Depends what you mean by metro. A Swiss style rural S Bahn would fit it quite well.
Decent stopping service on the main line would do a lot of the job.
Depends what you mean by metro. A Swiss style rural S Bahn would fit it quite well.
As someone with only a distant knowledge of the area (though I made one return trip between Ebbw Vale and Cardiff for the 2014 Heineken Final!) is there any mileage in keeping the hourly direct Cardiff service but with an additional second via Newport? I appreciate many issues, particularly pathing, would need addressing, but might this be possible?
A service to Newport has been promised since the line was reopened to passengers, but requires a limited amount of redoubling. Work was started on this but has apparently been abandoned.
There are plenty of trains between Newport and Cardiff so if the train went beyond Newport a destination like Abergavenny or Cheltenham would be more useful.
The Ebbw Vales are going to Cheltenham over the weekend due to line closure between Newport and Cardiff as a result of Engineering Work. This arrangement normally happens when this route is closed, the Maesteg to Cheltenhams starting/terminating Cardiff Central.
I haven't done Park Jn to Gaer Jn for ages so I might be out for that. Thanks for the heads up!
One big point NR ain't part of this it's being forced on them.
Looking at RTT, it appears that on Saturday only there are trains Ebbw Vale - Gloucester. On Sunday it's trains Ebbw Vale - Pye Corner for buses to Cardiff.
And the fare from Newport to Pye Corner on Saturday's direct train for this 3 mile journey is £9.90 single, or £7.20 day return which is the same as the day return from Cardiff Central, but there's a single from Cardiff to Pye Corner at £4.60.
Talking of fares and ticketing, what would we like to see in the Metro area?
Proper zoning and integrated ticketing similar to London.
The ability to be able to buy either a paper or electronic ticket/season ticket for all of Zone 1 / Zone 3-1 etc.
ATW really are going above and beyond lately to annoy customers. If you buy an annual ticket from Merthyr to Cardiff QS/Central for example it’s no longer valid for travel to the Bay (despite being the same cost).
I'd like to see integrated ticketing too. At the moment there's the off-peak only Valleys Day Explorer but that's only valid on Stagecoach buses, various Plusbus tickets and a few bus/rail tickets by Stagecoach. All a bit of a mess.
Of course you could just advise people to buy it to the Bay anyway even if you aren't necessarily going to use that bit.
Wouldn't a Merythr to City Center/Zone One ticket be a) more attractive from the outset encouraging more people to travel by train b) more user friendly and c) effectively advertise the fact that there are 20 railway stations in Cardiff - a fact missed by most of the population of Cardiff let alone South Wales?
With Wales having a relatively simple transport network compared with England, and with there being a relatively small number of operators, it might do well to consider a national zonal fare system for all modes. That would give ATW the excuse it wants to withdraw from ORCATS etc for non-cross-border journeys too.
With Wales having a relatively simple transport network compared with England, and with there being a relatively small number of operators, it might do well to consider a national zonal fare system for all modes. That would give ATW the excuse it wants to withdraw from ORCATS etc for non-cross-border journeys too.
Ideally, you should only be paying for the distance you travel as this would encourage people to make short hops and pay accordingly.
It seems to be that ATW have been left behind in the Cardiff area by the way that Cardiff Bus have organised there fares. Click the link and then select ‘On The Bus’ to see the fares. Note that people can buy a Day to Go ticket for £3.80. They also have cheaper fares for young people - and by young - they mean up to 19 rather than the 15th birthday used by the rail companies to count people as adults. (This probably harks back to the days when most people left school at 15 and starting earning money. Apparently, nobody has told the railways this is no longer the case)!
https://www.cardiffbus.com/fares-and-tickets
On the competing NAT buses, the all day fare is £3.
https://www.natgroup.co.uk/news/service-changes-our-cardiff-network-6th-march
British Rail Board Policy Unit were looking into raising the adult fare age to 18 in the early 90's but of course we've had the magic of privatization since then and nothing has happened......
Now that is something that TfW/WG could make a real difference on rather than talk about everything being World Class actually do something worthwhile?
The Zones have alreay been mapped out before see
http://www.projectmapping.co.uk/Reviews/Resources/ATW valleys zonal map 2005.pdf
The Zones have alreay been mapped out before see
http://www.projectmapping.co.uk/Reviews/Resources/ATW valleys zonal map 2005.pdf
I was going to say, at least on individual lines, fares are essentially zoned anyway aren't they, at least in terms of prices? So I don't see why they couldn't just be made into zonal tickets.
It reiterates points made earlier Welsh Government has form on failing to fund further phases of rail projects. The number of outside Wales posters who naively believe further phases after "core valley lines" conversion to light rail will flow need to heed these lessons.
A service to Newport has been promised since the line was reopened to passengers, but requires a limited amount of redoubling. Work was started on this but has apparently been abandoned.
There are plenty of trains between Newport and Cardiff so if the train went beyond Newport a destination like Abergavenny or Cheltenham would be more useful.
Although I am not a Wales resident nor born there (I am originally from the West Midlands), I too would be very sceptical of any future phases (if at all any) after the Core Valley Lines vanity project has been converted to light rail.
In the East Midlands for example, look at the Ivanhoe Project. The first phase was completed (which was the easiest) in the first half of the 1990s, with the second phase to Coalville to follow soon after. Needless to say, the second phase has been put on the backburner since and remains incomplete.
The redoubling on the Ebbw Vale line is only necessary to provide a second train per hour, whether that goes to Cardiff or to Newport. The biggest reason for NR to down tools and leave it unfinished would be the funder weren't committed to running that second train. The line may be very successful, but the business case for a second train per hour has to take into account the extra cost of running it versus the extra revenue it could bring. It may well be the case that the numbers said the increase in benefits is smaller than the increase in costs. Unless there are other non-economic factors involved, the upfront cost of finishing the redoubling plus an increase in subsidy in perpetuity will look like a cost that the government cannot afford.
Abandoning work halfway through rather than going to completion sounds like a bad idea if you don't understand the sunk cost fallacy. If NR find out that the second train an hour isn't going to be happening, then unless there is some other compelling reason there is no benefit from any additional expenditure at all. At all times the only relevant question is about future spending - past spending is in the past and nothing can be done to change it. If future spending isn't going to provide benefits, then it doesn't matter how much you spent in the past. In a good scheme, the costs stay under control and the benefits stay the same or improve as the project goes on, meaning that the business case for spending the money needed to finish the scheme continues to improve up to infinity (when you have fractions of pounds left to spend to get billions' worth of benefit). If costs are not under control and/or the benefits decrease, then people need to be ready to cancel things entirely.
And so we go back to the idea of using LR technology to reduce operational costs. Even if the South Wales Metro still requires a subsidy after LR-ification, if the reduction in subsidy is significant then it is financially imprudent for the government not to spend a little money upfront to unlock those savings.
NR's 'credit card' was used to fund lots of improvements justified this way. The 'credit card' analogy is deeply flawed, because credit cards are normally used for discretionary spending on things which cannot have a useful economic return (e.g. holidays). The better analogy is a mortgage, as borrowing extra money on a mortgage can be a financially better option. If the cost of borrowing extra money for insulation work is less than the energy bill savings that would result, then not borrowing money is the bad option. For NR, not borrowing money to invest in signalling or capacity works is the bad option when those works cause immediate reductions in ongoing costs or increases in revenues. A scheme like Norton Bridge, for instance, can be partly funded from the savings from the reduced delays it causes.
This sounds like a very similar case. Reopening a few stations on a line which has to exist anyway for passenger services doesn't cost a lot of money. The overall ongoing cost to BR of running the MML may have stayed the same after the Ivanhoe scheme as the minimal extra cost was matched by ticket revenues. However, as soon as they would need to put in a lot of investment to be able to run an extra loss-making service, that business case ceases to exist and it never ends up happening.
Sounds very much like a variant on the "profitable core" that politicians and civil servants desperately scrambled to find without success from the early 60's onwards.
Indeed the more I read your posts with their underlying theme of supposed fiscal responsibility of light rail conversion the more I am convinced that you are pursuing a fools errand chasing the pot of gold at the end of the rainbow of a non subsidy public transport system. Public transport provides wider benefits away from the supposed negative of silo thinking subsidy. The railway doesn't live in a bubble in interacts with the wider world yet conventional cost benefit analysis is poor at recognising the societal cost of not having quality public transport especially in urban areas. If vallley lines didn't bring in those commuters every day into central Cardiff the road network down the A470 and across the M4 Interchange at Coryton would descend into total gridlock damaging the economy of the whole of South Wales. Yet the value of this is not factored into any calculations.
Public transport is not just about how cheap you can provide it.