Trains are held at Ardwick and in Piccadilly Platform 13 whilst trains clear before progressing. So if something wants to cross to get to or leave the through platforms there can be delays if the 'straight on' trains do not promptly clear.Does the elimination of crossing movements at Piccadilly's throat improve throughput by enough to generate extra paths through Castlefield?
I'm on the 17.11 to Scarbados virtually every night. This barely ever arrives or leaves on time and a few times we've sat there at least 5 minutes waiting for a clear path.Trains are held at Ardwick and in Piccadilly Platform 13 whilst trains clear before progressing. So if something wants to cross to get to or leave the through platforms there can be delays if the 'straight on' trains do not promptly clear.
I'm not saying cut everything, just the TPEs that reverse at Picc until P15/16 can be built. Really they were essential to the utility of the Ordsall Chord.
As another possibility, could an additional *track* be build more cheaply than the full platform developments, allowing separate access to and use of 13a/b and 14a/b? Most trains down there don't use all of it, so doing that would provide most of the benefits and indeed have some of its own e.g. easier interchange.
i see the hatred of direct services from the north east/Yorkshire to Manchester Airport has risen its head again.
I can't quite understand why there is so much opposition to it. Clearly more people are using Manchester airport, and more people are using the direct trains
Not sure why, just boarded the Airport Middlsborough service at Piccadilly through to York. Arrived with half the seats taken from Airport, lots of travellers included judging by baggage.
i see the hatred of direct services from the north east/Yorkshire to Manchester Airport has risen its head again.
I honestly don't get it. This is a really big success for rail with a market grown form next to nothing! I know lots of people who make two types of rail journeys: London for a special trip/weekend or Manchester Airport for their holidays.
Why they want to put that at risk for "tidy lines" seems mad to me
I honestly don't get it. This is a really big success for rail with a market grown form next to nothing! I know lots of people who make two types of rail journeys: London for a special trip/weekend or Manchester Airport for their holidays.
Why they want to put that at risk for "tidy lines" seems mad to me
Not sure why, just boarded the Airport Middlsborough service at Piccadilly through to York. Arrived with half the seats taken from Airport, lots of travellers included judging by baggage.
Many were still in on when i got off at York.
So it makes good sense to grow that market
If I can interject it makes no sense to grow TPE's market in any form until the new stock is delivered and in operation. The overcrowding is already at unacceptable levels. Arguably they need to find a way to *reduce* demand a bit, and be very careful and ruthless in how they deploy their fleet to avoid as much of it as possible.
Same with Northern to some extent, which is why, if the 769 project fails, I advocate splitting services to use plentiful used EMUs under the wires and pack in DMU operation under the wires as far as remotely possible until more wires can go up and the new DMUs arrive. I've given other examples of options for this, such as truncation of Barrow services to Lancaster (compensated by introducing a proper hourly clockface timetable from morning to night including Sundays) and Windermere services to Oxenholme, replaced with connecting EMU services from Manchester.
If we aren't providing adequate capacity, everything else has to take a back seat. Better that people have to change trains on quality, planned connections than that they can't get on at all.
Seems like an insane idea to be cutting stops in West Yorkshire and preventing stopping services from running on the line to shave a few minutes off the journey to Manchester, just to then stop at every corner shop and cow-shed between Manchester town centre and the airport. You might as well get on the tram...My only thing I would want to change is make all the TPE (and Northern) trains between Oxford Road and the Airport stop at all stations.
Stopping them all at Mauldeth Road, Burnage, East Didsbury, Gatley and Heald Green does not substantially reduce their usefulness to people trying to get to the Airport from elsewhere.
But it does allow us to use a line through a heavily urbanised area that is otherwise going to waste.
My only thing I would want to change is make all the TPE (and Northern) trains between Oxford Road and the Airport stop at all stations.
Stopping them all at Mauldeth Road, Burnage, East Didsbury, Gatley and Heald Green does not substantially reduce their usefulness to people trying to get to the Airport from elsewhere.
But it does allow us to use a line through a heavily urbanised area that is otherwise going to waste.
Seems like an insane idea to be cutting stops in West Yorkshire and preventing stopping services from running on the line to shave a few minutes off the journey to Manchester, just to then stop at every corner shop and cow-shed between Manchester town centre and the airport. You might as well get on the tram...
Bantamzen: it would free up one DMU per hour to use elsewhere.
It's not about "tidy lines". It's about keeping the Castlefield line reasonably workable by not packing more short DMUs onto it, and about freeing up a DMU that TPE need to stop people being left behind at stations, which has to be a priority over direct services to holiday Spain.
Once P15/16 has been built and the new TPE stock has been delivered (at least enough to allow 3-car operation to end), by all means bring it back.
In the meantime if you don't qualify for railway provided assistance, and you can't be bothered walking 50 yards on the level when you'll have to walk about 200 yards including escalators when you get to the airport (and that's just to get to check-in), take a taxi. These services simply should not be a priority in the background of the area's railway needs.
I'm afraid what you are describing is shutting the stable door after the horse has bolted. More people are already using the direct services, so quite how you think that stopping them short of the airport and onto a shuttle service is going to free up capacity on the TP core is beyond me. if someone is travelling to York from the airport they are still going to get on a TPE to Manchester and take up the same capacity, have the same number of cases etc.
Mauldeth Road receives two trains per hour at best. Not four.Isnt there something like 9 tph? That's far more capacity than those stations could ever need and the stoppers take 24m as opposed to 15m. That's a lot of passengers inconvenienced for your benefit when the stoppers are already every 15 minutes.
Seems like an insane idea to be cutting stops in West Yorkshire and preventing stopping services from running on the line to shave a few minutes off the journey to Manchester, just to then stop at every corner shop and cow-shed between Manchester town centre and the airport. You might as well get on the tram...
I think such a decision means those people ( and their money) find a different way to the airport - the attraction is the direct service
Drifting further off topic, but it could be argued that operating 185s York - Newcastle is more of a waste of scarce DMUs. Either TPE could leave the route to VTEC and XC, or run an EMU shuttle (using 319s on short-term hire?) with cross-platform or same-platform connections at York.I know, and you can't have a direct service from everywhere to everywhere, particularly where there is both a rolling stock shortage and a line capacity shortage.
TBH, this business, which is mostly on cheapo Advance tickets and does not heavily load the trains, might as well be let go. I disagree with you that it won't return. The same people may not return, but O'Leary wasn't wrong when he said other people will come along later.
It isn't OK wasting scarce DMUs shifting fresh air when there is a shortage.
I don't know where you drive but there is plenty of money being spent on roads in Yorkshire and Manchester areas. The M62 in particular has had two major upgrades to 'Smart Motorway' status. The SEMMS road by the airport, the lift bridge by the Trafford Centre; the A556 by-pass near Knutsford. I'm sure there are more that don't come to mind.I think what a lot of people forget is that whilst there is quite a bit of investment going in at rail level, especially around the North West, road-wise there is not a great deal more capacity being generated. And with passenger growth at 9% last year through the airport, that's a lot more people to shoehorn onto the road network in the region which at best can be problematic and at worst a car park (M62 I'm looking at you). Its not a lot of fun falling off a red-eye from the US only to find your pre-booked taxi is snarled up in roadworks and accidents and is an hour and a half away as once happened to me. In future the train will be taking the strain, preferably with a nice bottle of wine to enjoy as we head over the hills.
So it makes good sense to grow that market, and grow it will because its a stress trying to time a drive to the airport whereas a regular direct service from major towns and cities offers a fairly reliable alternative. And for those kind souls worried about northern waistlines, there is still a fair walk to most gates from there....
Drifting further off topic, but it could be argued that operating 185s York - Newcastle is more of a waste of scarce DMUs. Either TPE could leave the route to VTEC and XC, or run an EMU shuttle (using 319s on short-term hire?) with cross-platform or same-platform connections at York.
Also, a 3-car set between York and Middlesbrough has always been more than enough when I've used these services - perhaps hand it over to Northern with a 2-car 158?
The Barrows south of Lancaster are similar, they are mostly acting as Barrow-Lancaster and Preston-Manchester Airport services with the loadings Lancaster-Preston very low and an almost complete turnover of passengers between the two of Lancaster and Preston (indeed, I think Windermere has a much better case for through Airport services because of high tourist numbers).
Ten minutes extra on a journey to the airport matters a lot. I rarely schedule in more than an hours wait at the airport, sometimes a little more for international flights. If it was a longer journey in, from Scotland for example, then you are already up against flying as an alternative so another ten minutes makes a real difference in competitiveness. I'm also not that keen on my through intercity-type journey with luggage in the racks suddenly having the doors open every two minutes for randoms to get on and off, or for the whole experience to suddenly turn into a cramped commuter train.But I've just been told that the primary atraction of through services to the Airport are that its a one seat ride the entire way.
Do people about to spend hours at airport check in really care if the train takes a few extra minutes to reach the Airport?
People disembarking in central Manchester are an entirely different market, to whoom speed matters.
People around the Styal Line however cannot get a tram, and doing something like this would provide them with a tram standard service at a very low cost to the railway.
Knutsford has 100,000 passengers per year MORE than Mauldeth Road and currently receives one train per hour in each direction and a second one northbound in morning peak and shouthbound in evening peak.Mauldeth Road receives two trains per hour at best. Not four.
I don't know where you drive but there is plenty of money being spent on roads in Yorkshire and Manchester areas. The M62 in particular has had two major upgrades to 'Smart Motorway' status. The SEMMS road by the airport, the lift bridge by the Trafford Centre; the A556 by-pass near Knutsford. I'm sure there are more that don't come to mind.
Both the Smart Motorway schemes cost c£200m each; SEMMS is c£300m; A556 is just short of £200m