 self-evacuate onto tracks, power on all lines isolated
18:50 – passengers on 2S54 self-evacuate onto tracks
19:00 – line cleared, power ready to recharge – final safety checks being carried out - ALMOST ALL CLEAR
19:06 – passengers on 2M48 self-evacuate onto tracks
19:15 – line cleared, power ready to recharge – final safety checks being carried out - ALMOST ALL CLEAR
19:15 – passengers on 2S56 self-evacuate onto tracks
19:30 – more passengers from 2M50 self-evacuate onto tracks (time estimated)
19:32 – passengers from 2H50 self-evacuate onto tracks
20:15 – line cleared, power ready to recharge – final safety checks being carried out - ALMOST ALL CLEAR
20:26 – more passengers from 2M48 self-evacuate onto tracks
21:00 – line cleared, power ready to recharge – final safety checks being carried out
21:10 – London Fire Service check track using drones and
21:36 – line confirmed clear, power restored, queue of trains begins to move within the following 10-20 minutes